PT PLN (Persero)

UIW (UNIT INDUK WILAYAH) BABEL


PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125850 CBM VIBRASI MINGGU KE - 2 UNIT 1 APRIL 2023


Job Plan : BT-JP-CBM-MA-01 CBM MULTIPLE ASSET VIBRASI

Task : WT130947

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125850 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:19.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT

Asset: 070200BT10 PLTU BELITUNG UNIT 1


Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10PGA20AP020 RECIRCULATING PUMP B #1
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10MAW10AN020 DRAUGHT FAN GLAND STEAM CONDENSER B #1
Location: T2 MAIN BUILDING/TURBINE LANTAI 2

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)

Page: 1
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)


09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10LCB20AP010 CONDENSATE PUMP B #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10MAJ10AP010 VACUUM PUMP A #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10LAC10AP010 FEED WATER PUMP A #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10HLE11 FEED BACK AIR FAN A SYSTEM #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :

Page: 2
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)


02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10PAC10AP010 CWP PUMP A #1
Location: CW CIRCULATION WATER

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10HNC10 INDUCED DRAUGHT FAN SYSTEM A #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10HLB21 SECONDARY AIR FAN SYSTEM A #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset:

Page: 3
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

070200BT10HLB22 SECONDARY AIR FAN SYSTEM B #1


Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10HLB12 PRIMARY AIR FAN SYSTEM B #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10HLB11 PRIMARY AIR FAN SYSTEM A #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10HNC20 INDUCED DRAUGHT FAN SYSTEM B #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)

Page: 4
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)


07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10MAV20AP020 DC OIL PUMP #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10MAV20AP030 AC OIL PUMP #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10MA STEAM TURBINE PLANT #1
Location: T3 MAIN BUILDING/TURBINE LANTAI 3

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT10PGA10AP020 C3WP PUMP B #1
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Page: 5
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130947 HELPER 1 7.0

WT130947 CBM JUNIOR 1 7.0

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 6
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125851 CBM VIBRASI MINGGU KE - 2 UNIT 2 APRIL 2023


Job Plan : BT-JP-CBM-MA-01 CBM MULTIPLE ASSET VIBRASI

Task : WT130948

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125851 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:19.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT

Asset: 070200BT20MAV20AP030 AC OIL PUMP #2


Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20PAC10AP010 CWP PUMP A #2
Location: CW CIRCULATION WATER

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20 PLTU BELITUNG UNIT 2
Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)

Page: 7
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)


09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20PGA20AP020 RECIRCULATING PUMP B #2
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20LCB20AP010 CONDENSATE PUMP B #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20LAC10AP010 FEED WATER PUMP A #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20MAA10 HP TURBINE #2
Location: T3 MAIN BUILDING/TURBINE LANTAI 3

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :

Page: 8
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)


02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20MAW10AN020 DRAUGHT FAN GLAND STEAM CONDENSER B #2
Location: T2 MAIN BUILDING/TURBINE LANTAI 2

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20PGA10AP020 C3WP PUMP B #2
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HLE11 FEED BACK AIR FAN A SYSTEM #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset:

Page: 9
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

070200BT20MAJ10AP010 VACUUM PUMP A #2


Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HLB12 PRIMARY AIR FAN SYSTEM B #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HLB11 PRIMARY AIR FAN SYSTEM A #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HLB22 SECONDARY AIR FAN SYSTEM B #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)

Page: 10
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)


07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HLB21 SECONDARY AIR FAN SYSTEM A #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HNC10 INDUCED DRAUGHT FAN SYSTEM A #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20HNC20 INDUCED DRUGHT FAN SYSTEM B #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT20MAV20AP020 DC OIL PUMP #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM VIBRASI

Page: 11
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130948 HELPER 1 7.0

WT130948 CBM JUNIOR 1 7.0

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 12
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125852 CBM THERMOGRAPHY MINGGU KE - 2 UNIT COMMON APRIL 2023


Job Plan : BT-JP-CBM-MA-02 CBM MULTIPLE ASSET THERMOGRAPHY

Task : WT130949

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125852 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:20.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT-00

Asset: 070200BT00 PLTU BELITUNG UNIT COMMON


Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00SGA00AP002 JOCKEY PUMP
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00SGA02AP001 ELECTRIC PUMP
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C

Page: 13
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

02 FAN / POMPA / TURBINE :


DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00XJ DIESEL ENGINE PLANT
Location: DE DIESEL EMERGENCY PLANT

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00QEA10AN020 COMPRESSED AIR NO 2
Location: CB COMPRESSOR AIR BUILDING

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130949 CBM JUNIOR 1 7.0

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

Page: 14
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 15
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125853 CBM THERMOGRAPHY MINGGU KE - 2 UNIT 1 APRIL 2023


Job Plan : BT-JP-CBM-MA-02 CBM MULTIPLE ASSET THERMOGRAPHY

Task : WT130950

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125853 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:20.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT

Asset: 070200BT10 PLTU BELITUNG UNIT 1


Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HLE11 FEED BACK AIR FAN A SYSTEM #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10PGA10AP020 C3WP PUMP B #1
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C

Page: 16
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

02 FAN / POMPA / TURBINE :


DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10PGA20AP020 RECIRCULATING PUMP B #1
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10MAW10AN020 DRAUGHT FAN GLAND STEAM CONDENSER B #1
Location: T2 MAIN BUILDING/TURBINE LANTAI 2

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10LCB20AP010 CONDENSATE PUMP B #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10MA STEAM TURBINE PLANT #1

Page: 17
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Location: T3 MAIN BUILDING/TURBINE LANTAI 3

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10LAC10AP010 FEED WATER PUMP A #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HLB21 SECONDARY AIR FAN SYSTEM A #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HLB22 SECONDARY AIR FAN SYSTEM B #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C

Page: 18
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HLB12 PRIMARY AIR FAN SYSTEM B #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HLB11 PRIMARY AIR FAN SYSTEM A #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HNC10 INDUCED DRAUGHT FAN SYSTEM A #1
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).

Page: 19
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Asset: 070200BT10HNC20 INDUCED DRAUGHT FAN SYSTEM B #1


Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10MAV20AP020 DC OIL PUMP #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10MAV20AP030 AC OIL PUMP #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10PAC10AP010 CWP PUMP A #1
Location: CW CIRCULATION WATER

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :

Page: 20
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10MAJ10AP010 VACUUM PUMP A #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130950 CBM JUNIOR 1 7.0

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 21
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125854 CBM THERMOGRAPHY MINGGU KE - 2 UNIT 2 APRIL 2023


Job Plan : BT-JP-CBM-MA-02 CBM MULTIPLE ASSET THERMOGRAPHY

Task : WT130951

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125854 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:20.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT

Asset: 070200BT20 PLTU BELITUNG UNIT 2


Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAJ10AP010 VACUUM PUMP A #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20LAC10AP010 FEED WATER PUMP A #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C

Page: 22
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

02 FAN / POMPA / TURBINE :


DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAA10 HP TURBINE #2
Location: T3 MAIN BUILDING/TURBINE LANTAI 3

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HLB12 PRIMARY AIR FAN SYSTEM B #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HLB11 PRIMARY AIR FAN SYSTEM A #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HLB22 SECONDARY AIR FAN SYSTEM B #2

Page: 23
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HLB21 SECONDARY AIR FAN SYSTEM A #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20PAC10AP010 CWP PUMP A #2
Location: CW CIRCULATION WATER

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HNC10 INDUCED DRAUGHT FAN SYSTEM A #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C

Page: 24
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HNC20 INDUCED DRUGHT FAN SYSTEM B #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAV20AP020 DC OIL PUMP #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAV20AP030 AC OIL PUMP #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).

Page: 25
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Asset: 070200BT20PGA10AP020 C3WP PUMP B #2


Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20LCB20AP010 CONDENSATE PUMP B #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20PGA20AP020 RECIRCULATING PUMP B #2
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAW10AN020 DRAUGHT FAN GLAND STEAM CONDENSER B #2
Location: T2 MAIN BUILDING/TURBINE LANTAI 2

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :

Page: 26
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HLE11 FEED BACK AIR FAN A SYSTEM #2
Location: BL BOILER AREA

Task : PENGAMBILAN DATA CBM THERMOGRAPHY

Task Description Condition

CEK THERMOGRAPHY PADA BAGIAN :

01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130951 CBM JUNIOR 1 7.0

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 27
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125855 CBM VIBRASI MINGGU KE - 2 UNIT COMMON APRIL 2023


Job Plan : BT-JP-CBM-MA-01 CBM MULTIPLE ASSET VIBRASI

Task : WT130952

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125855 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:21.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT-00

Asset: 070200BT00 PLTU BELITUNG UNIT COMMON


Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT00XJ DIESEL ENGINE PLANT
Location: DE DIESEL EMERGENCY PLANT

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT00SGA00MM001 DIESEL PUMP
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)

Page: 28
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)


09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT00SGA00AP002 JOCKEY PUMP
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT00SGA00AP001 ELECTRIC PUMP
Location: WA WATER TANK AREA

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)
Asset: 070200BT00QEA10AN020 COMPRESSED AIR NO 2
Location: CB COMPRESSOR AIR BUILDING

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130952 HELPER 1 7.0

WT130952 CBM JUNIOR 1 7.0

Page: 29
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 30
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

JOB CARD

No. WO : WO125849 CBM MULTIPLE ASSET PLTU BELITUNG MINGGU KE - 2 APRIL 2023
Job Plan : BT-JP-CBM-MA-01 CBM MULTIPLE ASSET VIBRASI

Task : WT130946

Site : BT Sched Start : Sched Finish :


Status : WSCH Target Start : 2023-04-10 00:00:00.0 Target Finish : 2023-04-10 07:00:00.0
Parent : WO125849 Actual Start : Actual Finish :
Work Type : CBM Report Date : 2023-04-10 10:02:17.0 On Hand Repair :
Assign : Failure Class : Reported By : 9014009BL
Priority : Person Group : CBM GL Account : 07-02-00-BT

Asset: 070200BT PLTU BELITUNG


Location: PLTUBT PLTU BELITUNG

Task : PENGAMBILAN DATA CBM VIBRASI

Task Description Condition

CEK VIBRASI PADA TITIK UKUR :


01 (MOH) MOTOR / GENERATOR OUTBOARD HORIZONTAL= ............... MM/S (RMS)
02 (MOV) MOTOR / GENERATOR OUTBOARD VERTICAL= ............... MM/S (RMS)
03 (MOA) MOTOR / GENERATOR OUTBOARD AXIAL= ............... MM/S (RMS)
04 (MIH) MOTOR / GENERATOR INBOARD HORIZONTAL= ............... MM/S (RMS)
05 (MIV) MOTOR / GENERATOR INBOARD VERTICAL= ............... MM/S (RMS)
06 (MIA) MOTOR / GENERATOR INBOARD AXIAL= ............... MM/S (RMS)
07 (FIH) FAN / PUMP / TURBINE INBOARD HORIZONTAL= ............... MM/S (RMS)
08 (FIV) FAN / PUMP / TURBINE NBOARD VERTICAL= ............... MM/S (RMS)
09 (FIA) FAN / PUMP / TURBINE INBOARD AXIAL= ............... MM/S (RMS)
10 (FOH) FAN / PUMP / TURBINE OUTBOARD HORIZONTAL= ............... MM/S (RMS)
11 (FOV) FAN / PUMP / TURBINE OUTBOARD VERTICAL = ............... MM/S (RMS)
12 (FOA) FAN / PUMP / TURBINE OUTBOARD AXIAL= ............... MM/S (RMS)

Planned & Actual Labor

Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours

WT130946 HELPER 1 7.0

WT130946 CBM JUNIOR 1 7.0

Planned & Actual Material

Task ID Itemnum Description Issue Unit Planned Qty Actual Qty

Planned & Actual Tools

Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty

Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :

2.

3.

Nama (Paraf) Spv. Operasi 1. Tanggal Pelaksanaan :


2. Nama (Paraf) Pelaksana :
Nama (Paraf) Spv. Pemeliharaan/ :
Engineering

Page: 31
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG

Job Card Report

Page: 32