PJB H Jobcard PR PM
PJB H Jobcard PR PM
JOB CARD
Task : WT130954
01 TERMINAL SISI HV
R = ............... °C
S = ............... °C
T = ............... °C
02 TERMINAL SISI LV
R = ............... °C
S = ............... °C
T = ............... °C
03 WINDING / BUSHING SISI HV
R = ............... °C
S = ............... °C
T = ............... °C
04 WINDING / BUSHING SISI LV
R = ............... °C
S = ............... °C
T = ............... °C
05 TERMINASI CONTROL (APABILA DIMUNGKINKAN :
01 TERMINAL SISI HV
R = ............... °C
S = ............... °C
T = ............... °C
02 TERMINAL SISI LV
R = ............... °C
S = ............... °C
T = ............... °C
03 WINDING / BUSHING SISI HV
R = ............... °C
S = ............... °C
T = ............... °C
04 WINDING / BUSHING SISI LV
R = ............... °C
S = ............... °C
T = ............... °C
Page: 1
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 TERMINAL SISI HV
R = ............... °C
S = ............... °C
T = ............... °C
02 TERMINAL SISI LV
R = ............... °C
S = ............... °C
T = ............... °C
03 WINDING / BUSHING SISI HV
R = ............... °C
S = ............... °C
T = ............... °C
04 WINDING / BUSHING SISI LV
R = ............... °C
S = ............... °C
T = ............... °C
05 TERMINASI CONTROL (APABILA DIMUNGKINKAN :
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 2
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130955
Page: 3
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 4
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 5
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 6
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Page: 7
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 8
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130956
Page: 9
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 10
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 11
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 12
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
Page: 13
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
3.
Page: 14
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130957
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GCF40AP001 BWRO HP PUMP B (NEW)
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBF10AP011 SWRO HP PUMP B (NEW)
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
Page: 15
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00QEA10AN010 COMPRESSED AIR NO 1
Location: CB COMPRESSOR AIR BUILDING
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBB10AP003 FILTER FEED PUMP A (NEW)
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GCL10AP001 DEMIN TRANSFER PUMP A
Page: 16
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GCF10AP010 BWRO HP PUMP
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GCF10AP002 BWRO FEED PUMP B
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GCF10AP001 BWRO FEED PUMP A
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
Page: 17
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBF10AT002 SWRO FEED PUMP B
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBF10AT001 SWRO FEED PUMP A
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBF10AP010 SWRO HP PUMP
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Page: 18
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBB10AP021 BACKWASH PUMP A
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBB10AP012 FILTER FEED WATER PUMP B
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBB10AP011 FILTER FEED WATER PUMP A
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
Page: 19
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBB10AP002 SEA WATER PUMP B
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GBB10AP001 SEA WATER PUMP A
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00GCL10AP002 DEMIN TRANSFER PUMP B
Location: WT WATER TREATMENT PLANT
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
Page: 20
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 21
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130958
Page: 22
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 23
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 24
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 25
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 26
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Page: 27
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 28
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130959
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBC10AJ020 COAL CRUSHER B
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
Page: 29
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBC10AJ010 COAL CRUSHER A
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBD10AT002 ROTARY SCREEN B
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBD10AT001 ROTARY SCREEN A
Location: CH COAL HANDLING
Page: 30
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBA10AF020 CONVEYOR 3B
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBA20AF020 CONVEYOR 4B
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
Page: 31
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBA20AF010 CONVEYOR 4A
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBA30AF010 CONVEYOR 5A
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBA10AF010 CONVEYOR 3A
Location: CH COAL HANDLING
Page: 32
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT00EBA30AF020 CONVEYOR 5B
Location: CH COAL HANDLING
01 MOTOR :
NDE = ........ °C
BODY = ........ °C
DE = ........ °C
02 GEARBOX :
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
03 PULLEY :
DE = ........ °C
NDE = ........ °C
04 TERMINASI :
R = ........ °C
S = ........ °C
T = ........ °C
ADDITIONAL
05 PANEL LOKAL
SP1 = ........ °C
SP2 = ........ °C
SP3 = ........ °C
06 CRITICAL PART LAINNYA YANG DIPERLUKAN.04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Page: 33
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 34
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130960
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10PGA20AP010 RECIRCULATING PUMP A #1
Location: WA WATER TANK AREA
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10HLE12 FEED BACK AIR FAN B SYSTEM #1
Location: BL BOILER AREA
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
Page: 35
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10PGA10AP020 C3WP PUMP B #1
Location: WA WATER TANK AREA
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10PAC20AP010 CWP PUMP B #1
Location: CW CIRCULATION WATER
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10MAJ20AP010 VACUUM PUMP B #1
Page: 36
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10LCB10AP010 CONDENSATE PUMP A #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10LAC30AP010 FEED WATER PUMP C #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT10LAC20AP010 FEED WATER PUMP B #1
Location: T1 MAIN BUILDING/TURBINE LANTAI 1
01 MOTOR / GENERATOR :
NDE= ............... °C
Page: 37
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 38
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130961
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20PAC20AP010 CWP PUMP B #2
Location: CW CIRCULATION WATER
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAJ20AP010 VACUUM PUMP B #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
Page: 39
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20LAC30AP010 FEED WATER PUMP C #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20LAC20AP010 FEED WATER PUMP B #2
Location: T1 MAIN BUILDING/TURBINE LANTAI 1
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20HLE12 FEED BACK AIR FAN B SYSTEM #2
Page: 40
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20MAW10AN020 DRAUGHT FAN GLAND STEAM CONDENSER B #2
Location: T2 MAIN BUILDING/TURBINE LANTAI 2
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20PGA10AP020 C3WP PUMP B #2
Location: WA WATER TANK AREA
01 MOTOR / GENERATOR :
NDE= ............... °C
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Asset: 070200BT20PGA20AP010 RECIRCULATING PUMP A #2
Location: WA WATER TANK AREA
01 MOTOR / GENERATOR :
NDE= ............... °C
Page: 41
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
STATOR= ............... °C
DE = ............... °C
02 FAN / POMPA / TURBINE :
DE = ............... °C
NDE= ............... °C
03 TERMINASI :
R= ............... °C
S= ............... °C
T= ............... °C
04 LAIN - LAIN (CRITICAL PART YANG DIPERLUKAN).
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 42
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
Task : WT130962
Page: 43
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 44
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 45
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
30 (PIA) PULLEY / PUMP / FAN INBOARD AXIAL = ......... MM/S (RMS) (ALL)
31 (POH) PULLEY / PUMP / FAN OUTBOARD HORIZONTAL = ......... MM/S (RMS) (ALL)
32 (POV) PULLEY / PUMP / FAN OUTBOARD VERTICAL = ......... MM/S (RMS) (ALL)
33 (POA) PULLEY / PUMP / FAN OUTBOARD AXIAL = ......... MM/S (RMS) (ALL)
Asset: 070200BT00EBA10AF010 CONVEYOR 3A
Location: CH COAL HANDLING
Page: 46
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 47
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 48
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 49
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
JOB CARD
No. WO : WO125856 CBM MULTIPLE ASSET PLTU BELITUNG MINGGU KE - 3 APRIL 2023
Job Plan : BT-JP-CBM-MA-01 CBM MULTIPLE ASSET VIBRASI
Task : WT130953
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
Task ID Tool Description Planned Hours Planned Qty Actual Hours Actual Qty
Temuan Preventive/Predictive 1.
Maintenance
(Perlu dibuat Work Order) :
2.
3.
Page: 50
PT PLN (Persero)
UIW (UNIT INDUK WILAYAH) BABEL
PLTU SUGE BELITUNG
Page: 51