Supply, Installation, Testing and Commissioning of MSPP/OTN, Batteries & Rectifiers

and
Supply Installation, Testing and Laying of Optical Fiber Cables and Accessories at
Different stations of Bangladesh Betar Station
(Contract No. 14.33.0000.681.16.131.19/25 Date: 04 June, 2020 AD)

FAT Report
Contractor Name Systems & Services Limited (SSL)
Date of Final Acceptance Test (FAT)
Site Name Rupatoli (Barishal)
Mux IP 172.21.1.212

SL Test List Test Result Remarks


1 Multiplexer
Check that MSPP Device getting power Yes  No
Check that Mux able to login Yes  No
Check that all the connection properly Yes  No
MSPP link is operational Yes  No
E1 is operational Yes  No
Internet is operational Yes  No
Check that Rectifier able to charging battery Yes  No
Battery backup Yes  No

2 Fiber link
Betar to BTCL fiber link is operational Good  Bad
OTDR Report Good Bad
ODF Termination Good  Bad
Handhole Status Good  Bad

BTCL Representative Betar Representative


Md. Arif Ahammed Tanim
Manager, Transmission, Concerned Center Head/ Unit Chief
BTCL, Barishal. and
and Member, FAT Committee.
Member, FAT Committee. Signature:
Signature:
MD. Abu Masud
Md. Shahadat Hossain PD.
DGM, Dhaka Metro-1 Modern and Digital Broadcasting Project,
BTCL, Maghbazar, Dhaka. Bangladesh Betar, Agargaon, Dhaka.
and and
Convener, FAT Committee. Member, FAT Committee.
Signature: Signature: