WE MANAGE YOUR WASTE YOU MANAGE REST

Quotation
2, Patel Nagar, Date 23/03/2022
Navagam, Udhana, Surat -394210 Quotation # BQ 1531
Phone: 8460660255 Email: business@biofics.in, sales@biofics.in Customer ID 624
Quotation For: Mr. Ankit Agrawal, Gonda, U.P Quotation valid until: 07-04-2022
Comments or Special Instructions: Prepared by: Deepika Gangrade

Bank Details Bank Name A/c Name A/c No. IFSC Code TERMS
40% advance, 30% before
Union Bank of India Biofics Pvt. Ltd 311101010215578 UBIN0531111 dispatch and 10% after
installation

Features Round the year Services(24*7) App & Website Services Automatic handling

SS 316/304/EN-08/MS FRP lined/epoxy


MOC Reporting & Documentation Installation and training
Construction

Motor/Gearbox Premium, Crompton, siemens, Bharat Bijlee All inhouse fabrications

3 factor safety system. Easy to use Control


Warranty 1 years Warranty
Systems
Taj, Marriott, TGB, Avadh, Rajhans, USP: Complete Unit Setup, Service model, Organic
Prior Experience Clubs, University, Industries(ONGC) Installed Capacity from 25kg to 5 Ton/day
campus Development

Proposal for Biogas plant for CBG

Approximate project value

QUANTITY DESCRIPTION Waste Type Output Budget amount


Biofics Greenergy
1 Cow dung 20 TPD ~1089 kgs (CNG/Methane gas) ~3.8 cr
CBG Plant
Excluding Gst and
Transportation
> Fabrication, Transportation and Installation commssioning of the above plant setup.
Our Scope-
> Handholding for 7 days for Biological commissioning and training.
> Water connections
Client scope- > 3 phase electricity connection, water connection.
> Labour for helping at the plant, unloading, necessary tools and equipments

2
Sr.No. Item Requirement Specifications

Combo: Chopper with Grinder.


1 Crusher cum Grinder Single Shaft w ith four bar mounted rotary blades with mesh
cleaning brush.

Double membrane gas holder with all safety features and


2 Gas Holder
instrumentation

Prefabricated Digestor constructed partially underground with


retention time 60 days, Internally Resin painted equipped with
3 Digester & Civil Works
horizontal type mixer and motor will be mounted outside
digestor wall.

4 Water pump For inlet feeding in the pre treatment tank for making slurry.

For Recyling slurry drawn out from the digester, fed directly to
5 Slurry Pump
the pre treatment tank

Pretreatmenet tank MS tank with FRP anti corrosion lining for prepering slurry
6
with stirrer from fresh waste, fresh water and recyled slurry

Dewatering Screw Seperation of Solid Organic fertiliser and liquid fertiliser in the
7
press unit form of non-bonded moisture from the digested slurry.

8 Gas pipelines Internal piping for digester

Safety release valves, flame arrestor type valve as per safety


9 Gas Valves
standards.
Section-4 Biogas Purification system for CNG
12 CNG purification Minor Pressure Swing Adsorption Principal operate at 0.7 Bar
system pressure, compared to standard PSA systems that operate at
6-10 Bar pressure.

13 CNG compressor
14 CNG cascade Design, Engineering, Supply & Fabrication of CNG cylinder
cascade with Main line & Vent line of Single Bank
SystemWorking
15 Gas piping
Section-2 Miscellanous
16 Consumables and
miscellenous
17 Contingency
Project timeline

Collection of Basic details of the Giving technical Complete project As per the DPR the Handholding for Post installation
requirement proposed project to assisstance to client report with all the project work initiates biological installation maintenance
information using give the client an to help choose the technical following the and training. through periodical
google form and idea of the budget, kind of project with information of the schedule decided visits and regular and
direct time duration of the technical feasibility, plant comprising upon and extranous
Technical assisstance
Initial project proposal

Plant construction and


installation

Biological installation

Plant maintenance and


upkeep
Need Assessment

Detailed Project report

communication. project and scale of economical techical progressive maintenance.


operations. feasability and specifications of the payments.
eenvironmental plant, Projected
feasability analysis of Outputs, ROI
the project calculation, Project
installaition timeline,
subsidy and loan
details, Output
selling linkages and
hand holding details. |_______________________________________|
|____________________________________________| |___________________________________________|
Initially provided upfront by Biofics To be quoted for before engagement As per the finalised budgetary quotations in DPR