Professional Documents
Culture Documents
1/6/2021 No 2
OBJECTIVE OF THE PROJECT
1. Increasing the export competitiveness of the factories by optimizing their efficiencies and improving the product
quality through the whole value chain.
2. Intensive on-job training and implementing customized solutions.
3. Connecting the factories with prospective buyers.
4. To create quality jobs to take care of the rampant unemployment for the youth of the nation.
1/6/2021 No 3
1. Chagni Ginnery, Chagni
1/6/2021 No 4
EXECUTIVE SUMMARY
►Genda wuha Cotton Ginning factory plc, Chagni Plant is a Roller Ginning Plant based in Chagni Town
►It was implemented 2 years ago and the ginning machineries are supplied and erected by Bajaj Steel
Industries Ltd.
►The ginning plant consists of 18 roller gin stands of Golden Jubilee Model.
►The annual ginning capacity of all the gin stands combined is 20,000 tons of raw cotton with an
estimated output of 7,200 tons of lint cotton.
►The ginning plant is supplied with a weighbridge of 160 tons weighing capacity.
►The mission objectives of this endeavor is to undertake baseline studies and needs assessment and
develop a road map for tackling the various challenges the plant faces while producing quality
outputs.
12/4/2020 5
EXECUTIVE SUMMARY
►The outputs of the mission will be developing a consolidated road map in view of the needs
assessment that will help the ginning plant enhance its capacity utilization and ensure quality pro-
duction thereby enhancing the skill and knowledge of the work force.
►To achieve the aforementioned outputs data collections have been conducted, interviews of top and
middle management have been undertaken and findings and feedbacks have been communicated
with the various high-ranking officials of the company.
►Strategic interventions are suggested with possible time line so that the challenges can be over-come
in due time.
12/4/2020 6
OVERVIEW OF THE OPERATIONS
►Factory Name: Genda Wuha Cotton Ginning Factory Plc, Chagni Plant
►Location: Chagni town
►Material processed: 100% cotton
Installed Capacity:
1 Area 10 Hectares
Seed Cotton
2 20,000 Ton
Processing
3 Lint Production 7,200 Ton
3 Make India
4 Age 2 Years
ACTION PLAN Targeted Areas Action to be taken
*REQUIRES INVESTMENT
Small holder farmers
management
Records management
Chemical usage guidelines
Stakeholder support and
managements
Contract implementation
Capacity building on work practices procedures
Storage management
Fire safety measures
Raw Cotton grading*
Internal communication system
Material Traceability System
Maintenance schedule
Spare parts management
Lubrication and sintering*
Ginnery cleaning time
Ginning settings
Lint Cotton grading*
Settings measurements
Standardization of process
Efficiency and utilization
parameters
Process optimization
Laboratory installation*
Technical workshop installation*
Electrical and utility consumption
REQUIRED TRAININGS
S. N. Activity M1 M2 M3 M4 M5 M6 M7 M8
4 Training on Ginning*
1/6/2021 No 13
EXECUTIVE SUMMARY
►Genda wuha Cotton Ginning factory plc, Genda Wuha Plant is a Roller Ginning Plant based in Genda Wuha Town
►It was implemented 8 years ago and the ginning machineries are supplied and erected by Bajaj Steel Industries
Ltd.
►The ginning plant consists of 18 roller gin stands of Golden Jubilee Model.
► The annual ginning capacity of all the gin stands combined is 20,000 tons of raw cotton with an estimated
output of 7,200 tons of lint cotton.
►The ginning plant is supplied with a weigh-bridge of 120 tons weighing capacity.
►The mission objectives of this endeavor is to undertake baseline studies and needs assessment and develop a
road map for tackling the various challenges the plant faces while producing quality outputs.
►The outputs of the mission will be developing a consolidated road map in view of the needs assessment that will
help the ginning plant enhance its capacity utilization and ensure quality production thereby enhancing the skill
and knowledge of the work force.
►To achieve the aforementioned outputs data collections have been conducted, interviews of top and middle
management have been undertaken and findings and feedbacks have been communicated with the various high-
ranking officials of the company.
►Strategic interventions are suggested with possible time lines so that the challenges can be over-come in due
time.
12/4/2020 14
OVERVIEW OF THE OPERATIONS
►Factory Name: Genda Wuha Cotton Ginning Factory Plc, Genda Wuha Plant
►Location: Genda Wuha town
►Material processed: 100% cotton
Installed Capacity:
S.
N.
Department Capacity Unit
1 Area 5.25 Hectares
2 Seed Cotton Processing 20,000 Ton
3 Lint Production 7,200 Ton
4 Weigh bridge Capacity 120 Ton
Cotton Farming Images
4 Age 8 Years
FACTOR COSTS
S.
Factors Values Unit
N.
1 Power Rate 0.04 USD / kWh
Total manpower
2 591.47 USD / day
wages
3 Packing cost 2.32 USD / bale
Logistics Cost
4 59,974.13 USD
(annual)
5 RM Cost 0.61 USD / kg
Other costs
6 73,966.42 USD
(annual)
ACTION PLAN
* REQUIRES INVESTMENT Targeted Areas Action to be taken
Small holder farmers management
Records management
Chemical usage guidelines
Stakeholder support and managements
Contract implementation procedures
Storage management
Capacity building on work practices
Fire safety measures
Raw Cotton grading*
Internal communication system
Material Traceability System
Maintenance schedule
Spare parts management
Lubrication and sintering*
Ginnery cleaning time
Ginning settings
Lint Cotton grading*
Settings measurements
Standardization of process
Efficiency and utilization
parameters
Process optimization
Laboratory installation*
Technical workshop installation*
Electrical and utility consumption
REQUIRED TRAININGS
S. N. Activity Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
4 Training on Ginning*
1/6/2021 No 26
EXECUTIVE SUMMARY
Bahir Dar Textile Share Company (BDTSC) is a composite textile mill situated in the town of Bahir Dar,
Installed spinning capacity - 6000 ring spindles and 2400 rotors
Installed looms - 178 air-jet and rapier looms
Processing and garments production capacity- 40,000 m of fabric and 10,000 sets of made-ups per day.
Project involves
Development of an upgrading roadmap based on a baseline study and needs assessment
Implementation of the upgrading interventions to international best practice
Managerial and technical training,
Creation of linkages between the companies and research and educational institutions
Creation of linkages with potential international buyers
1/6/2021 No 27
OBJECTIVES
1/6/2021 No 28
SPINNING MACHINERY
►Spinning
Rotor Spinning line
►Blowroom line 600kg/hr shared
►Carding machines C-60 Model -4 (integrated with drawframes)
► Drawframes RSB Modul Model - 6 (4 integrated with Carding)
►Rotor Spinning frames 923 Model- 6 (2400 installed rotors, 905 idle)
1/6/2021 No 29
WEAVING MACHINERY
Looms
►Picanol Omniplus 800 - 66 Installed, 56 operating
►Somet 112 Installed, 50 operating
1/6/2021 No 30
PROCESSING AND GARMENTS PRODUCTION CENTRES
1/6/2021 No 31
DEPARTMENT-WISE ASSESSMENT
1/6/2021 No 32
BLOWROOM SUMMARY
1/6/2021 No 33
CARDING SUMMARY
Covered sensor
1/6/2021 No 34
ROTOR SPINNING
3000
Idle rotor units
Damaged rotors
2500
2000
1500
1000
500
Idle 905 Operational 1495
0
Rotors
1/6/2021 No 35
WARPING AND SIZING
►Buried Ends
4. Uneven Beam
1/6/2021 No 36
WEAVING
1/6/2021 No 37
PROCESSING AND OTHERS
1/6/2021 No 38
KEY INTERVENTIONS
►Capacity building-
Process Management
Maintenance management*
Time management
►Process Parameters
Atmospheric control*
Settings optimization
Waste reduction
Compressed air management*
Efficiency
►Short term Experts- Card Wire mounting*
1/6/2021 No 39
PROPOSED INTERVENTION ROADMAP
S. N. Activity Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
1 Planning and meeting with Client
2 Implementation - Mixing, Blow Room & Carding
3 Training on Mixing & Blow Room
4 Training on Carding
5 Retraining on Mixing, Blow Room & Carding
6 Implementation - Draw Frame & Speed Frame
7 Training of Draw Frame & Speed Frame
8 Implementation - Ring frame, Autoconer and Rotor
9 Training on Ring Frame & Rotor
10 Training on Autoconer
11 Retraining on Ring Frame, Autoconers and Rotor
12 Training on Quality & Maintenance - Spinning
13 Overall training of Management on Process Monitoring
14 Training on Warping & Sizing
15 Training on Weaving - Loom shed
16 Retraining on Warping, Sizing and loomshed
17 Training on Quality & Maintenance - Weaving
18 Training on fabric pre-processing
19 Training on fabric dyeing
20 Training on fabric printing
21 Training on fabric finishing
22 Training on Quality and maintenance- Processing
23 Retraining on Processing
24 Marketing Strategy development
25 Reports
1/6/2021 No 40
SHORT TERM INVESTMENT NEEDS
Spinning spares
Card wire replacement
Drawing (Autolevellers)
Rotor Spinning (Electrical and Mechanical)
Weaving Spares
Warping Spares (Expandable comb, creel repairs)
Picanol loom Spares (Electrical and Mechanical)
Overhead Travelling Cleaners
1/6/2021 No 41
INVESTMENTS
Item No Department Description Impact
1/6/2021 No 42
4. Kombolcha Textiles,
Kombolcha
1/6/2021 No 43
EXECUTIVE SUMMARY
Kombolcha Textile Share Company (KTSC) is a composite textile mill situated in the town of Kombolcha, N.East Ethiopia
Installed spinning capacity - 13200 ring spindles and 528 rotors
Installed looms - 113 rapier looms
Processing production- 20000m per day.
Project involves
Development of an upgrading roadmap based on a baseline study and needs assessment
Implementation of the upgrading interventions to international best practice
Managerial and technical training,
Creation of linkages between the companies and research and educational institutions
Creation of linkages with potential international buyers
1/6/2021 No 44
OBJECTIVES
1/6/2021 No 45
INSTALLED MACHINERY
►Blowroom Trutszchler
►Carding
Trutszchler TC-07, TC-11 Models – 4 Nos
Marzoli C601N Model - 7 Nos
►Drawing
Rieter SB-D-40, 50; RSB-D-50 Models – 6 Nos
Trutszchler TD-01, TD-02 Models – 2 Nos
►Speedframe
Zinser 668 Model – 3 Nos
►Ringframe
Zinser 351 Model - 11 Ringframes (13200 spindles)
►Winding
Autoconer 238 4 Nos
Autoconer 338- 2 Nos
►Rotor spinning S-360 – 2 Nos (528 Rotors)
1/6/2021 No 46
Weaving
Karl
1 In operation
1 Warping Meyer
Elitex 2206 2 One was not in operation
Karl
1 In operation
Meyer
2 Sizing Rotal 82-89 1 Not in operation
Rotal -
1 Operational
sucker
Textima-
Textima 2 In working condition
3 Drawing-In 220
Ficher FHCC-C 2 In working condition
Optimax-
Picanol 50 In working condition
8-R
Sulzer G6300 17 In working condition
4 Looms
Sulzer G6300F 21 In working condition
Dornier HTV4-E 10 Operational
Saurer G2 15 Operational
1/6/2021 No 47
Processing
Singeing &
1 Omez 1929 1 Operational
Desizing
2 Scouring Textima 6004 1 Operational
3 Bleaching Goller 9934 1 Operational
4 Dyeing Benninger 2400 1 Operational
5 Washing Goller 9936 1 Operational
6 Drying Goller 9936 1 Operational
7 Stenter Monfort 45T77507 1 Operational
Operational
8 Calendar 10234 1
Comerioercole
1/6/2021 No 48
Garments
1 Protex Ty 1130 16 Operational
2 Mareew ML 550 10 Operational
Sewing Machines
3 Juki D.DL 5550 13 Operational
4 Juki New LH 3568 A 5 Operational
5 Juki LH-3128-7 5 Operational
DDR- Operational
6 Textima 15
13345310
7 Pegasus Ls2-01 spec.4 8 Operational
8 Hanma Hm-757F-516 3 Operational
9 Juki mo-67145 5 Operational
10 Protex TY-373 1 Operational
Operational
11 Buttonhole Sewing JH 26009 1
1/6/2021 No 49
DEPARTMENT WISE ASSESSMENT
1/6/2021 No 50
BLOWROOM OBSERVATIONS AND ASSESSMENT
1/6/2021 No 51
CARDING OBSERVATIONS AND ASSESSMENT
1/6/2021 No 52
DRAWFRAME
Fluff removal
►Poor top roller maintenance
►Poor fluff removal
1/6/2021 No 53
ROVING FRAME
1/6/2021 No 54
SPINNING AND AUTOCONER
1/6/2021 No 55
RING SPINNING AND AUTOCONER
Roving bobbin color mixup Mixed color cones High nep content
1/6/2021 No 56
WARPING AND SIZING
1/6/2021 No 57
WARPING AND SIZING
► No tension discs,
Warp contamination
Improper cone storage
1/6/2021 No 58
WEAVING
1/6/2021 No 59
PROCESSING AND OTHERS
1/6/2021 No 60
INITIAL INTERVENTION
►Capacity building-
Process Management
Maintenance management
Time management
►Process Parameters
Atmospheric control
Settings optimization
Waste reduction
Efficiency optimization
1/6/2021 No 61
PROPOSED INTERVENTION ROADMAP
S. N. Activity Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
1 Planning and meeting with Client
2 Implementation - Mixing, Blow Room & Carding
3 Training on Mixing & Blow Room
4 Training on Carding
5 Retraining on Mixing, Blow Room & Carding
6 Implementation - Draw Frame & Speed Frame
7 Training of Draw Frame & Speed Frame
8 Implementation - Ring frame, Autoconer and Rotor
9 Training on Ring Frame & Rotor
10 Training on Autoconer
11 Retraining on Ring Frame, Autoconers and Rotor
12 Training on Quality & Maintenance - Spinning
13 Overall training of Management on Process Monitoring
14 Training on Warping & Sizing
15 Training on Weaving - Loom shed
16 Retraining on Warping, Sizing and loomshed
17 Training on Quality & Maintenance - Weaving
18 Training on fabric pre-processing
19 Training on fabric dyeing
20 Training on fabric printing
21 Training on fabric finishing
22 Training on Quality and maintenance- Processing
23 Retraining on Processing
24 Marketing Strategy development
25 Reports
1/6/2021 No 62
INVESTMENTS
Spinning spares
Drawing (Autolevellers, top cots)
Roving frame (top rollers and mesh aprons replacement)
Rotor Spinning (Assorted)
Weaving Spares
Warping Spares (Creel repairs)
Loom spares (Assorted)
1/6/2021 No 63
INVESTMENT
1/6/2021 No 64
5. Abay Garments,
Gondor
1/6/2021 No 65
CONTENT
1. Background
2. Objective
3. Product Mix
4. Key Performance Indicators and Analysis
a. Sewing Productivity
b. Man to Machine Ratio (MMR)
c. Quality (Defects & Rejections)
d. Cut to Ship
e. Absenteeism & Attrition
5. Summary
6. Current Challenges as per Factory Visit
7. Findings
1/6/2021 No 66
BACKGROUND
►Abay garment factory was established in the year 2018 and is a part of Abay Industrial Development
Share company. It is situated in Amhara Regional State, Central Gondar, Azezo Industrial Village,
Gondar, Ethiopia over a total plot area of 40,000 square meters.
►The factory has 3(three) sheds totaling to an area of 16,853.18 square meters.
►There are a total of 897 sewing machines with a total installed capacity of 26,838 pcs/day with 48
lines in total including both Knits and Woven products like T-Shirt, Polo, Leggings, Shirts, Khaki pants
and Denim.
►The factory has invested in state-of-art washing, embroidery and screen-printing facilities. Due the
pandemic, these machines couldn’t be installed and commissioned.
1/6/2021 No 67
BACKGROUND
►Currently, the factory has a total of 660 employees, out of which 510 are sewing operators.
►The current team from Production, Merchandising and Marketing is fresh and inexperienced,
especially for catering to the export market. They have to be handheld by extensive on-job training.
►The financial status of the factory is not stable, especially to take care of the operational expenses as
the company did not have continuous orders since the past few months.
►They are surviving on some subcontracted orders which has miniscule margins as compared to the
large overheads incurred on a monthly basis. The factory has reserves for prospective merchandising
and marketing expenses which is a positive element.
►As required in deliverable 4, the company has been connected to two major buyers, H&M and Dollar
Global.
1/6/2021 No 68
OBJECTIVE
The main objective of this assignment would be “Gap Analysis of the Factory”
1/6/2021 No 69
CUTTING FLOOR
1/6/2021 No 70
SEWING FLOOR
1/6/2021 No 71
UNINSTALLED MACHINES
1/6/2021 No 72
PRODUCT MIX
Month T-Shirt Polo Shirt Facemask Others Product Mix (May'20 to October'20)
2.330; 2% 1.130; 1%
May-20 3,804 11,779 580 45
1/6/2021 No 73
SUMMARY
1/6/2021 No 79
CURRENT CHALLENGES AS PER FACTORY VISIT
7. Performance monitoring for workers and JD & KPI for staffs is missing
1/6/2021 No 80
FINDINGS & SUGGESTIONS
►Lack of system, SOP, reports, JDs, training (staffs & workers both) across all sections (including marketing & merchandising)
►Lack of technology, infrastructure, storage & handling equipment, software in HR and Finance
►Lack of maintenance system, existing machines not working (e.g., Gerber automatic spreader & cutter, pattern making software)
overall 203 machines are un-commissioned due to Covid impact
►Out of 897 sewing machines, 37 (4%) of them are not working, due to inadequate maintenance manpower
1/6/2021 No 81
MONTHS January, 21 February, 21 March, 21
WEEKS 1 2 3 4 5 6 7 8 9 10 11
IMPLEMENTATION
10-Mar-2021
11-Mar-2021
11-Mar-2021
12-Mar-2021
13-Mar-2021
14-Mar-2021
15-Mar-2021
16-Mar-2021
17-Mar-2021
18-Mar-2021
10-Jan-2021
11-Jan-2021
12-Jan-2021
13-Jan-2021
14-Jan-2021
15-Jan-2021
16-Jan-2021
17-Jan-2021
18-Jan-2021
19-Jan-2021
20-Jan-2021
21-Jan-2021
22-Jan-2021
23-Jan-2021
24-Jan-2021
25-Jan-2021
26-Jan-2021
27-Jan-2021
28-Jan-2021
29-Jan-2021
30-Jan-2021
31-Jan-2021
10-Feb-2021
11-Feb-2021
12-Feb-2021
13-Feb-2021
14-Feb-2021
15-Feb-2021
16-Feb-2021
17-Feb-2021
18-Feb-2021
19-Feb-2021
20-Feb-2021
21-Feb-2021
22-Feb-2021
23-Feb-2021
24-Feb-2021
25-Feb-2021
26-Feb-2021
27-Feb-2021
28-Feb-2021
1-Mar-2021
2-Mar-2021
3-Mar-2021
4-Mar-2021
5-Mar-2021
6-Mar-2021
7-Mar-2021
8-Mar-2021
9-Mar-2021
8-Jan-2021
9-Jan-2021
1-Feb-2021
2-Feb-2021
3-Feb-2021
4-Feb-2021
5-Feb-2021
6-Feb-2021
7-Feb-2021
8-Feb-2021
9-Feb-2021
Activities
fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri
Industrial Engineers
1)Introduction to IE concepts
Session 1
Session 2
Session 3
b)Method Study and Time Study
c)Understanding of SAM, SMV, Efficiency and Performance
d)Understanding of Capacity Study and Capacity Utilization
TEST
2) Understanding of Planning Tools
Training of middle
c)Understanding of T & A
Session 4
Session 5
d)Importance of Order Initialization
e)Understanding the Process Flow in Sampling Room
f)Various Stages of Sampling
TEST
21 to 8 Mar, 21
3)QUALITY:
Engineers
Training of trainers: 09
b)Understanding the concept of DHU
Session 6
Session 7
c)Knowledge of AQL
d)Understanding of Quality SOP
e)Understanding the Style Start up, Quality SOP
4)Code Of Conduct
TEST
HR Department
Implementation: 12 Apr, 21
& Industrial
Engineers
a) Understanding the Concept of Absenteeism and Labor Turnover
Session 8
b)Principle of 6S
c)Attributes of Social Compliance
INSTALLATION OF SOP & RELEVANT TOOLS
Cutting Department
Work Content Analysis in Cutting department
Sewing Department
Time Study of running Style, Style Analysis at sampling stage
Core Team
Define Standard Allowed Minutes (SAM) for sewing operations
Building Data base of Operations with SAM
Operation Bulletin, Batch Layout Preparation
Production Data Capture
Efficiency calculation and monitoring
Finishing Department
Analysis of work content in Finishing processes
Allocate SAM value for Finshing Processes
Database development of SAM for Finishing Operations
Production Data Collection for analysis
Efficiency calculation and monitoring
Quality Department
Installation of MIS for data collection and analysis of rejection at initial/inline/final
inspection stage.
Data collection to calculate % DHU and rework percentage.
1/6/2021 No 82
6. Telaje Garments,
Kombolcha
1/6/2021 No 83
CONTENT
1. Background
2. Objective
3. Product Mix
4. Key Performance Indicators and Analysis
a. Sewing Productivity
b. Man to Machine Ratio (MMR)
c. Quality (Defects & Rejections)
d. Cut to Ship
e. Absenteeism & Attrition
5. Summary
6. Current Challenges as per Factory Visit
7. Findings
1/6/2021 No 84
BACKGROUND
►Telaje Garment Manufacturing and Sales PLC is a denim garment manufacturing company located at Kombolcha
town
►It started production in 2017 with a design production capacity of 4,600 pcs per day.
►The promoters of the factory are Tiret Corporate and Ambassel Trading PLC.
1/6/2021 No 85
OBJECTIVE
The main objective of this assignment would be “Gap Analysis of the Factory”
1/6/2021 No 86
PRODUCT MIX
Production Production
Product Type U/M Percentage Mix
Capacity/Day Capacity/annum
1/6/2021 No 87
CUTTING FLOOR
1/6/2021 No 88
SEWING FLOOR
1/6/2021 No 89
WASHING FLOOR
1/6/2021 No 90
UNUTILIZED MACHINES
1/6/2021 No 91
SUMMARY
3 Quality (Defects) % NA 5%
1/6/2021 No 94
CURRENT CHALLENGES AS PER FACTORY VISIT
►Despite its large designed production capacity, Telaje Garment Manufacturing & Sales PLC had been underperforming (utilizing
only 5% of its capacity)
►It is unable to attract international buyers, running with shortage of working capital, and are in high amount of financial loss due
to different internal and external factors).
►Taking the data of last six months during the survey, the average factory efficiency is 23% and the sewing labor productivity is 4
pcs/shift/person.
►During the survey time, the factory was not operational since September, 20 due to some legal issues with the recently
terminated 227 workers (On September 23, 2020). It is hoped to be solved by the end of December 20.
►With 8 lines, the factory has a potential capacity of 675,754 jeans trouser per 6 months.
►The actual production of sewing line is only 30,817 pcs of jeans trouser which implies capacity utilization of 5%.
►The Cost per SAM was ETB 3.4 (June,20) , ETB 3.78 (July, 20), ETB 8.50 (Aug, 20), ETB 49.50 (Sep, 20) , which are too high as
to an international average of ETB 1.5
1/6/2021 No 95
FINDINGS & SUGGESTIONS
►They urgently need to invest in purchasing some very important assets like Boiler, water tank and Embroidery machine.
►The Tiret Corporate had requested the consultant to develop a turn around business Plan to revive the factory as a part of their
short-term revival strategy.
►After discussing with the shareholders and other stakeholders, the corporate finally approved a budget of ETB 10.5 Million.
►Involvement of the consultant right from the operator selection stage to the final operations.
►STE requirement:
Washing Expert
Master Trainer (Sewing)
Sewing Maintenance
1/6/2021 No 96
MONTHS March, 21 April, 21 May, 21
WEEKS 1 2 3 4 5 6 7 8 9 10 11
10-May-2020
11-May-2020
12-May-2020
13-May-2020
14-May-2020
15-May-2020
16-May-2020
17-May-2020
18-May-2020
19-May-2020
20-May-2020
21-May-2020
22-May-2020
23-May-2020
24-May-2020
25-May-2020
26-May-2020
27-May-2020
28-May-2020
29-May-2020
30-May-2020
31-May-2020
22-Mar-2020
23-Mar-2020
24-Mar-2020
25-Mar-2020
26-Mar-2020
27-Mar-2020
28-Mar-2020
29-Mar-2020
30-Mar-2020
31-Mar-2020
10-Apr-2020
11-Apr-2020
12-Apr-2020
13-Apr-2020
14-Apr-2020
15-Apr-2020
16-Apr-2020
17-Apr-2020
18-Apr-2020
19-Apr-2020
20-Apr-2020
21-Apr-2020
22-Apr-2020
23-Apr-2020
24-Apr-2020
25-Apr-2020
26-Apr-2020
27-Apr-2020
28-Apr-2020
29-Apr-2020
30-Apr-2020
1-May-2020
2-May-2020
3-May-2020
4-May-2020
5-May-2020
6-May-2020
7-May-2020
8-May-2020
9-May-2020
1-Apr-2020
2-Apr-2020
3-Apr-2020
4-Apr-2020
5-Apr-2020
6-Apr-2020
7-Apr-2020
8-Apr-2020
9-Apr-2020
INTERVENTION TIMELINE Activities
ENABLERS
montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun montue wedthu fri sat sun mon
TRAINING SESSION
Industrial Engineers
1)Introduction to IE concepts
Session 1
Session 2
Session 3
b)Method Study and Time Study
c)Understanding of SAM, SMV, Efficiency and Performance
d)Understanding of Capacity Study and Capacity Utilization
TEST
Training of middle
2) Understanding of Planning Tools
Session 4
Session 5
d)Importance of Order Initialization
e)Understanding the Process Flow in Sampling Room
f)Various Stages of Sampling
TEST
Engineers
b)Understanding the concept of DHU
Apr, 21 to 8 May, 21
Session 6
Session 7
c)Knowledge of AQL
d)Understanding of Quality SOP
e)Understanding the Style Start up, Quality SOP
4)Code Of Conduct
TEST
HR Department
& Industrial
Engineers
21 to 11 Aug, 21 a) Understanding the Concept of Absenteeism and Labor Turnover
Session 8
b)Principle of 6S
c)Attributes of Social Compliance
INSTALLATION OF SOP & RELEVANT TOOLS
On time deilvary/ Material on time
Lead Time related data collection
Evaluating Information requirement in sampling department.
Streamlining Information sharing between Merchandising,Sampling & Production
departments
Sampling Data Collection thorugh MIS
Cutting Department
Work Content Analysis in Cutting department
Sewing Department
Time Study of running Style, Style Analysis at sampling stage
Core Team
Define Standard Allowed Minutes (SAM) for sewing operations
Building Data base of Operations with SAM
Operation Bulletin, Batch Layout Preparation
Production Data Capture
Efficiency calculation and monitoring
Finishing Department
Analysis of work content in Finishing processes
Allocate SAM value for Finshing Processes
Database development of SAM for Finishing Operations
Production Data Collection for analysis
Efficiency calculation and monitoring
Quality Department
Installation of MIS for data collection and analysis of rejection at initial/inline/final
inspection stage.
Data collection to calculate % DHU and rework percentage.
Core Team
Design single page excel based compilation of MIS
Analyze data generated from MIS
Finalizing Baseline
Final Presentation to Stake Holders
1/6/2021 No 97