RENCANA KEBUTUHAN BAHAN

URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH


Besi 10 18.00 Batang 65,000.00 1,170,000.00
Besi 8 18.00 Batang 45,000.00 810,000.00
Besi 6 6.00 Batang 32,000.00 192,000.00
Kawat Beton 2.00 kg 23,000.00 46,000.00
-
Beton 3.50 -
Semen 12.00 Zak 60,000.00 720,000.00
Pasir Cor 2.00 m3 300,000.00 600,000.00
Split 2.00 m3 300,000.00 600,000.00
Pasir Pasang 2.00 m3 250,000.00 500,000.00
Paku 3.00 kg 23,000.00 69,000.00
Papan 10.00 Batang 25,000.00 250,000.00
kaso 25.00 Batang 16,000.00 400,000.00
Multiplek 7.00 Lembar 100,000.00 700,000.00
Hebel 2.00 m3 650,000.00 1,300,000.00
Perekat Batan Ringan 2.00 zak 150,000.00 300,000.00
JUMLAH 7,657,000.00