Description Buffer Bin Volume Fluctuation

Feed to kiln
Case 1 case 2
AF feed to kin lines [m³/min) #REF! #REF!
volume lost has to
stoppage duration [min] #REF! #REF! operation => incre
recover time [min] #REF! #REF!

AF volume lost in stoppage [m³] #REF! #REF!


lost + feed volume [m³/h] #REF! #REF!
capacity incl. recovery [t/h] #REF! #REF!
increase system capacity by [t/h] #REF! #REF!
volume lost has to be regained during normal
operation => increased feed capacity.

this shows that capacity of equipment shall be


increase to recover AF volume lost during a short stop.
revised system capacity to be indicated in input sheet
for 2nd interation calculation.