3 of 5
1 SKETCH
2
3 Total Heat Load = Heat Load Luas Ruangan + Heat Load Okupansi (Jumlah Orang) + Heat Load Lighting + Heat Load Equipment
4
5 a. Head Load Luas Ruangan (btu)= Panjang (m) x Lebar (m) x 368.5 (Average Value, Ashrae 2001 Tabel 16 Page 29.17)
6 b. Head Load Okupansi (btu)= Jumlah orang x 550 (Standing& Walking, Ashrae 2001 Tabel 1 Page 29.17)
7 c. Head Load Lighting (btu) = jumlah lampu x watt x 3.412
8 d. Heat Load Equipment (btu) = jumlah equipment x watt x 3.412
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47 Keterangan:
48 1. Daya Lampu = 20 watt
49 2. Daya Komputer = 100 watt
50 3. Daya Laptop = 65 watt
51 4. Daya Printer = 900 watt
52
53
54
55
56
57
58
59
60 NOTES
61
62 1. All Dimension are in Milimeters and elevation in Meters
63
64
65
#REF!

DOCUMENT NO. #REF!


#REF! PAGES
#REF!
4 of 5
1 SKETCH
2
3
4 Total Heat Load = Heat Load Luas Ruangan + Heat Load Okupansi (Jumlah Orang) + Heat Load Lighting + Heat Load Equipment
5
6 a. Head Load Luas Ruangan (btu)= Panjang (m) x Lebar (m) x 368.5 (Average Value, Ashrae 2001 Tabel 16 Page 29.17)
7 b. Head Load Okupansi (btu)= Jumlah orang x 550 (Standing& Walking, Ashrae 2001 Tabel 1 Page 29.17)
8 c. Head Load Lighting (btu) = jumlah lampu x watt x 3.412
9 d. Heat Load Equipment (btu) = jumlah equipment x watt x 3.412
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49 Contoh: Perhitungan Heat Load
50
51 1. Panel Room:
52 Dimensi Ruangan :
53 a. Panjang = 10 M g. Heat Load Ruangan = 16850 BTU
54 b. Lebar = 5 M h. Heat Load Okupansi = 2800 BTU
55 c. Luas = 50 M2 i. Heat Load Lightning = 2766.2 BTU
56 d. Jumlah Orang = 7 orang j. Heat Load Equipment = 0.005 BTU
57 e. Jumlah Lampu = 9 @ 20 watt k. Total Heat Load Ruangan = 22416 BTU
58 f. Jumlah equipment = 1
59
60 NOTES
61
62 1. All Dimension are in Milimeters and elevation in Meters
63
64
65
CALCULATION

DOCUMENT NO. #REF!


#REF! PAGES
#REF!
5 of 5

TABEL PERHITUNGAN KEBUTUHAN HVAC


Dimensi Lightning Equipment
Jumlah H.L Ruangan H.L Okupansi H.L Ligthning H.L Equipment Total Heat Load
No Deskripsi
Lebar orang Jumlah Kapasitas Deskripsi (BTU) (BTU) (BTU) (BTU) (BTU)
Panjang (m) (m) Luas (m2) (Watt) Kapasitas (Watt)
A FIRST FLOOR

1 Staff room and cafetaria 6.23 5.0 31.13 12 6 120 a. Kompor 600.0 11,469.56 6,600.00 2,456.64 2,047.20 22,573.40
b. Dispenser 350.0 0 0 0 1,194.20 1,194.20
c. DLL 150.0 0 0 0 511.80 511.80

2 Panel room 3.80 2.50 9.50 2 2 40 a. Panel 600.0 3,500.75 1,100.00 272.96 2,047.20 6,920.91

2 Supervisor Maintenace Room 5.0 3.73 18.63 4 4 80 a. Laptop 400.0 6,863.31 2,200.00 1,091.84 1,364.80 11,519.95

3 Operator and Locker Room 7.50 5.0 37.50 8 6 120 a. Laptop 800.0 13,818.75 4,400.00 2,456.64 2,729.60 23,404.99

4 Enterance Hall 5.0 3.55 17.75 6 4 80 a. Komputer 600.0 6,540.88 3,300.00 1,091.84 2,047.20 12,979.92

5 Prayer Room 5.0 3.55 17.75 10 4 80 a. Laptop 100.0 6,540.88 5,500.00 1,091.84 341.20 13,473.92

7 Pantry 3.55 2.50 8.88 3 2 40 a. Kompor 600.0 3,270.44 1,650.00 272.96 2,047.20 7,240.60
b. Dispenser 350.0 1,194.20 1,194.20
c. DLL 150.0 511.80 511.80

Total First Floor 101,525.68

B Second Floor

1 Control Room 10.0 6.26 62.55 10 9 180 a. Komputer 1000.0 23,049.68 5,500.00 5,527.44 3,412.00 37,489.12
b. Server Rack 1000.0 - - - 3,412.00 3,412.00

2 Meeting room 6.26 5.0 31.28 10 8 160 a. Laptop 1000.0 11,524.84 5,500.00 4,367.36 3,412.00 24,804.20

3 OH Manager Room 5.0 5.0 25.0 3 6 120 a. Komputer 300.0 9,212.50 1,650.00 2,456.64 1,023.60 14,342.74

3 Supervisor Room 1 3.57 3.8 13.57 4 4 80 a. Komputer 400.0 5,001.87 2,200.00 1,091.84 1,364.80 9,658.51

4 Supervisor room 2 3.93 3.8 14.92 4 4 80 a. Komputer 400.0 5,498.98 2,200.00 1,091.84 1,364.80 10,155.62

5 Document room 3.0 2.50 7.50 2 2 40 a. Document 200.0 2,763.75 1,100.00 272.96 682.40 4,819.11

Total Ground Floor 104,681.29

C Electrical House

1 Panel Room 10.0 10.0 100.0 2 20 400 a. Panel 200.0 33,700.00 1,100.00 27,296.00 682.4 31,389.20

2 Engine Room 10.0 5.0 50.00 5 8 160 a. Engine 500.0 16,850.00 2,750.00 4,367.36 30.00 23,997.36

Total Ground Floor 55,386.56

Total Heat Load 261,593.53

Maka Total Heat Load yang ada pada office adalah


= 261,593.53 BTU