You are on page 1of 2

Production Schedule

Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Names: Brian Collis Sheet

Production Title: K-Pop music video 0 of 0

DATE / PRE / PROD / TO BE TO BE


TASK
LESSON: POST COMPLETED BY? RESCHDULED?
Have interview with the dancers
from Dance/ Performing arts and Has been
04/04/2024 Pre-Production 04/03/2024
explain what they are doing and completed
get contact information
To be
completed the
Send dancers the track so they
04/03/2024 production 04/03/2024 night of writing
can choreograph a dance for it
this
(04/03/2024)
Complete most of pre-production Could be
Pre-
04/03/2024 paperwork (excluding the script 08/03/2024 rescheduled for
production
and storyboards) 11/03/2024
This depends
on how quick I
Pre- Ask technician Steve for can get the
04/03/24 08/04/24
production equipment to hire out dancers to
choreograph a
piece
This depends
on how long i
spend
researching
about the outfits
Pre- Plan out costumes/ outfits for 15/03/24- and seeing how
04/03/24
production dancers 25/03/24 long it may take
for me to
design them or
get influence
from other
sources.
This will not
need to be
rescheduled
Have training done for using the due to me and
08/03/24 Pre-Production 15/03/24
Gimbal. Steve the
technician
sorting this date
out.
Has been
completed and
Contact head of media to see
will find out
08/03/24 Pe-production about the possibility of filming on 08/03/24
soon if this will
the roof of the college
be possible to
happen
This may
change due to
Contact the council about the
how early I
08/03/24 Pre-production possibility of cornering places off in 11/03/24
have in mind of
Poole park.
the date of
filming
This may
change due to
To contact Richard Batt about how how the
08/03/24 Pre-production the dancers are getting on with the 02/04/24 dancers are
choreography. getting on with
the
choreography.
08/03/24 Pre- To draft up an AV (audio visual) 15/03/04- This will take a
production script and then furthermore have 25/03/04 large part of my
my Video teacher Paul to look over half term due to
it and see how he thinks I may how important
have to edit or tweak it . this is and this
may have to
change due to if
Paul has any
ideas for me to
add.

Depends on
Film on the time span of two days
what happens
Production in a row and get all the filming
TBD TBD closer to the
done
day of filming

Might have to film on another two- Depends on if


Production day span depending on if any people fall ill or
TBD TBD
sickness or illness happens sickness

Depending on if I finish filming all This will all


my shots, I would like to start depend on if I
editing from that Point onwads and manage to
TBD Production would like to spend around 2 TBD finish the
weeks straight editing said music filming in time
video. that I would like
to finish by.

You might also like