You are on page 1of 5

Undercarriage Installation Cust.

Refresentatives
Division Head
Sign by
Technician
Check Sheet
PT. KOMATSU UNDERCARRIAGE INDONESIA For D155 Idler Assembly
Customer Name : Note :

Model :
Machine Information

Serial Number :

Code Unit :

Date of Installation :

SMR of Installation :

Jobsite Location :

Undercarriage Installed by :

Distributor :
No. Description/Point check Standard/ Refference Actual : Remark

Frame
Ref : Wear Max 2 mm

Check wear plate condition on Ref : Wear Max 3 mm


1 Please take a picture for evidence
Frame 9 mm
Idler

Std Clearance (a) = 0.5 ~ 1.0 mm


Permissible clearance 3.0 mm

Clearance (a) between Guide


2 Please take a picture for evidence
Undercarriage Installation Point Check

plate and Track Frame

Std Clearance (b) + ( c) = 2mm


Permissible clearance 5 mm
* Normal Condition, clearance (c) = 0 mm.

Clearance (b) between Support


& Guide plate + clearance (c )
3 Please take a picture for evidence
between Vertical Guide &
Wear Plate

Location of KUI Stamp

Please record KUI stamp


4 Please take a picture for evidence
number of Idler

KUI Stamp

After installation completelly, please check that


Idler can running smoothly, if not running
smoothly to anticipate please do not directly
5 Check Jammed condition operate but please move forward and Please take a picture for evidence
backward until Idler can running smoothly
Maintenance of Undercarriage

Please adjust Track tension


6 according to the Shop Manual Please take a picture for evidence
after Undercarriage Installation

Track tension : 20 - 30 mm

Please cleaning undercarriage


7 before Installation Undercarriage clean before installation Please take a picture for evidence

You might also like