You are on page 1of 1

TANZANIA GEOTHERMAL DEVELOPMENT COMPANY LIMITED

WEEKLY ZTF 240 PUMP CHECKLISTS


Runing Hours:
Issue Compliance Comment (if any.)
YES NO
pump clean, in good condition, free of spillages
connections free of leaks, and fitting contacts,
ok?
Gear lever, ok? Not stuck?
Is cooling water level on the shaft side normal?
Is the pump control panel in good working
condition?
Engine oil level, ok?
Diesel filter ok, fuel tank cap secured?
Radiator, no leaks?
Coolant level ok
Air cleaner, ok?
Battery charge and terminals; free of corrosion,
tight?
Control Cabinet ok, electrical wiring ok, no
signs of wear no loose connections?

START THE ENGINE


The pump starts normally (idle run for 5 min.)
No unusual sound, smell, etc.
No alarms
Pump free from leaks?
Is there any abnormal vibrations?
What is the amount of fuel in the pump?

Name Date Signature


Prepared by
Checked by
Approved by

You might also like