REPORT:
Descriptive report:
Our goal is to create an efficient and secure machine that will allow the worker
doing the drilling process without any superior knowledge and taking any unnecessary
risks, apart from that, we will be choosing the best way to control the machine (Either
by PLC or a wired version)
In order to ensure the security of the worker, we will be using the necessary
protections for the electrical scheme, such as magnetothermics, fuses and relays, as
well as a correctly designed circuit to avoid short circuits or jamming between
contactors.
First of all, every security measure and mechanism must be alright when it
comes to the functioning of the electrical sequence.
Manual mode:
By pressing S3, the drill bit will start rotating (Activating KM3) , after that, the
drill will be ready to lower the head by pressing S4 (KM2 activated), once it arrives the
bottom limit switch KM2 will deactivate and it will wait for 5 seconds, after which, the
drill bit will stop (KM3) and KM1 will activate moving the drill upwards until it reaches
the upper limit switch.
2
Automatic mode:
On the other hand, if the automatic mode is chosen, the process will be the
same as the previous one but it will automatically start lowering the head after
pressing S3. so that there is no need to press the S4 button.
STOP:
If by any chance the S1 (Stop) button is pressed, the system will automatically
stop, and the only way to move the drill upwards will be by pressing the S5 button.
Realization:
In order to design and plan this project, various softwares have been needed, thanks to
them, we have been able to create high quality schemes and diagrams as well as
programs.
To begin with, the first thing we made was the Grafcet via the software FluidSIM, this
one consists of 6 Steps including the emergency stop.
By making this scheme, we ensure the correct functioning of the program that will
follow in TIA Portal:
3
GRAFCET:
4
TIA Portal programming:
Modes:
Initial conditions:
Grafcet steps:
5
Stop:
6
Activations:
Indicators:
7
HMI:
A simple programming has been made, which will inform about every essential thing to
the worker, and it will also provide a simple functioning so that it is easy to understand
even if the worker has not any further qualifications.
Thanks to the programming in TIA Portal, the company will always be able to add new
features and improvements to the program.
8
Cade_Simu:
To ensure the correct functioning of the wired scheme, we have created it in CadeSimu,
which offers us the ability to simulate the process, this way we know that everything is
correctly wired.
9
Conclusion and summary:
To summarize everything, we have created both types of control systems, and after
analyzing both results we thought that the best solution would be according to the
needs of the company.
If the company plans to add new features to the drilling, specially the ones that
need a high accuracy on the hole making or thinks of adding it to the production line, a
PLC control would be the best option, since it works in a much higher precision and it
would allow an automatic control without the need of a worker.
In spite of the advantages that the PLC control offers, we personally think that a
wired control of the drill would be enough to commit its purpose and it would halve the
price of the total cost .
In the end, its the company’s choice on whether they want a PLC or a wired
control of the drilling machine.
10
0 1 2 3 4 5 6 7 8 9
1 3 5 7
Q1
1 3 5
2 4 6 2 4 6 8
N (Control) / S.1
L (Control) / S.1
1 3 5 1 3 5
KM2 KM3
S.4 S.2 1 3 5
2 4 6 2 4 6
KM1
S.6 2 4 6
1 3 5
F1
S.2 2 4 6
U1 V1 W1 U1 V1 W1
M M
M1 M1
2 Control Scheme.6 3~ 2 Control Scheme.3 3~
PE PE
PE PE
2 Control Scheme.6 2 Control Scheme.4
1 Bornes
Fecha 15/01/2024 EPLAN Esquema de potencia =
Resp. benat BEÑAT MATEO GOÑI +
Probado Proyecto básico con estructura de designación totalmente numerada Num_bas001 Hoja
2 Control Scheme
Cambio Fecha Nombre Original Sustitución por Sustituido por Página 2/5
0 1 2 3 4 5 6 7 8 9
1 3 5 7
11 13 11 13 13 13 11
12 14 12 14 14 14 12 2 4 6 8
BK BK BK BU
W5 W2 W4 W1
ÖLFLEX® CLASSIC
100
X1
Puentes
Borne
Punto de conexión
4
1
1
W3
BK
11 12 11 12 11 12 11 12 13 14 17 18 13 14 PE U1 V1 W1
Q2
Q1
1 2 1 2 BK
General Protections.7 / PE L1 / General Protections.1
I>
3 4 3 4 GY
General Protections.7 / L3 L2 / General Protections.1
I>
5 6 5 6 BN
General Protections.7 / L2 L3 / General Protections.1
I>
7 8 7 8 BU
General Protections.7 / L1 PE / General Protections.1
I>
W1
General Protections.3
ÖLFLEX® CLASSIC 100
4X0,75
300/500V
Manguera de Conexionado
Bornes S
Fecha 15/01/2024 EPLAN Hoja de título =
Resp. benat BEÑAT MATEO GOÑI +
Probado Proyecto básico con estructura de designación totalmente numerada Num_bas001 General
Hoja Protections
Cambio Fecha Nombre Original Sustitución por Sustituido por Página 4/5
0 1 2 3 4 5 6 7 8 9
15
If S2 is pressed = MANUAL MODE
AUTO MODE
F1
2 Control Scheme.3 16 18
11
11 KM1
S.6
S1 12
12
13 13 11 13 13 13 13 17 13 13 13 11
S3 KM3 S2 KM4 S4 KM2 S5 KT1 KM1 KM1 KM2 KM2
14 S.2 14 12 S.3 14 14 S.4 14 14 S.8 18 S.6 14 S.6 14 S.4 14 S.4 12
11
KM3
S.2 12
17 11 11 13
A1 x1 A1 A1 A1 x1 x1 A1 x1
KM3 H1 KM4 KM2 KM1 H2 H3 KT1 H4
A2 x2 A2 A2 A2 x2 x2 A2 x2
1 2 13 14 S.4 1 2 1 2 17 18 S.6
3 4 3 4 3 4
5 6 2 Control Scheme.4 5 6 2 Control Scheme.3 5 6 2 Control Scheme.6 17 18 S.2
General Protections
Fecha 15/01/2024 EPLAN Esquema de mando =
Resp. benat BEÑAT MATEO GOÑI +
Probado Proyecto básico con estructura de designación totalmente numerada Num_bas001 Hoja S
Cambio Fecha Nombre Original Sustitución por Sustituido por Página 5/5
(IC)
(Auto) S3 * S2 (Manual) S3 * S2
1 Set KM3, KM2 and H3 OFF 2 Set KM3, H1 (Green) ON and H3 OFF
(Lower Head) S4
1.a.6 / 4L1
/ 5L1
1.a.6 / 4N
1.a.7 / 5NN
R2
/ 2TT
x1 x2
x1
-V1 R1
24VDC/ 5A
x2
RB1
x2 x1
PT100
x1 x2
RB2
x2 x1
+24Vcc
x1 x1
R3 R4
x2 x2
0Vss
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
-K1
SIE.6ES7214-IBG40
L1 N FE L+ M 1M DI a.0 DI a.1 DI a.2 DI a.3 DI a.4 DI a.5 DI a.6 DI a.7 DI b.0 DI b.1 DI b.2 DI b.3 DI b.4 DI b.5 2M AI 0 AI 1
-X10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -X11 1 2 3
IWX+2
IX+1.0
IX+1.1
IX+1.2
IX+1.3
IX+1.4
IX+1.5
IWX
IX.0
IX.1
IX.2
IX.3
IX.4
IX.5
IX.6
IX.7
AC ~ -
+
- -
+
N(-) N(-)
_ _
~ ~
L(+) L(+)
QX+1.0
QX+1.1
QX.0
QX.1
QX.2
QX.3
QX.4
QX.5
QX.6
QX.7
-X12 1 2 3 4 5 6 7 8 9 10 11 12
1L DQ a.0 DQ a.1 DQ a.2 DQ a.3 DQ a.4 2L DQ a.5 DQ a.6 DQ a.7 DQ b.0 DQ b.1
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
1.c
Fecha 08/10/2023 EPLAN CIP ESTELLA Hoja de título = CA1
Resp. benat + EAA
Probado Proyecto básico con estructura de designación según los estándares IEC: Estructura de página con designación de función y designación de localización IEC_bas001 Hoja 2
Cambio Fecha Nombre Original Sustitución por Sustituido por Página 5/5
Used materials (DIRECT COSTS) Used materials (DIRECT COSTS)
Quantity Material Unitary price Total price Quantity Material Unitary price Total price
1 HMI 667,90€ 667,90€ 2 Buttons 8,69€ 17,38€
1 PLC 751,00€ 751,00€ 1 Emergency stop 22,68€ 22,68€
1 50 m PROFINET wire spool 26,49€ 26,49€ 1 Wires 26,49€ 26,49€
1 Magneto 49,99€ 49,99€ 1 Magneto 49,99€ 49,99€
1 Relays 84,95€ 84,95€ 1 Relays 84,95€ 84,95€
1 Fuses 216,15€ 216,15€ 1 Fuses 216,15€ 216,15€
3 Contactors 29,92€ 89,76€ 5 Contactors 29,92€ 149,60€
1 Motor axis 181,99€ 181,99€ 1 Motor axis 181,99€ 181,99€
1 Motor updown 88,00€ 88,00€ 1 Motor updown 88,00€ 88,00€
TOTAL 2.156,23€ 1 Lights 11,99€ 11,99€
TOTAL 837,23€
MEB (Material execution budget) 2.650,13€ MEB (Material execution budget) 1.136,43€
CEB (Contract execution budget) 3.880,055 € CEB (Contract execution budget) 1.663,847 €
VAT = 21,00%
Specification sheet:
General conditions:
When it comes to the laws and regulations for this project, we will have to bear in mind
the 3 most important standards:
ISO 12100:2010 - Security in machines: Ensuring the correct work of them and
safety procedures
Equipment:
In the following page a detailed description of the materials and a budget of the
project will be shown:
11