You are on page 1of 2

harga material xxx keuntungan upah tenaga material bantu alat akomodasi over head testcom

250,000.00 17,500.00 5,000.00 62,500.00 45,000.00 12,500.00 12,500.00 30,000.00 12,500.00


instalasi equipment instalasi equipment

435,000.00 391,500.00 482,850.00 371,925.00

5,655,000.00

485,550.00 877,050.00

You might also like