5S+S Checklist
5S+S Checklist
5 S + S Audit Checklist
Perfect with continuous
Inspection Points Acceptable On going progress visible Unacceptable
Steps Sr. NO improvement
Personal safety equipment list availability and implementation Evidence of PPE usage Some evidence of PPE available
PPEs not clear, not available and not
1 (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, clarty, is available and is but not being used always and not
used
Gloves etc). used clear of PPEs to be used
Fire extinguishers, emergency showers, eye wash bottles and Partial compliance(eye wash
Complete compliance to bottles not completely filled,
3 stations where required are present, marked, accessible and requirements checklist s not updated, areas not
No evidence of the controls
checklists are updated (where applicable). marked)
Guarding / safety devices or procedures/alarm system/fire hydrand All samples meeting the Evidence of one or more such samples
5 Partial compliance
are in place and effectively used. requirement not meeting the requirement
SAFETY
First aid boxes are
availablein good condition First aid boxes available but either
6 First aid boxes are available, adequately filled and in good condition. and are adequately fille asper not filled or not in good condition
First aidboxes not available
the displayed list
Walkways and emergency exits are free, evacuation routes posted Full compliance to Blocked and no signages posted and
7
and understood. requirements low awareness
Chemicals are correctly labelled, SOP for handling chemicals, MSDS is Full compliance to Evidence of one or more such samples
8 Partial compliance
displayed. Lockout-Tagout procedures are followed. requirements not meeting the requirement
Safe work practice (such as using hand rails, safety belts, safe All samples evidenced shows
10 material and equipment handling, using knives towards the body) are full complaince to safe Partial compliance Evidence of unsafe work practice
in place. working behaviour
(1S) SORT
Evidence that all storage No attempt to remove unwanted
places are necessary and Partial compliance storage areas and/or blank storage
All storage areas, racks, shelves, cupboards, WIP loations are being used effectively spaces available but not used
12 necessary and are in use.
Red tag are is defined, and
Red tag area defined but either not
used effectively based on
used or materials remain in the
internally agreed procedure No red tag area defined
red tag area for an unreasonable
Red Tag area is identified and in use (frequency / time for doing Red (frequency, responsibility,
amount of time
disposal)
13 Tag Activity is clear and is followed).
All samples evidenced are in Not at all done, In repeat audits found
Partial compliance
Each object/ tool/ material are kept on their marked position compliance no attempt to be made to do it.
19 (practice / behaviour). Yellow line and layout is respected
painted equipment
work stations(Area around the machine, behind the machines)is kept no paint
21 clean and free of oil, grease, dust and debris
All areas Free of dust and
All areas shining, clean and Not at all done, In repeat audits found
All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are clean but with old/ Partial compliance
painted no attempt to be made to do it.
22 free of dust, dirt and kept clean. incomplete paint or no paint
Evidence of action taken from previous 5S audit observations. Display and Evidence of internal
Actions taken as per the plan There is a plan with target date No evidence of action taken to improve
brain storming within team and
Rootcauses are eliminated and improvement actions include using 5S to reduce 7 waste
are evidenced and displayed and responsibility 5S audit observations
33 prevention
Date: Responsible:
Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), cables
2 are above the ground, not tied together, live ends not exposed or taped, adequately
lighted.
Fire extinguishers, emergency showers, eye wash bottles and stations where
3 required are present, marked, accessible and checklists are updated (where
applicable).
Guarding / safety devices or procedures / alarm system / fire hydrand are in place
SAFETY
5
and effectively used.
6 First aid boxes are available, adequately filled and in good condition.
7 Walkways and emergency exits are free, evacuation routes posted and understood.
Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed.
8
Lockout-Tagout procedures are followed.
Toolbox talks is conducted, improvement points generated and effective actions are
9
taken.
Safe work practice (such as using hand rails, safety belts, safe material and
10
equipment handling, using knives towards the body) are in place.
Make the environment safe - SUBTOTAL 0
All machinery, handling equipment, tools, materials, gages and instrument are
necessary and in use.
11
SORT
All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in
use.
12
Red Tag area is identified and in use (frequency / time for doing Red Tag activity is
clear and is followed).
Remove non-value added items - SUBTOTAL 0
All movable equipment, materials, parts and its location is marked / labelled.
14
Layout of the area is available which shows the location of each item in the area.
SET IN ORDER
15
Interior area of all cupboards and storage locations marked and labelled including
contents
16
Tools (in case of office its stationary) have shadow boards / point of use.
18
Each object / tool / material are kept on their marked position (practice / behaviour).
Yellow line and layout is respected.
19
Organize, label, assign locations - SUBTOTAL 0
Date: Responsible:
All floors & ceiling are free from dust, dirt, debris, inks, oil, parts, hardware,
packaging material, walls, windows, ducts, stripcurtains, overhead lamps and
20 fixtures etc are clean.
Equipment (including material handling equipment and tools) and work stations
(area around the machine, behind the machines) is kept clean and free of oil,
21 grease, dust and debris.
SHINE
All storage area (cupboards, cabinets, WIP storage -racks, pallets) are free of dust,
dirt and kept clean.
22
Evidence that when cleaning is taking place, the cleaner is looking for abnormalities.
24
Clean & healthy work ambience - SUBTOTAL 0
The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with
observation) and action plans are displayed.
28
Percentage 0%
5S level 0.0
xx.yy.2014
Steps Sr. NO Inspection Points 1. Audit
1 Personal safety equipment list availability and
2 implementation (Hearing, Safety
Hazard conditions-pallets, debris,Glasses,
or sharpFace
3 Shields,Safety
objects,
Fire extinguishers, Shoes,Proper
trips, spills emergency Uniform,
CablesGloves
(water / oil),showers, are
eye above
4 etc).
the
wash ground,
Panelsbottles not tied
and stations
and cabinets together, live
whereand
are closed ends
requirednot
locked.are
SAFETY
5 exposed
present, or taped,
marked, adequately
accessible
Guarding / safety devices or procedures/alarmandlighted.
checklists are
6 updated
system/fire (where
First aid boxes hydrandapplicable).
are in place
are available, and effectively
adequately filled and
7 used.
in good condition.
Walkways and emergency exits are free,
8 evacuation are
Chemicals routes postedlabelled,
correctly and understood.
SOP for
9 handling
Toolbox talks is conducted, improvementLockout-
chemicals, MSDS is displayed. points
10 Tagout
generated
Safe
All procedures
and
work practice
machinery, effective
handling are followed.
actions
(suchequipment, are
as using hand taken.
rails,
tools,
safety belts,
materials, safeSumme
gages material
and and equipment
instrument are necessary
11 handling,
and in use
All storage
Red Tag using isknives
areas,
area racks,
identified towards
and inthe
shelves, body)
cupboards,
use are in
(frequency WIP/
SORT
place.
(1S)
16 locations marked
Corridors and walkwaysand labelled including contents
are demarcated and
17 marked
Tools
Each (object/
in casetool/of office
material its stationary)
are kept onhave their
18 shadow
marked boards
All floorsposition
& Ceiling/ point
(practice of use.
are free/ behaviour).
from dust, dirt, Yellow line
debris,
19 and layout
Equipment is
inks, oil, parts, respected
hardware,
(including packaging
material handling material,
equipment
walls, windows, ducts,
Summe stripcurtains,
and tools) and work stations(Area around the overhead
20 lamps
machine, andbehind
All storage fixtures theetcmachines)is
are clean. kept clean
area (Cupboards,cabinets, WIP and
(3S) SHINE
26 Standard
The graphwork
maintained is audit
of& the defined
displayed &with andradar
5S visually
standard managed
and actual
is updated.
(4S)
Audit
28 and action plans are displayed
29 Post photographs
Evidence of sustainingof theand "perfect"
incrementalsetup
improvement in Summe
audit score 'safety', 'sort', set-in-
30 All associates
order', 'shine', are aware on(Average
'standardize' 5S+S. scoring for
SUSTAIN
31 four consecutive
Evidence audits)
Group canofdemonstrate
action takenretreival of needed
from previous items
5S audit
(5S)
32 in 30 seconds
observations. Rootcauses are eliminated and
33 improvement actions include prevention
Summe
Total 0
Maximum Score 240
Percentage 0%
Target 40%
5S level 0.0
xx.yy.2014 xx.yy.2014 xx.yy.2014 xx.yy.2014 xx.yy.2014
2. Audit 3. Audit 4. Audit 5. Audit 6. Audit
0 0 0 0 0
240 240 240 240 240
0% 0% 0% 0% 0%
60% 80% 90% 90% 90%
0.0 0.0 0.0 0.0 0.0
100%
Result Target
90%
90% 90% 90%
80%
80%
70%
60%
60%
50%
40%
40%
30%
20%
10%
0% 0% 0% 0% 0% 0%
0%