Inspection & Test Plan

The inspection and test plan identifies and records details of valves being tested, including part numbers and tag numbers. It outlines tests to be performed, including a shell hydro test, hydrostatic closure test, functional test, and draining, drying, and preserving valves. The document provides acceptance criteria and lists work order and report numbers for an inspection being conducted by Sigma Engineering Works for customer McDermott and company ADMA OPCO.

Uploaded by

Melissa Murray
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Inspection & Test Plan

The inspection and test plan identifies and records details of valves being tested, including part numbers and tag numbers. It outlines tests to be performed, including a shell hydro test, hydrostatic closure test, functional test, and draining, drying, and preserving valves. The document provides acceptance criteria and lists work order and report numbers for an inspection being conducted by Sigma Engineering Works for customer McDermott and company ADMA OPCO.

Uploaded by

Melissa Murray
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SigmaEngineeringWorksCo.

LLC INSPECTION&TESTPLAN
Customer:McDermott Company:ADMAOPCO
[Link] 10 ProcessDescription ISSUEVALVETOASSEMBLYFORTESTING IDENTIFYANDRECORDANDOTHERDETAILS REQUIREDFORFUTURETRACEABILITYPURPOSES. (SIGMAGRRno.,MDRMTNno.,[Link] applicable) PERFORMSHELLHYDROTEST(waterqualityasper SP1021) PERFORMHYDROSTATICCLOSURETEST (BothSidesofbidirectionalvalves) Austeniticandduplexstainlesssteelvalvesand valvesmadeof9%Nickelandalloyshallbeflushed withdistilledwaterimmediatelyafterthehydro test. FUNCTIONALTEST DRAIN&DRYINGOFVALVES PACKING&PRESERVATIONOFVALVES ControlProcedure Acceptance Criteria

ReportNo. WorkOrderNo Date

ITP15493401 154934 [Link].2011

Sigma H

MDR R

ADMATPA R

20

30 40

D5927W004506 D5927W004506

API598 API598

H H

W W

R/W R/W

50

60 70 80

D5927W004506 D5927W004506 D5927W004507

API598 API598 API598

H H H

W W R

R/W R R

INTERVENTIONCODES HOLD H REVIEW R WITNESS W RANDOMWITNESS R/W