1000 Drainage
1100 Pipes and Accessories
1101 Check for damage, corrosion (external) and fastening T x
1102 Check encrustation (on the free flow) x
1103 Check for leaks (visual inspection) T x
1104 Check insulation for damage T x
1105 Check switchgear and drives for function (follow manufacturer's instructions) x
1200 Processes
1201 Check for damage and corrosion (external) x
1202 Check for contamination x
1203 Clean to maintain function x
1204 Check for leaks (visual inspection) x
1205 Check water level x
Page 1 of 2
410 Sanitation Equipment
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
1502 Clean to maintain function x
1503 Container inside and check for corrosion x
1504 Check function T x
1505 Check for leaks T x
1506 Pump see No. 1400
1507 Drive elements and MSR technology see catalog KGr. 499
1600 Interceptor
1601 Check for damage and corrosion (external) T x
1602 Check for contamination T x
1603 Clean to maintain function without waste x
1604 Functioning assessed T x
1605 Check for leaks (visual inspection) T x
1606 Pump, see 1400
1607 Drive elements and MSR technology see catalog KGr. 499
Page 2 of 2
410 Sanitation Equipment
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
Page 1 of 3
410 Sanitation Equipment
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
x
2405 Check manometer and thermometers for damage, display and function T
2406 Check pressure regulator for function x
2407 Adjust pressure regulator x
2408 Check operation of safety group x
2409 Discharge assembly Check function x
2410 Pump see No. 1400 ff
2411 Drive elements and MSR technology see Nr.8000 ff
2412 Perform water analysis in suitable laboratory and document x x
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
2601 Check for damage and corrosion (external) T x
2602 Check function T x
2603 Check for leaks T x
2700 Filter
2701 Check for damage and corrosion (external) T x
2702 Check for contamination T x
2703 Check function T x
2704 Change filter insert and backwashing T x
2705 Check for leaks T x
Page 3 of 3
410 Sanitation Equipment
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
3000 Furnishings
3100 Water, showers, baths and bidets
3101 Check for dirt and damage T x
3102 Check the attachment and tightness T x
3103 Check drain and overflow for corrosion (external) and function T x
3104 Clean drain and overflow function preserving T x x
3200 Fittings
3201 Check for dirt, damage and corrosion (external) T x
3202 Check the attachment T x
3203 Check function T x
3204 Check for leaks T x
3205 Check operation of thermostat T x
Check valve including control electronics and electromechanical control
3206 x
device for function
3207 Check aerators and shower heads for dirt and damage x x
3208 Clean to maintain function T x
3400 Cisterns T
3401 Check for dirt and damage T x
3402 Check the attachment T x
3403 Check for leaks T x
3404 Check function T x
Page 1 of 3
410 Sanitation Equipment
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
3405 Clean to maintain function T x
3406 Check shutoff valve for function and leaks T x
3500 Flusher
3501 Check for dirt, damage and corrosion (external) T x
3502 Check the attachment T x
3503 Check for leaks T x
3504 Check function T x
3505 Clean to maintain function T x
Page 2 of 3
410 Sanitation Equipment
every 2 years
every 5 years
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
3709 Check soap dispenser on function and damage T x
Page 3 of 3
420 Heat supply systems
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
every 2
every 5
Performance
years
years
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
4200 Silencer
4201 Check for dirt, damage and corrosion T x
4202 Check for leaks x
4203 Caulk x
Page 1 of 2
420 Heat supply systems
(as required)
if necessary
Operator
quarterly
biannual
annually
monthly
every 2
every 5
Performance
years
years
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
4500 Exhaust fan
4501 Check for dirt, damage, corrosion and mounting T x
4502 Check impeller for imbalance x
4503 Check bearings for noise x
4504 Lubricate bearings x
4505 Check function of glands x
4506 Adjust glands x
4507 Check flexible connections for leaks x
4508 Check function of vibration damper x
4509 Check guard function x
4510 drive elements see No. 7000 ff
4511 Clean x
Page 2 of 2
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
Functional measures
1102 Check impeller for imbalance x
1103 Check blade adjustment for function x
1104 Check bearing for noise x
1105 Lubricate bearing x
1106 Check flexible connections for tightness x
1107 Check vibration damper for function x
1108 Check safety devices for function x
1109 Check twist adjusting device for function x
1110 Check drainage for function x
1111 Drive elements (see No. 7000 ff)
1112 Cleaning x
Page 1 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
51 Check heat exchanger for soiling, damage and corrosion, if and when required x
clean and repair
52 Check wet cooler, condensation pan and droplet separator for soiling, x
corrosion and function, and repair, if and when required
53 Check syphon for function, and repair, if and when required x
54 Clean wet cooler, droplet separator and condensation pan x
55 Check of hygiene condition x
Functional measures
Heat recovery
2100 Air heater (air / fluid)
2101 Check for air-sided soiling, damage and corrosion, T x
2102 Check flow and return line for function x
2103 Clean air side x
2104 Ventilate x
Page 2 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
2302 Check flow and return line for function x
2303 Ventilate x
2304 Check water outlet and odour trap for function x
2305 Droplet separator (see No. 4200 ff.)
2306 Clean air side x
Page 3 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
2701 Check for air-sided soiling, damage and corrosion, T x
2702 Check flow and return line for function x
2703 Clean air side x
2704 Ventilate x
31 Check air filter for permissible soiling and damage (leakage); replace the air x
filter concerned, if and when required if the last replacement of the filter stage
is no longer than six months ago, otherwise replace the entire filter stage
32 Check the differential pressure; replace the filter stage, if and when necessary x
331 at the latest filter change of 1st stage in case of non-renewable air filter, x
otherwise thorough cleaning
332 at the latest filter change of 2nd stage see above x
34 Check of hygiene condition x
Functional measures
3100 Automatic roll filter
3101 Check for soiling, damage and corrosion, x
3102 Measure pressure difference x
3103 Check filter forward feed for function x
3104 M&C systems (see catalogue of services Cost group 499)
Page 4 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
3105 Top up measuring liquid x
3106 Check filter medium for reserve x
3107 Replace filter belt T/x
3108 Drive elements (see No. 7000 ff.)
3109 Cleaning T/x
Page 5 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
3308 Check the cleaning device for function x
3309 M&C safety systems (see catalogue of services Cost group 499)
3310 Drive elements (see No. 7000 ff.)
3311 Cleaning x
Page 6 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
Functional measures
5201 Check for soiling, damage, corrosion, fastening and setting T x
5202 Resetting x
5203 Cleaning x
Page 7 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
5400 Flaps
5401 Check for soiling, damage and corrosion T x
5402 Check for mechanical function T x
5403 Lubricate bearings and rods x
5404 Cleaning x
22 Check the said for water formation; clean if and when required, determine x
cause
Page 8 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
83 Check silencer for soiling, damage and corrosion; and repair, if and when x
required
84 Check the hygiene condition in the air pipe at a representative spot; determine x
cause, if and when required, and clean corresponding air pipe sections
Functional measures
5501 Check for soiling, damage and corrosion T x
5502 Check outlets for function T x
5503 Check doors and locks for operability and tightness T x
5504 Lubricate moving parts x
5505 Check insulation for external damage (visual inspection) T x
5506 Check flexible connections for tightness T x
5507 Cleaning T/x
Page 9 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
5602 Check volumetric flow controller for function x
5603 Check regulating throttle for function x
5604 Cleaning T/x
Page 10 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
7103 Check bearing for noise x
7104 Lubricate bearing x
7105 Check safety devices for function x
7106 Check repair switch for function x
7107 Measure motor current and adjust protective device x
7108 Cleaning x
Page 11 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
8106 Drive elements (see No. 7000 ff.)
Page 12 of 13
430 Ventilation systems and mechanical smoke extraction
when required
Key
every month
twice a year
every three
performance Inspection and maintenance work Actuation Result Remark
annually
indicator
months
The pos. marked with a T shall be carried out by the technical staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
representation. OK NG OK NG
8408 Check thermal transfer medium of circulatory systems for frost protection x
Page 13 of 13
434 Refrigeration systems and air conditioning systems
(as required)
if necessary
quarterly
biannual
annually
monthly
every 2
every 5
Performance
years
years
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
Page 1 of 1
434 Refrigeration systems and air conditioning systems
(as required)
if necessary
quarterly
biannual
annually
monthly
every 2
every 5
Performance
years
years
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
Condenser
8210 Clean to maintain function x
Page 1 of 1
434 Refrigeration systems and air conditioning systems
every 2 years
every 5 years
(as required)
if necessary
quarterly
biannual
annually
monthly
Performance
Identification Inspection and Maintenance Actuation Result Remark
digit
The items marked with T are executed by the Technical Staff of the
12 4 2 1 1 0 1 OK NG OK NG
representation.
8300 Pipeline
8301 Check for corrosion x
8302 Check insulation for damage x
8303 Check leading refrigerant system components for leaks x
8304 Replace the filter drier x
8305 Check the moisture indicator for discoloration x
8306 Check liquid level in receiver x
Page 1 of 1
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
1, hygiene inspection
Must be carried out by trained, qualified
personnel in accordance with VDI 6022 page 2
4.1.2 Check pressure difference Replace the filter stage when the maximal X
pressure differential is exceeded.
Page 1 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
5,1 vaporising and recirculating spray The supplied water must at least meet drinking
humidifiers water standards and must not exceed a total
hardness of 7° dH.
5.1.3 Check vaporiser nozzles for deposits Clean nozzles, replace if needed X
5.1.4 Check state and function of dirt trap Clean and repair X
5.1.5 Check for flake formation in bottom region of Clean pan X
air humidifier pan
5.1.6 Check recirculating pump for dirt and film Clean pump circuit X
build-up in the intake line
5.1.7 Check function of blow-down device Readjust blow-down device X
5.1.8 Check function of conductivity cell Repair X
5.1.9 Check function of disinfection system Repair X
5.1.10 Check function of water supply and X
distribution
5.1.11 Check water level X
5.1.12 Readjust water level in regulating unit X
5.1.13 Check function of drain and overflow X
5,2 Steam humidifiers with and without Must be operated so that no conden- sate can
integrated steam generators enter the air duct system. The vapour cannot
contain any harmful substances.
5.2.1 Check for contamination, damage and Clean and repair, if necessary disinfect X
corrosion
5.2.2 Check for condensate precipitation in Determine causes and correct, clean steam X (during
humidifier chamber humidifier operation)
Page 2 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
5.2.4 Check state and function of dirt trap Clean and repair X
5.2.5 Check steam distributing pipe for deposits Clean X
5.3.1 Check for contamination, incrustation, Clean and repair, if necessary disinfect X
damage, and corrosion
5.3.2 Clean water receptacle X
5.3.3 Check function of electrical system X
5.3.4 Check function of energy converters (only in X
ultrasonic humidifiers) and replace as needed
5.3.8 Check for contamination, damage and film Function maintenance cleaning, all surfaces X
build-up including trays, may require disassembly of
droplet eliminator
5.3.9 Check droplet eliminator for film build-up Function maintenance cleaning when there is X
visible encrustation
5.3.10 Check function of drain and odour trap X
6, heat exchanger, general
6,1 If the cleaning in the installed position is
insufficient, then the heat exchanger must be
removed and suitably cleaned
6.1.1 Check for contamination, damage and Clean and repair
corrosion
X
6.1.2 Check evaporative cooling unit, con- densate Repair X
pan and droplet eliminator for contamination,
corrosion and function
6.1.3 Check function of siphon Repair X
6.1.4 Inspection of hygiene state X
6,2 air heater
6.2.1 Check for contamination, damage and X
corrosion on the clean air side
6.2.2 Clean function maintenance (clean air side) X
6.2.4 Ventilate X
6,3 electric air heater
6.3.1 Check for scale encrustation and corrosion X
Page 4 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
6,4 Air cooling unit (air/fluid) dehumidifier The siphon with the reverse flow prevention
vaporiser (air/coolant) mechanism must be sized and positioned in
accordance with the pressure conditions so as to
permit unhindered flow of condensa- te water
Page 5 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
7.3.5 Grease bearings with regreasing device Only in bearings with a relubrication device X
7.3.6 Check function of sealing element The brush seals on the thermal mass are X
positioned at the factory
7.3.7 Seals With normal-temperature rotors, sealing felts of X
the quality NF-PES-LE
0.32 grey are used. The felts must be slid as
close as possible to the thermal mass, but
prevented from
producing direct abrasion.
7.3.8 Check hygiene state X
7.3.9 Check drive elements X
7,4 Cross flow heat exchanger
7.4.1 Check for contamination, damage and Clean as needed X
corrosion on clean air side
Page 6 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
Page 7 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
12.2.2 Clean function maintenance Capacity range must be defined and agreed upon X
12.2.3 Check tension and alignment readjust as needed X
Page 8 of 9
AHU - hygiene requirements and maintenance, service of air conditioning equipment according to vdi 6022 and vdMa 24186
Performance 1 3 6 12 24
Identification month months months months months Actuation Result Remark
digit Inspection and Maintenance Inspection and recommended maintenance intervals
OK NG OK NG
8. emergency
In case of fire, the dampers must be closed and power to the unit must be disconnected by means of the master switch. Rooms should be closed
in order to minimise the air supply. Alert the fire brigade.
Warning:
In order to protect from the possible release of toxic substances, the rooms must only be entered when wearing respi- rator masks.
9. help in the event of malfunctions
Warning!
Diagnosis, troubleshooting and re-commissioning may only be performed by authorised persons. That applies particularly to work on
electrical equipment within the control cabinet (e.g. testing work, replacement etc.)!
Page 9 of 9
442 Internal power supply systems
Hệ thống cấp điện trong nhà
if necessary
Performance
required)
quarterly
biannual
annually
monthly
Inspection and Maintenance Actuation Result Remark
every 2
every 5
Identification
years
years
digit
(as
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
3001 Check doors, door locks, room- and security lighting for function T x
3003 Check block diagram, safety, fire-fighting system for the presence T x
4202 Check circuit breakers, contactors and relays to lock and damage (eg contact wear) x
4204 Check data transmission equipment (such as modems, direct current data transmission devices, x
Multiplexers, bus system)
4205 Clean x
Page 1 of 2
442 Internal power supply systems
Hệ thống cấp điện trong nhà
if necessary
Performance
required)
quarterly
biannual
annually
monthly
Inspection and Maintenance Actuation Result Remark
every 2
every 5
Identification
years
years
digit
(as
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
4302 Clean x
4502 Examination of the lightning protection system (THM only visual inspection) T x
Page 2 of 2
443/444 Low-voltage switchgear and installation systems
Performance Inspection and Maintenance
if necessary
Identification
required)
quarterly
biannual
annually
monthly
Actuation Result Remark
every 2
every 5
digit
years
years
(as
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
1000 Switchgear
1007 Check switchgear and drives, measurement and protection devices for function; Check protective x
earth and bonding (VDE 0100, part 540), Check connections position and retighten if necessary
1010 Functional testing of the fault signal tableau with simulation of NN change on NEA T x
3007 Check measurement and protection devices, check the functionality, including the gathering of x
results and documentation
3008 Check ports and connections for seat and retighten if necessary x
Page 1 of 2
443/444 Low-voltage switchgear and installation systems
Performance Inspection and Maintenance
if necessary
Identification
required)
quarterly
biannual
annually
monthly
Actuation Result Remark
every 2
every 5
digit
years
years
(as
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
Page 2 of 2
443/444 Low-voltage switchgear and installation systems
Performance Inspection and Maintenance
if necessary
Identification
required)
quarterly
biannual
annually
monthly
Actuation Result Remark
every 2
every 5
digit
years
years
(as
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
4401 Check for dirt, damage, corrosion, fixing and water intrusion, replace bulbs if necessary T x
4403 Clean T x
Page 1 of 1
446 Lightning Protection
every 2 years
every 5 years
(as required)
if necessary
Performance
quarterly
biannual
annually
Actuation Result
monthly
Identification Inspection and Maintenance Remark
digit
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
1003 Check ports and connections for tightness and tighten if necessary T x
Page 1 of 1
452 Search and signaling systems
Inspection and Maintenance
if necessary
Performance
required)
quarterly
biannual
annually
monthly
Actuation Result Remark
every 2
every 5
Identification
years
years
digit
(as
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
1001 Check switching and display elements for contamination, damage, corrosion and environmental T x
conditions
1002 Check functionality of the trigger and display elements in the toilet's T x
1005 Check display module for function and display and control of releases from the toilets T x
1006 Functional testing of voice communication from the toilets to the gate T x
1007 Check functional testing of voice communication from the toilets with call forwarding T x
Page 1 of 1
454 Fire Alarm System (FA)
every 2 years
every 5 years
(as required)
if necessary
Performance
quarterly
biannual
annually
Actuation Result
monthly
Identification Inspection and Maintenance Remark
digit
The items marked with T are executed by the Technical Staff of the representation. 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
1001 EAS Office for contamination, damage, corrosion and environmental conditions and clean if necessary T x
1002 Check Battery, damage, corrosion and environmental conditions, and clean if necessary, replace the x
batteries if it falls below the capacity by 10%
Page 1 of 1
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
1200 Controllers
1201 Check for times and functionally correct installation and ambient conditions x
Page 1 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
1206 Check functional elements (wv) adjust, adjust, tighten x
1207 Check input signals (eg sensors, remote dial, reference variable) for x
correspondence with setpoints
1208 Match Signals x
1209 Check control function, control signal and safety chains x
1210 Adjust control function and control signal x
Page 2 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
2300 Vessel monitoring systems
2301 Check for times and functionally correct installation and ambient conditions x
2302 Clean x T
2303 Level indicator Check function x
2304 Leak Alert System Check function x
2305 Check operation of limit switches x
Page 3 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
3113 Check Control-/Module-/Optimize-Operation by setting parameters, taking x
into account all auxiliary functions
3114 Correct/readjust Control-/Module-/Optimize-Operation respecting setting x
parameters, taking into account all auxiliary functions
Page 4 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
4207 Lubricate spindle x
4208 Check function x
4209 Readjust x
5200 External memory (mass data storage devices such as cassette disk
Floppy drives, tape drives, CD-ROM burner, etc.)
5201 Check for times and functionally correct installation and ambient conditions x
Page 5 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
5204 Internal power supply check x
5205 Check ventilation x
5206 Check air filter x
5207 Clean or replace air filters x
5208 Check connection joints for electrical / mechanical function, re-tighten if x
necessary
5209 Clean in accordance with manufacturer's specification x
5210 Check and correct alignment of the drive system and the read and write x
devices
5211 Check functional elements (eg, control and display devices) x
5212 Set and adjust functional elements (eg, control and display devices) x
5213 Perform functional test using test programs x
Page 6 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
6101 Check for times and functionally correct installation and ambient conditions x
Page 7 of 8
480 Building Automation
Inspection- and Maintenance
(as required)
if necessary
Performance
quarterly
biannual
annually
monthly
Identification Actuation Result Remark
every 2
every 5
years
years
Digit
The items marked with T are executed by the Technical Staff of the 12 4,0 2,0 1,0 0,5 0,2 1,0
OK NG OK NG
representation.
6302 Check storage of U.S. programs x
6303 Check reset and boot function x
6304 Check electrical / electronic / pneumatic input signals (eg sensors, remote
dial, reference x
6305 variable)
Match Signals x
6306 Check Control-/Module-/Optimize-Operation and control signal x
6307 Adjust Control-/Module-/Optimize-Operation and control signal x
7000 Software
7100 Software for central / sub-centers / substations
7101 Perform data backup (see 6202, 7102) x
7102 Storage of the most recent program and data copies x
7103 Perform fandom like online test (see 2209, 4112, 6110, 7113) x
7104 Updating and maintenance of the system software x
7105 Test User program x
7106 Check data transmission (see 7114) x
7107 Check double or multiple computer operating (see 7156) x
7108 Import of the recently created (current) program and data copies x