You are on page 1of 1

DAIKIN ELECTRONIC DEVICES MALAYSIA SDN. BHD.

MONTH :

MONTHLY CHECKLIST
AIR HANDLING UNIT (AHU) Department : Facility
No. ITEM VISUAL M ETHOD FREQ. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 Main Power Supply board (DB) free from dust. D

2 Check MCB /DB cable - should not have burned mark. D

3 AHU surface to be free from dirt, dust and rust. D

Check all valve in good condition for a system prior


4 D
operation.

5 No water leaking around compressor area. D

7 Measure motor fan noise Level (dB) D

8 Motor abnormal noise check. D

9 Check for abnormal vibration D

10 Check for any abnormal sound during belt drived. M

11 Check on control panels working in order. M

14 Floor Cleaning W

15 5S D

Checked By Technician
Verified By Supervisor / Engineer
(R) Repair
(X) Not Good (√) Good /Checked (D) Daily (W) Weekly
(S) Service
Technician : Com m ent: Verified By :
Excecutive /HOD :
(signature)
DATE :

You might also like