You are on page 1of 1

1 2 3 4 5 6 7 8

KEY PLAN:

A A

LEGEND:
PLAN
B B
LUP
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE
3 m PROFILE

E NATURAL GROUND
SLOP
GREE DESIGN LEVEL
15 DE
ALL DIMENSIONS ARE IN METER
1 PIPE LINE
pipe line
C C
2 SOIL FILLER AREA

EXISTING SOIL LAYER AS SITE CONDITION -NEW BACKFILL SOIL LAYER =3 M ON PIPELINE 3 SLOW WARMING SIGN

4 MAN AT WORK WARMING SIGN

5 SPEED LIMIT SIGN 20 TO 70

6 CONSTRUCTION VEHICLE ONLY

7 LIGHT SUN FLOWER

8 Flag man
D D
9 PEDESTRAIN

10 NOT MORE
THEN 60 TON
WHEN LOADED
NOT MORE THEN 60 TON WHEN LOADS

CAUTION :

11 PIPELINE
UNDER ROAD CAUTION : PIPELINE UNDER ROAD

12 PERMITED
VEHICLE
ENTRY ONLY
PERMITED VEHICLE ENTRY ONLY

13 HSE INSTRUCTIONS IN EMERGENCY


HSE INSTRUC
TIONS
IN EMERGEN
CY

14 DONOT OVER TAKE

ROPE AND ROD


15
E

REV/01 ISSUED FOR APPROVAL 29/02/2024 ENG/ALAM E


ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:
FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

F
F
BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN ENG/ALAM 29/02/2024

CHECKED ENG/ALAM 29/02/2024 CHECKED


APPROVED ENG/SABEIL 29/02/2024 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
UNIVERSAL TRAFFIC MANAGEMENT PLAN
FOR PIPE LINE PAGE 2 OF 2
PROJECT NAME :
Logistic Facilities in the Connector
(CH 00+000 to CH 75+000)
CROSS SECTION WITH PIPE LINE Work Order No .1100001344/015
INITIAL SITE PREPARATION
NEOM
KINGDOM SAUDI ARABIA
H REGION ASSET CODE CONTRACT CODE H
18 606000 1100001344
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115156 01

1 2 3 4 5 6 7 8