You are on page 1of 5

Moriyama House Legends:

SANAA ARCHITECTS Green: Structrue


Blue: Envelope
TOKYO JAPAN Red:Partition
Ground floor plan-A02B Pink:Lining
System:Brown/Water:blue(Cold)+Orange(Hot))
Furniture/Equipment:Grey
Student name: Yiheng Fu (West-12096588)
Yellow:Decoration
Tutor:Mariah Drakoulis

3174 2724 2974 5625

Building B
Dining/Kitchen

Corridor

1824
Building E
Dining/Kitchen

4025
4024
2724

Building C
Veranda/Living Room

Building A
Living Room

1811

1246
Building D
Bathroom

Building G
Living Room Building J

4424
Living Room

5374
Building F
Living/Dining
5024

4424

4278
Bathroom

Building I
Living Room

2874

3774
Building H
bathroom
1364

2334 4778
Moriyama House
SANAA ARCHITECTS
TOKYO JAPAN
Other floor plans-A02B

Student name: Yiheng Fu (West-12096588)


Tutor:Mariah Drakoulis

Underground floor plan First floor plan

Legends:
Green: Structrue
Blue: Envelope
Red:Partition
Pink:Lining
System:Brown/Water:blue(Cold)+Orange(Hot))
Furniture/Equipment:Grey
Yellow:Decoration
Second floor plan
Moriyama House
SANAA ARCHITECTS
TOKYO JAPAN
Long section (Building A,B,C and E)-A02B

Student name: Yiheng Fu (West-12096588)


Tutor:Mariah Drakoulis

A
Legends:
Green: Structrue -Paint
B
Blue: Envelope -Putty G
-Poured adn pressed mortar
Red:Partition -Waterproof sheet
-Deck plate
Pink:Lining -Insulation -Floor heating plane
-Plywood
System:Brown/Water:blue(Cold)+Orange(Hot)) -Steel sheet
-Plasterboard -Wooden joists
Furniture/Equipment:Grey -Concrete
-Spring form mat
Yellow:Decoration -Discarded concrete
-Polyethelyne film
Building A -Crashed stone

Living room

Building E
A Building B
A

A Building C
7795

Bedroom
Study
Archive

5009

5013
3617
Living Room Veranda/Living room

Living Room -Plywood -Clear landex coat Kitchen


-Clear landex coat -Particle board -Poured and pressed mortar
-Poured and pressed mortar -Rasukatto
-Floor heating panel -Concrete slab -Particle board
-Waterproof plywood
-Particle board

C Bathroom -Poured and pressed mortar


Studio -Urethane foam spray
-Waterproof formwork

-Plasterboard
-Urethane foam spray
3046
-Implantation type drainage formwork
2753
2483

-Porcelain tile
-Poured and pressed mortar
-Spring form mat

B
C
-Clear landex coat
-Poured and pressed mortar
-Floor heating panel
-Rasukatto -Welded G
5651 -Plywood -Steel plate 3208
-Timber sleeper joist assembly -Insulation
-Discarded concrete
-Polyethelyne film -Gypsum board
-Crashed stone
Moriyama House
SANAA ARCHITECTS
TOKYO JAPAN
Long section (Building A,B,C and E)-A02B

Student name: Yiheng Fu (West-12096588)


Tutor:Mariah Drakoulis

Legends:
Green: Structrue
Blue: Envelope
Red:Partition
Pink:Lining
System:Brown/Water:blue(Cold)+Orange(Hot))
Furniture/Equipment:Grey
Yellow:Decoration

A
A
Study

Living Room

-Weld G Processing 5155


4764 4815
4403
-Putty bitumen paint
-Photocatalytic paint

-Urethane landex coat


-Poured and pressed mortar Dining/Kitchen
-Waterproof plywood
-Cemented aluminium resin Bathroom
composite adhesive

-Landex coat,clear
-Floor hrating panel -Poured and pressed mortar
-Plywood -Floor heating panel
-Timber sleeper joist assembly -Rasukatto
1894 2007 -Plywood
Timber sleeper joist assembly

-Clear landex coat


-Poured and pressed mortar
-Styrofoam
Crushed stone
-Concrete

Main Water Container


(All buildings water will be stored in there)

1685
1129

1858

4152
Moriyama House
SANAA ARCHITECTS
TOKYO JAPAN
Building G(Banquet Room/Living Room)--Axonometric+Construction detail drawings-A02B

Student name: Yiheng Fu (West-12096588)

Group members:

Rhys Andrew
Haoming Chen(Kevin)
Yiheng Fu(West)

Tutor: Mariah Drakoulis

LEGENDS:
S: structures
E: Envelopes
P:Partitions
L:Linings

Timber Joist
(L bracket)(S)

Timber Joist
(I bracket)(S)

Floating glass(E)
Shatterproof film paste(E)
Fan

Timber Joist
(I bracket)(S)

Timber Joist
(I bracket)(S)
1. Specified colored topcoat(E)
2.Waterproof sheet(E) A. Fan structrue(System)
3.Poured and pressed mortar(S)
4.Slab plate(S)
5.Steel sheet(S)
C 6.Plasterboard(L)

Timber Joist
(L bracket)(S)

Timber Joist Timber Joist


(I bracket)(S) (L bracket)(S)

Timber Joist
(I bracket)(S) Slab Plate(S)

B.1.Corner of the Bulding G detail B.2. Zoom-in part

1.Weld putty and rust preventative coating(E)


2.Steel plate(S)
3.Urethane spray insulation(S)
4.Gypsum board(L)

Low-E window
unit(S)
Floating glass(E)
A
Expanding foam
sealant(S)

Back dam(S)
Continous bead of sealant(S)
B Self-adhered membrane
flashing(S)

Vented lap siding(S)

Rigid insulation(S)
Wood frame(S)

Gypsum board(S)
C.Window construction detail

Cherry hardwood flooring(L)

D
Hardwood cherry flooring plywood(L)
Particle board(S)

Timber Joist
(I bracket)(S)
Dry double flooring(S)

Discarded concrete(S)

Polyethelyne film(S)

Crushed stone(S)

Lintels(S) D. Underground construction detail

You might also like