Solucion Estacion Santa Fe
Se instalaran 2 mastiles
de 3m, uno en lado Este
y otro en lado Oeste.
Calculo de Peso
1. Mastil
OC 6” ced 40
P= 28.26 kg/m Mastil 3.00 Tipo [Para lado Este y Oeste]
L= 3.00m
Mastil 85 Kg
P x L = 28.26 x 3.00 = 85 kg
Cartabones Pernos 9 Kg
V = 0.20 x 0.10 x 0.0095 = 0.00019 x 8 = 0.00152 m3 Cartabon 12 Kg
P = 7850 kg/m3
Pt = 7850 kg/m3 x 0.00152 m2 = 11.93 kg ~ 12 kg Conexiones 323 Kg
Pernos 12 Kg
2. Conexiones
Soportes para antena 70 Kg
Placa
A = 0.90 x 0.90 x 0.0254 = 0.0.021 x 2 = 0.04 m3 2 Antenas 100 Kg
P = 7850 kg/m3
Pt = 7850 kg/m3 x 0.04 m2 = 323.01 kg ~ 323 kg
Peso total + 10% tornillos 672 Kg
Pernos OS 1” = 3.97 kg/m
6 Pernos de 50 cm = 6 x 0.5m = 3.00m x 3.97 kg/m ~ 12 kg
20 Pernos de 20cm = 20 x 0.20m = 4.00m x 2.235 kg/m ~ 9 kg