You are on page 1of 1

CẤU TRÚC BẢN VẼ CỦA SUCTION BUCKET

A1 B2 C2
AS-0001 TỚI AS-0034 AS-0035 TỚI AS-0068 AS-0069 TỚI AS-0102
BẢN VẼ TRÊN PMS BẢN VẼ TRÊN PMS BẢN VẼ TRÊN PMS
AS-0103 TỚI AS-0105 AS-0106 TỚI AS-0108 AS-0109 TỚI AS-0111

Grouting System CHW2204-XXX-E-V10UMD90&CTB620-AS-0003


Làm MT 100%
(C125) CHW2204-XXX-E-V10UMD90&CTB620-AS-0004

Anode CHW2204-XXX-E-V10UMD90 &CTB240-AS-0001 Làm UT/MT 100%

CHW2204-XXX-E-V10UMD90 &CTB215-AS-0001 (A1)


Chọn 1 mối P là 100% MT
Flooding pipe CHW2204-XXX-E-V10UMD90 &CTB215-AS-0005 (B2)
Chọn 3 mối PL làm 100% UT, 100% MT
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0009 (C2)
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0002 (A1)
BẢN VẼ NGOÀI CHW2204-XXX-E-V10UMD90 &CTB215-AS-0003 (A1)
(SECONDARY Minigation inlet CHW2204-XXX-E-V10UMD90 &CTB215-AS-0006 (B2) Mối P.1.1 làm 100% MT
STEEL) (OD224) CHW2204-XXX-E-V10UMD90 &CTB215-AS-0007 (B2) Mối P.1.2 làm 100% UT, 100% MT
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0010 (C2)
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0011 (C2)
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0013 (A1)
Làm UT Lam check bề mặt tôn cơ bản
Anchor point CHW2204-XXX-E-V10UMD90 &CTB215-AS-0014 (B2)
Làm 100% MT sau khi hàn xong.
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0015 (C2)
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0004 (A1)
Suction Pump CHW2204-XXX-E-V10UMD90 &CTB215-AS-0008 (B2) Vật tư chưa cấp -> không làm
CHW2204-XXX-E-V10UMD90 &CTB215-AS-0012 (C2)
Ghi chú: XXX là tên facility, ví dụ: G06, H02, H05….

Biên soạn bởi: Hồ Văn Thức