Connected Load per phase
Total Connected Loads A, B, C =
Continous loads X 0.25 = Per NEC 215.2(A)
Largest motor load X 0.25 = Per NEC 220.14 ©, 430.22, 430.24
Total Demand Load = WATTS
Total Demand Amps= AMPS