ESCALATION CHART
Sr. No FROM Dealer MOBILE NO EMAIL ID
(Reliance Projects and Property) (LG Electronics (I) Pvt Ltd) (Shree SVS Systems)
Management Services
MULTI VRV PRE-START UP COMMISSIONING & HAND OVER REPORT
PROJECT CODE MULTI V-5 SYSTEM NO. 28 HP
LG ELECTRONICS INDIA PVT. LTD.
12th to 20th Floor Tower 1, KP tower, Plot No. C-001B, Sector 16B, Noida, Uttar Pradesh 201301
NAME COMPANY NAME & ADDRESS CONTACT DETAILS
Reliance Projects & Property Management Services Ltd
CUSTOMER DETAIL
PERSON IN CHARGE
POWER OK
WIRING TRANSMISSION OK
CENTRAL CONTROLLER OK AC EZ
PIPE SIZE @ HEADER SUCTION 34.9 LIQUID 15.88 MM HARD DRAWN
LEAKAGE TEST @ 550 PSIG MIN 24 HRS
VACUUMING 490 MICRONS 300-600
PIPING CONDITION OK
PIPING WORK PIPE & INSULATION
INSULATION SUCTION 19 LIQUID 19 MM SUCTION (19) ; LIQUID (13)
110 TOTAL PIPE LENGTH MTR MAX. 1000 MTR
PIPING LENGTH (AS PER
3 ELEVATION (ODU ~ IDU) MTR MAX. 110 MTR
LATS)
15 1ST Y BRANCH ~ IDU MTR MAX. 40 MTR
WIRE SPECS IDU POWER CABLE 2.5 FLEXIBLE SQ.MM X 3 CORE
TOTAL NO OF IDU 26 QTY
INDOOR UNIT TOTAL INDOOR UNIT CAPACITY 126.5 Tr KW/TR
REMOTE CONTROLLER WIRED/WIRELESS
DRAIN WORK OK TESTED
FOR COOLING OPERATION ONLY
ITEMS RESULT CRITERION
ALL INDOOR UNIT DISPLAY OK ON LGMV SCREEN
T PIPE IN (AVG TEMP) 10.28 °C 8°-15°C
EEV PULSE 300 PULSE 200-600 PULSE
INDOOR UNIT
AIR DISCHARGE OK FAN OPERATING
DRAIN WORK OK NO WATER LEAKAGE
REFRIGERANT NOISE NO NOISE NO REFRIGERANT NOISE
FREQUENCY M S1 S2 S6
START UP (LGMV)
THIS IS TO CERTIFY THAT LG HAS COMPLETED THE AIRCONDITIONING WORKS AT ABOVE ADDRESS IN ALL RESPECTS. FURTHER, THE SYSTEM IS RUNNING SATISFACTORILY AND HAS BEEN HANDEDOVER TO THE CUSTOMER/ USER FOR
BENEFICIAL USE. THE PERFORMANCE PARAMETERS OF A-C SYSTEM/S ARE RECORDED AND WITNESSED BY THE UNDERSIGNED. FOR ANY BREAKDOWN/ WARRANTY SERVICES, PLEASE CONTACT OUR DEALER OR UNDERSIGNED
PROJECT/SERVICE ENGINEER.
DATE 15.12.2023
Note:
- The 'Pre-Start up' & 'Start up Report' Should be filled in by a certified person in charge.
- Under LG confirmation, warranty period will start officially.
- Without report and confirmation, LG has no responsibility for guarantee.
I, the supervisor, take all the responsibilities for this start up.
MULTI VRV PRE-START UP COMMISSIONING & HAND OVER REPORT
PROJECT CODE MULTI V-5 SYSTEM NO. 28 HP
LG ELECTRONICS INDIA PVT. LTD.
12th to 20th Floor Tower 1, KP tower, Plot No. C-001B, Sector 16B, Noida, Uttar Pradesh 201301
NAME COMPANY NAME & ADDRESS CONTACT DETAILS
Reliance Projects & Property Management Services Ltd
PERSON IN CHARGE
CUSTOMER DETAIL
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
Reliance Projects & Property Management Services Ltd
SITE ADDRESS
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
SHREE SVS SYSTEMS
POWER OK
WIRING TRANSMISSION OK
CENTRAL CONTROLLER OK AC EZ
PIPE SIZE @ HEADER SUCTION 34.9 LIQUID 15.88 MM HARD DRAWN
LEAKAGE TEST @ 550 PSIG MIN 24 HRS
VACUUMING 490 MICRONS 300-600
PIPING CONDITION OK
PIPING WORK PIPE & INSULATION
INSULATION SUCTION 19 LIQUID 19 MM SUCTION (19) ; LIQUID (13)
110 TOTAL PIPE LENGTH MTR MAX. 1000 MTR
PIPING LENGTH (AS PER
3 ELEVATION (ODU ~ IDU) MTR MAX. 110 MTR
LATS)
15 1ST Y BRANCH ~ IDU MTR MAX. 40 MTR
WIRE SPECS IDU POWER CABLE 2.5 FLEXIBLE SQ.MM X 3 CORE
TOTAL NO OF IDU 26 QTY
INDOOR UNIT TOTAL INDOOR UNIT CAPACITY 126.5 Tr KW/TR
REMOTE CONTROLLER WIRED/WIRELESS
DRAIN WORK OK TESTED
FOR COOLING OPERATION ONLY
ITEMS RESULT CRITERION
ALL INDOOR UNIT DISPLAY OK ON LGMV SCREEN
T PIPE IN (AVG TEMP) 10.28 °C 8°-15°C
EEV PULSE 300 PULSE 200-600 PULSE
INDOOR UNIT
AIR DISCHARGE OK FAN OPERATING
DRAIN WORK OK NO WATER LEAKAGE
REFRIGERANT NOISE NO NOISE NO REFRIGERANT NOISE
FREQUENCY M S1 S2 S6
START UP (LGMV)
CUSTOMER REMARKS :
THIS IS TO CERTIFY THAT LG HAS COMPLETED THE AIRCONDITIONING WORKS AT ABOVE ADDRESS IN ALL RESPECTS. FURTHER, THE SYSTEM IS RUNNING SATISFACTORILY AND HAS BEEN HANDEDOVER TO THE CUSTOMER/ USER FOR
BENEFICIAL USE. THE PERFORMANCE PARAMETERS OF A-C SYSTEM/S ARE RECORDED AND WITNESSED BY THE UNDERSIGNED. FOR ANY BREAKDOWN/ WARRANTY SERVICES, PLEASE CONTACT OUR DEALER OR UNDERSIGNED
PROJECT/SERVICE ENGINEER.
DATE 15.12.2023
Note:
- The 'Pre-Start up' & 'Start up Report' Should be filled in by a certified person in charge.
- Under LG confirmation, warranty period will start officially.
- Without report and confirmation, LG has no responsibility for guarantee.
I, the supervisor, take all the responsibilities for this start up.
MULTI VRV PRE-START UP COMMISSIONING & HAND OVER REPORT
PROJECT CODE MULTI V-5 SYSTEM NO. 22 HP
LG ELECTRONICS INDIA PVT. LTD.
12th to 20th Floor Tower 1, KP tower, Plot No. C-001B, Sector 16B, Noida, Uttar Pradesh 201301
NAME COMPANY NAME & ADDRESS CONTACT DETAILS
Reliance Projects & Property Management Services Ltd
PERSON IN CHARGE
CUSTOMER DETAIL
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
Reliance Projects & Property Management Services Ltd
SITE ADDRESS
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
SHREE SVS SYSTEMS
POWER OK
WIRING TRANSMISSION OK
CENTRAL CONTROLLER OK AC EZ
PIPE SIZE @ HEADER SUCTION 34.9 LIQUID 15.88 MM HARD DRAWN
LEAKAGE TEST @ 550 PSIG MIN 24 HRS
VACUUMING 490 MICRONS 300-600
PIPING CONDITION OK
PIPING WORK PIPE & INSULATION
INSULATION SUCTION 19 LIQUID 19 MM SUCTION (19) ; LIQUID (13)
110 TOTAL PIPE LENGTH MTR MAX. 1000 MTR
PIPING LENGTH (AS PER
3 ELEVATION (ODU ~ IDU) MTR MAX. 110 MTR
LATS)
15 1ST Y BRANCH ~ IDU MTR MAX. 40 MTR
WIRE SPECS IDU POWER CABLE 2.5 FLEXIBLE SQ.MM X 3 CORE
TOTAL NO OF IDU 26 QTY
INDOOR UNIT TOTAL INDOOR UNIT CAPACITY 126.5 Tr KW/TR
REMOTE CONTROLLER WIRED/WIRELESS
DRAIN WORK OK TESTED
FOR COOLING OPERATION ONLY
ITEMS RESULT CRITERION
ALL INDOOR UNIT DISPLAY OK ON LGMV SCREEN
T PIPE IN (AVG TEMP) 10.28 °C 8°-15°C
EEV PULSE 300 PULSE 200-600 PULSE
INDOOR UNIT
AIR DISCHARGE OK FAN OPERATING
DRAIN WORK OK NO WATER LEAKAGE
REFRIGERANT NOISE NO NOISE NO REFRIGERANT NOISE
FREQUENCY M S1 S2 S6
START UP (LGMV)
CUSTOMER REMARKS :
THIS IS TO CERTIFY THAT LG HAS COMPLETED THE AIRCONDITIONING WORKS AT ABOVE ADDRESS IN ALL RESPECTS. FURTHER, THE SYSTEM IS RUNNING SATISFACTORILY AND HAS BEEN HANDEDOVER TO THE CUSTOMER/ USER FOR
BENEFICIAL USE. THE PERFORMANCE PARAMETERS OF A-C SYSTEM/S ARE RECORDED AND WITNESSED BY THE UNDERSIGNED. FOR ANY BREAKDOWN/ WARRANTY SERVICES, PLEASE CONTACT OUR DEALER OR UNDERSIGNED
PROJECT/SERVICE ENGINEER.
DATE 15.12.2023
Note:
- The 'Pre-Start up' & 'Start up Report' Should be filled in by a certified person in charge.
- Under LG confirmation, warranty period will start officially.
- Without report and confirmation, LG has no responsibility for guarantee.
I, the supervisor, take all the responsibilities for this start up.
MULTI VRV PRE-START UP COMMISSIONING & HAND OVER REPORT
PROJECT CODE MULTI V-5 SYSTEM NO. 22 HP
LG ELECTRONICS INDIA PVT. LTD.
12th to 20th Floor Tower 1, KP tower, Plot No. C-001B, Sector 16B, Noida, Uttar Pradesh 201301
NAME COMPANY NAME & ADDRESS CONTACT DETAILS
Reliance Projects & Property Management Services Ltd
PERSON IN CHARGE
CUSTOMER DETAIL
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
Reliance Projects & Property Management Services Ltd
SITE ADDRESS
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
SHREE SVS SYSTEMS
INSTALLATION DEALER SHREE SVS SYSTEM 9168320222
Galaxy Apartment, Office NO. 01, 1st Floor, Katraj Kondhwa Road, Pune - 411048
POWER OK
WIRING TRANSMISSION OK
CENTRAL CONTROLLER OK AC EZ
PIPE SIZE @ HEADER SUCTION 34.9 LIQUID 15.88 MM HARD DRAWN
LEAKAGE TEST @ 550 PSIG MIN 24 HRS
VACUUMING 490 MICRONS 300-600
PIPING CONDITION OK
PIPING WORK PIPE & INSULATION
INSULATION SUCTION 19 LIQUID 19 MM SUCTION (19) ; LIQUID (13)
110 TOTAL PIPE LENGTH MTR MAX. 1000 MTR
PIPING LENGTH (AS PER
3 ELEVATION (ODU ~ IDU) MTR MAX. 110 MTR
LATS)
15 1ST Y BRANCH ~ IDU MTR MAX. 40 MTR
WIRE SPECS IDU POWER CABLE 2.5 FLEXIBLE SQ.MM X 3 CORE
TOTAL NO OF IDU 26 QTY
INDOOR UNIT TOTAL INDOOR UNIT CAPACITY 126.5 Tr KW/TR
REMOTE CONTROLLER WIRED/WIRELESS
DRAIN WORK OK TESTED
FOR COOLING OPERATION ONLY
ITEMS RESULT CRITERION
ALL INDOOR UNIT DISPLAY OK ON LGMV SCREEN
T PIPE IN (AVG TEMP) 10.28 °C 8°-15°C
EEV PULSE 300 PULSE 200-600 PULSE
INDOOR UNIT
AIR DISCHARGE OK FAN OPERATING
DRAIN WORK OK NO WATER LEAKAGE
REFRIGERANT NOISE NO NOISE NO REFRIGERANT NOISE
FREQUENCY M S1 S2 S6
START UP (LGMV)
CUSTOMER REMARKS :
THIS IS TO CERTIFY THAT LG HAS COMPLETED THE AIRCONDITIONING WORKS AT ABOVE ADDRESS IN ALL RESPECTS. FURTHER, THE SYSTEM IS RUNNING SATISFACTORILY AND HAS BEEN HANDEDOVER TO THE CUSTOMER/ USER
FOR BENEFICIAL USE. THE PERFORMANCE PARAMETERS OF A-C SYSTEM/S ARE RECORDED AND WITNESSED BY THE UNDERSIGNED. FOR ANY BREAKDOWN/ WARRANTY SERVICES, PLEASE CONTACT OUR DEALER OR
UNDERSIGNED PROJECT/SERVICE ENGINEER.
DATE 15.12.2023
Note:
- The 'Pre-Start up' & 'Start up Report' Should be filled in by a certified person in charge.
- Under LG confirmation, warranty period will start officially.
- Without report and confirmation, LG has no responsibility for guarantee.
I, the supervisor, take all the responsibilities for this start up.
MULTI VRV PRE-START UP COMMISSIONING & HAND OVER REPORT
PROJECT CODE MULTI V-5 SYSTEM NO. 22 HP
LG ELECTRONICS INDIA PVT. LTD.
12th to 20th Floor Tower 1, KP tower, Plot No. C-001B, Sector 16B, Noida, Uttar Pradesh 201301
NAME COMPANY NAME & ADDRESS CONTACT DETAILS
Reliance Projects & Property Management Services Ltd
PERSON IN CHARGE
CUSTOMER DETAIL
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
Reliance Projects & Property Management Services Ltd
SITE ADDRESS
Smart Bazar, S No 4781 Babasaheb Paranjape Marg, Latur, Maharashtra 413512
SHREE SVS SYSTEMS
INSTALLATION DEALER SHREE SVS SYSTEM 9168320222
Galaxy Apartment, Office NO. 01, 1st Floor, Katraj Kondhwa Road, Pune - 411048
POWER OK
WIRING TRANSMISSION OK
CENTRAL CONTROLLER OK AC EZ
PIPE SIZE @ HEADER SUCTION 34.9 LIQUID 15.88 MM HARD DRAWN
LEAKAGE TEST @ 550 PSIG MIN 24 HRS
VACUUMING 490 MICRONS 300-600
PIPING CONDITION OK
PIPING WORK PIPE & INSULATION
INSULATION SUCTION 19 LIQUID 19 MM SUCTION (19) ; LIQUID (13)
110 TOTAL PIPE LENGTH MTR MAX. 1000 MTR
PIPING LENGTH (AS PER
3 ELEVATION (ODU ~ IDU) MTR MAX. 110 MTR
LATS)
15 1ST Y BRANCH ~ IDU MTR MAX. 40 MTR
WIRE SPECS IDU POWER CABLE 2.5 FLEXIBLE SQ.MM X 3 CORE
TOTAL NO OF IDU 26 QTY
INDOOR UNIT TOTAL INDOOR UNIT CAPACITY 126.5 Tr KW/TR
REMOTE CONTROLLER WIRED/WIRELESS
DRAIN WORK OK TESTED
FOR COOLING OPERATION ONLY
ITEMS RESULT CRITERION
ALL INDOOR UNIT DISPLAY OK ON LGMV SCREEN
T PIPE IN (AVG TEMP) 10.28 °C 8°-15°C
EEV PULSE 300 PULSE 200-600 PULSE
INDOOR UNIT
AIR DISCHARGE OK FAN OPERATING
DRAIN WORK OK NO WATER LEAKAGE
REFRIGERANT NOISE NO NOISE NO REFRIGERANT NOISE
FREQUENCY M S1 S2 S6
START UP (LGMV)
CUSTOMER REMARKS :
THIS IS TO CERTIFY THAT LG HAS COMPLETED THE AIRCONDITIONING WORKS AT ABOVE ADDRESS IN ALL RESPECTS. FURTHER, THE SYSTEM IS RUNNING SATISFACTORILY AND HAS BEEN HANDEDOVER TO THE CUSTOMER/ USER
FOR BENEFICIAL USE. THE PERFORMANCE PARAMETERS OF A-C SYSTEM/S ARE RECORDED AND WITNESSED BY THE UNDERSIGNED. FOR ANY BREAKDOWN/ WARRANTY SERVICES, PLEASE CONTACT OUR DEALER OR
UNDERSIGNED PROJECT/SERVICE ENGINEER.
DATE 15.12.2023
Note:
- The 'Pre-Start up' & 'Start up Report' Should be filled in by a certified person in charge.
- Under LG confirmation, warranty period will start officially.
- Without report and confirmation, LG has no responsibility for guarantee.
I, the supervisor, take all the responsibilities for this start up.
Date: 15.12.2023
To,
Reliance Projects & Property Management Services
Smart Bazar, S No 4781 Babasaheb Paranjape Marg,
Latur, Maharashtra 413512
Subject: Handing Over of LG Make VRF Air conditioning System for Reliance Projects
& Property Management Services, Smart Bazar Latur
Dear Sir,
This is with reference to the subject matter. We have commissioned the Air conditioning
system of (28 HP x Ckts 2) (22 HP x Ckts 3) Capacity at your office and has been put into
final operation on 15.12.2023 & now submitting following documents as per LG’s
standard handing over process:
Thanking you,
Sincerely yours,
Warranty Letter
DATE: - 15.12.2023
To,
Reliance Projects & Property Management Services Ltd
Smart Bazar, S No 4781 Babasaheb Paranjape Marg,
Latur, Maharashtra 413512
Dear Sir,
SUB: WARRANTY CERTIFICATE
We thank you for giving us wonderful opportunity for Supply & Installation of the Air conditioning Equipment’s at your new
premises. We are pleased to inform you that, we have successfully installed the system of our LG make.
SR
LOCATION
NO. MODEL NUMBER CAPACITY TYPE SERIAL NUMBER
1 JRUN140LTE5 14 HP ODU 211PHVK001247
1st Floor Front Side
2 JRUN140LTE5 14 HP ODU 210PHXB001450
AHU Room
3 AHU-8800CFM 28 HP IDU 05-23PID00432-01
4 JRUN140LTE5 14 HP ODU 212PHLU004288
5 JRUN140LTE5 14 HP ODU 211PHVK004751 1st Floor Front Side
6 AHU-8800CFM 28 HP IDU 05-23PID00432-02
7 JRUV220LTE5 22 HP ODU 212PHUP003358
Ground Floor Pantry
8 AHU-6800CFM 22 HP IDU 05-23PID00433-03
9 JRUV220LTE5 22 HP ODU 210PHXB012706 Ground Floor AHU
10 AHU-6800CFM 22 HP IDU 05-23PID00433-01 Room ODU
11 JRUV220LTE5 22 HP ODU 212PHAW003360 Ground Floor AHU
12 AHU-6800CFM Room ODU
22 HP IDU 05-23PID00433-02
The warranty period for the above system shall be from 15.12.2023 to 14.12.2024 (12 Months from Date of Commissioning).
During warranty period for any manufacturing defects in the system, the spare parts will be replaced at free of cost as per
LG Warranty Policy only.
Please contact our Authorized Dealer M/s SHREE SVS SYSTEMS – 9168320222 in case of any complaints.
Please feel free to contact our Customer Care Officer, for any kind of issues relating to 4 Quarterly Services & complaints
during the warranty period.
Thanking you and assuring you of our Best services and attention at all the times.
Yours Truly,
For LG Electronics (I) Pvt. Ltd. Shree SVS Systems
DOS:
3 WAIT FOR FEW SECONDS AFTER THE BEEP TO GET THE COMMAND EXECUTED.
5 KEEP THE FLAPS / AIR SWING IN MOVING POSITION FOR BETTER AIR FLOW.
DON'TS :
1 DO NOT RUN THE INDOOR UNIT WITHOUT SWITCHING ON THE OUTDOOR UNIT.
4 DO NOT KEEP OPEN THE DOORS/ WINDOWS WHILE THE AIRCONDITIONER IS ON.
(AUTHORISED SIGNATORY)
Warranty Policy