You are on page 1of 1

<S-072000-01 CHK>

Harbor Entering Checklist 1 (Day before Entering Harbor)

Checked
by

1 Have information obtained at the point of passage planning been □


reconfirmed?
If necessary, has it re-obtained and evaluated?
(Especially, the followings should be paid attention to)

Reconfirming Bridge Notebook and Briefing from the Master to the


Officers
Port information (including information of agent).
Weather information
Tides and currents, etc. of waters concerned.
Data related to water depths of approach channels, straits, etc. and
draught.
Limitations, etc. on traffic control, draught, trim, speed, port entry time,
as seen from the above information.
Information from latest navigational warnings, etc.
2 Has requirements in special waters been checked? □
(Requirements by law, regulation, VTIS, etc. at calling port)

Are communications being made with parties concerned?

3 ETA and other necessary matters. □


Ship position reporting system.

Are engine related preparations finished?

Auxiliary boiler firing test


Test operation of prim mover of generator
4 Measuring of insulation resistance of auxiliary deck machinery and □
lighting

Has operation of mooring winches and windlasses been checked?

5 Hydraulic motors. □
Windlasses on both sides of the ship.
Mooring winches.
6 □
Special Waters Requirements
(As per procedure entitled “Hazardous Navigation”)

Are all documents necessary for entering the harbor ready?

This checklist must be filled out by the officer of the watch on the Bridge, who enters in the
column “Checked by” his own signature, and the job title of each person from whom he has
received the information.

Time and Date:


At Port of:

Master: _____________________

You might also like