Professional Documents
Culture Documents
(Fore Station)
-Stationing of personnel: □
-Activation of hydraulic motors: □
-Standby of anchors on both sides of the ship: □
(After Station)
-Stationing of personnel: □
-Activation of hydraulic motors: □
19 Has preparations been made for test operation of main engine been made?
(Mooring lines tight, gangway and cranes free from obstructions, etc.)
20 Has test operation of main engine been finished?
21 Has the following work been carried out?
S/B eng.: Start the bow thruster:
24 Has the Master’s passage plan been shown to and exchanged with the pilot?
25 Has necessary information for stations fore and aft been given?
This checklist must be filled out by the officer of the watch on the Bridge, who enters in the column
“Checked by” his own signature, and the job title of each person from whom he has received the
information.
Master: