SL.No.

Question Answer
1 Full form of PPE Personal protective equipment
2 Types of PPE Two types (Mandatory & job specific)
Before start the job discuss about previous day incident, near miss,
3 What is Tool box talk
today job plan, hazard & control measure
4 How many types of strip Three types (Red, Orange & Green strip)
5 What is Red strip Fatal case
6 What is Orange strip LTI case
7 What is Green strip Safety alert strip and good initiative / practice
To promote learning from any incident. Also prevent similar incidents
8 What is Purple strip
in the future.
KIKEN YOCHI TRAINING (Belong from Japan country)
Hazard Prediction Training (English ward)
9 What is KYT What hazard we predict in a job,
Impact of Hazard- Consequence (Potential injury)
How to minimize this hazard (Countermeasure)
A near-miss is a potential hazard or incident in which no property
10 What is Near miss
was damaged and no personal injury was sustained

11 What is your site last near miss Every person must should know their site last near miss

Lost time injury. If happen any type of injury the employee not join
12 What is LTI
24 hour in his duty then declare LTI
13 What is Positive isolation Isolate any source of energy. Ex- gas, water, electricity, hydraulic etc.
Four types- Control stop, Individual isolation, Group isolation &
14 Method of positive isolation
isolation for working alone
15 What is LOTOTO LOG OUT, TAG OUT & TRY OUT
16 ESI full form Energy Source Identification
17 What is control stop Less than 30 minutes job. routine job, Low voltage
Four types of fire- A- Genera fire (wood), B- Oil fire (petrol, diesel), C-
18 How many types of fire Gases fire (LPG, methane, Electrical) and D- Metallic fire (Sodium,
magnesium)
Four types extinguisher- Water (General), Foam (Oil), DCP (Gas &
19 Types of fire extinguisher
metal) and CO2 (Electronics)
Pull the pin, Aim the base of fire, squeeze the trigger & swipe from
20 Full form of PASS method
side to side
21 Types of conveyer belt safety device Pull cord, BSS, ZSS, emergency switch
22 What is assembly point An emergency situation employee gather at designated place
23 Where is your assemble point Each site must should know their assembly points near by them
If happen any emergency situation, people gather assembly point &
24 What is head count
count them
UIL- UNITED INFRACORE LIMITED
Name of our company MD, GM, HR,
25 MD- Mr.Kishankant Sonthalia, GM-Mr.Vivek Jain,
Safety
HR- Mr.Purusattam Kumar, Safety- Mr.Amar Biswal
26 Full form of EPRP Emergency Preparedness and Response Plan
27 What is single point contact number 06726-660200
How to communicate, if happen any Initially inform to supervisor then Inform emergency team, gather
28
type of emergency assembly point, to support rescue team
Implement & maintain Safety & Health management system
Provide service in safe work environment with Zero incidents
29 What is company policy
Prevent injury & ill health and continual improvement in safety &
health performance
30 What is consequence management Take action against unsafe practices
31 Company providing basic amenities Bus, Guest house, etc.

32 Where you give your suggestion Through TBT, Mass meeting, site visit, line walk, suggestion box

33 Full form of SOP Standard operating procedure


34 What is visual SOP With pictural SOP
35 What is vernacular SOP With local language SOP
36 What is 5's sort, set in order, shine, standard & sustain
Site wise first aid box available & first
37 Office container
aider details
38 What is permit Work permit is a legal written document
39 How many agency include in permit Three agency (Owner agency, executing agency & working agency)
40 Full form of JHA Job Hazard Analysis
41 Full form of JCC Job Cycle Check
42 Full form of HIRA Hazard identification risk assessment
Maximum how many PPM a person
43 Maximum 50 PPM
work for 8 hour duty
44 PPM full form Part per million
45 Road Safety- traffic signal Three types- Red, Yellow & Green
46 How many types of signage board Three types- Mandatory, Cautionary & informatory
Speed limit for HMV & LMV inside
47 HMV- 20 KMPH & LMV-30 KMPH in main road
plant main road
Speed limit for HMV & LMV inside
48 HMV- 10 KMPH & LMV-20 KMPH in main road
plant branch road
49 No entry timing 7.30 am to 9.30 am and 5.45 pm to 7 pm
50 How many types of severity 5 types of severity (severity-1, severity-2, severity-3, severity-4 & severity-5)
51 What is CAPA Corrective Action & Preventive Action
52 How many types of LSR rules 12 types of Life Saving Rules
Incident-LTI, Dated- 14 October 2023, Location- BF GRANSHOT
M/S- UIL, Mr. Yogendra Mohanta as a point’s man engaged in B-
shift duty for torpedo placement activity at Granshort. 1st torpedo
placed at Granshort After placement of torpedo he was moving
53 M/S- UIL, LTI CASE at TSK towards pulpit for taking clearance for connecting plug top on the
torpedo. During the process he was descending a small staircase of
1.5 ft. height, where he slipped and while falling, he took support on
his hand. Immediate inform and x-ray at Tata steel Medica Hospital
Found right hand wrist in fracture.
Incident-LTI, Dated- 12 November 2023,
Location- HSM Finishing mill
Prakash Kumar Sahoo (Jr. Engg, TSL) was engaged in checking of the
nozzle of the header of finishing scale breaker which is adjacent to
F1. For this he entered in the space between the F1 and Scale
breaker. Simultaneous to this, roll changing job was in progress and
54 Last LTI in TSK & describe
bogie was removing the rolls. To remove the rolls the guides moved
outward. Since the IP has placed his right leg in the path of
movement of guide it got entangled between the gaps. He was
rescued and taken to Medica hospital. compound fracture noticed
below the right knee. He is under treatment at Apollo hospital,
Bhubaneswar.