JOHN ENERGY LTD

Experience Make The Difference

RIG NO :- J# 00
WELCOME TO OUR

FACILITIES
2 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00
BEFORE WE START

3 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


1. Site details

4 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Rig Details With Photo

5 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


CLIENT

6 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Company Man – B2B

Name: Name:

7 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Company Man – B2B

Name: Name:

8 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


TP – B2B

Name: Name:

9 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


NTP – B2B

Name: Name:

10 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


HSE OFFICER – B2B

Name: Name:

11 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


OUR VISION

No one gets Minimize No occupational


Injured environmental impact illness

GOAL O S
R
ZE E N T
C I D
I N

12 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Cairn India – 2011

Site Specific Rules


SMOKING
Smoking permitted only in the designated Smoking area.

Camera
Photography is prohibited. Permission to be obtained
from company men

MOBILE
Mobiles are prohibited inside the Rig site.

Lighters /Match Box


Deposit at Security post.

Speed Limit
5 Km / Hr.
13
Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00
Zero Tolerance Behaviors

No Drugs or Alcohol at work No driving without No night time Rig


place Seat Belt Moves

PERMIT

No child labour Do not carry out No Confined No work without No overriding or


allowed work without Space Entry mandatory Personal bypassing or
valid Permit to without Protective disabling safety
Equipment (PPE) critical systems
Work (PTW) Authorisation without proper
authorisation

14 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


COMMON HAZARD – IN & AROUND

 Be aware of snakes and


scorpions, especially in dark.

 Check your room thoroughly


before going to bed.

 Check boots and clothes in the


morning before putting on.

 Do not touch any unidentified


things with bare hands.

15 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


SITE RULES
 No littering in Project Areas.

 The use of tobacco products strictly prohibited.

 Visitors not allowed to drive vehicle on Project site.

 Visitors are not allowed to leave project areas unescorted.

 No unofficial visitors allowed in project areas.

 Pay attention to evacuation procedures (posted on noticeboards)

 Additional Project information posted on noticeboards.

16 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


2. Hazards and Risks

What are the more


common risks on a
Drilling site ?

17 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


18 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00
3. Safety Signs

19 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Red circle and bar
Do not
Black symbol

Blue background
Must do
White symbol

Red circle
Restriction
Black symbol

Yellow triangle
Warning hazard
Black symbol

Red oval on black


rectangle
Danger
Black text

Green background
Emergency information
White symbol

Red background
Fire
White symbol

20 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


4. Accidents and Injuries

21 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Location of the MEDICAL FACILITY

• Located near R/O Bunk House


• Name of the MEDIC:
Mr. Dr. M S Charan

22 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


5. Emergency procedure

23 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


ON HEARING ALARM
1) Keep calm
2) Stop work and switch off
all machinery/vehicles/engines
3) Leave the area
4) Take the safest and nearest way
5) Proceed immediately to the
emergency assembly point
6) Stay at the assembly point until
“all clear” is given

24 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


General Alarms
BOP H2S FIRE

3-SHORT HORN CONTININOUS 3- LONG HORN


BLASTS HORN BLASTS

7 SHORT HORN BLASTS - ALL CLEAR


YOU MAY RETURN TO YOUR WORK PLACE

25 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


GENERIC WELL PAD EMERGENCY ARRANGEMENTS

Rig Equipment's

RIG

Rig Equipment's

U
URR
HER
HER
E
E
Bunk Bunk HSE Training
26 Houses Houses Room
Assembly Points

The assembly points are situated:


Assembly point -1

Assembly point - 2

27 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Emergency phone numbers

• Site Medic :
• Site HSE :
• Site RO :

28 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


6. HEALTH AND HYGIENE

 Only drink bottled water


 Wash hands often
 Heat – Sun

29 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Life Savers

Protect yourself
Ensure Derrick Retractable Fall A lift plan describes how Obtain
Wire Rope Grabber against a fall when
Transfer Flapper - to lift and hoist safely. authorization
arrester on Monkey System Available on working at height
above 1.8 Mtr. Use Ensure Taglines to before entering a
Walkway from Mast Board, Crown & Mast Ladder Double lanyard Full control load .Working or confined space.
ladder to monkey Below Sub Structure body harness with walking under a Conduct gas testing
Board Scaffolding / flat steel frequently
suspended load is unsafe
rebar hook while
as the load can fall on
working @ Mast
you.

50 60 70
40 80
30 90
20 100
10 110

KM/HR

Prevent Dropped Obtain authorization


Objects.
Keep Yourself Work with a Do not exceed Escort vehicle for
Safe from before overriding or defined driving all Wide Loads.
Carry tools on tool valid work disabling safety critical speed limits. Follow Proper Lashing /
kit While working Moving or permit when equipment such as Journey Stanchion for
at height and Use Pressurised required. Floor-O-Matic, Crown- management Plan securing loads
retainers. Equipment O-Matic etc.
Do PSJM for all
critical jobs.
“FOLLOW LIFE SAVERS AND GO HOME SAFELY”
7. HAZARD CONTROL PROGRAMME

31 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


 The Tool - STOP CARDS

32 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


8. Safety Recognition

Employees following
good safety practices shall
be recognised

 Disciplinary Action Programme


• Disciplinary action is not the main tool. Main tool is Safety awareness.
• However it can be used in-case of serious or deliberate or repeated breach
of project HSE rules.
• Management has the authority to take appropriate disciplinary action that
includes TERMINATION FROM THE PROJECT.

33 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Any Questions ?

34 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00


Thank you for your attention

Please sign our visitor induction register


and wear your visitor’s badge while at
WELL PAD.
Please enjoy your visit and have a safe
Journey.
35 Doc No.- IMS/HSE/PP-00/ VISITOR -ENI/ Rev. No: 00