You are on page 1of 1

Mono Fase c

C12 IND Mono Fase a Mono Fase b

Trafo 2 C12 RES


Switch Trafo 3 21.2
Line 12/13 Line 13/14 Line 8/14
0.0 74.8 172.2 179795.1

-0.6 % -2.8 % -4.1 %


-0.56 % -2.82 % -4.13 % C14 IND
-3.2 % -10.1 % -14.6 %

1000.0
1000.0
999.990

Line 8/7
-3.3 C6 RES
S2 Line 7/6
-100.0
C8 IND
External Grid

C8 RES C7 IND
Mono Fase c
2.3 % C7 RES
2.28 %
11.2 %

Line 3/8 2.3 % -0.0 1.7 %


-61.1 2.27 % -0.0 1.69 %
11.1 % -2.236 8.4 %

9
2.3 %
2.28 %
11.2 %
0.0
-0.0 0.0
-0.0 -2.400
Mono Fase a -2.187
Line 11/10
-2.1
C9 RES
S3 Line S3/11
-100.0 C11 IND

2.3 % C11 RES C10 RES


2.30 %
11.3 %
Trafo 1
Switch Trafo 1 -6.5
Linha 1/2 Line 2/3 C3 IND 2.3 %
0.0 -24.8 -33.9 C5 IND 2.29 %
11.3 %
C5 RES
C3 RES Line 4/5
C2 IND -1.6
C1 RES

Line 3/4
C2 RES -1.6 Line 5/6
-1.6
C1 IND
1.2 % 1.7 %
1.18 % 1.67 %
Inactive 0.6 % 5.9 % 8.3 % 1.7 %
0.58 % 1.7 % Mono Fase b
Out of Calculation 3.4 % 1.67 % 1.68 %
8.2 % 8.3 %
-0.0 % De-energised
-0.00 %
0.0 %
Voltages / Loading
Lower Voltage Range
1. p.u.
...
0.95 p.u. Grid: Summary Grid

... Generation = 0.00 % 0.00 % 0.00 %


External Infeed = 0.09 % -1.80 % -0.42 %
0.9 p.u. Inter Area Flow = 0.00 % 0.00 %
Upper Voltage Range Loads, P = 0.00 % 0.00 % 0.00 %
Loads, P(Un) = 0.00 % 0.00 % 0.00 %
1. p.u. Loads, dP(Un-U) = -56.67 % -59.87 %
Load Flow 3-phase(ABC) ... Motors, P = 0.00 % 0.00 % 0.00 %
Losses, P = 16.10 % -6.24 %
Nodes Bra 1.05 p.u. Line Charging = -4.74 %
Sistema teste Project: Cigré
Line-Line Positive-Sequence Voltage, Magnitude [%] Tot
...
Compensation ind. =
Compensation cap. =
0.00 %
0.00 % C. C. Trifásico
1.1 p.u. Installed Capacity =
Spinning Reserve =
0.00 %
0.00 %
Graphic: Sistema teste
Positive-Sequence Voltage, Magnitude [%] Tot Loading Range Total Power Factor:
80. % Generation = 0.00 [-] Date: 11/12/2023
Positive-Sequence Voltage, Angle [%] Pos Load/Motor = -0.00 / 0.00 [-]
... PowerFactory 2023 SP4 Annex: