The document provides a replotting schedule for Popa from June 12-18, 2023. It lists the names and worker numbers of various employees in different work groups (D, C, E) and their scheduled work days. Group D has 5 employees working each day. Group C has 4 employees working with 2 working every day. Group E has no employees working. The document also provides details on various maintenance, production, quality control, safety, and loading roles and the employees scheduled for them each day.
The document provides a replotting schedule for Popa from June 12-18, 2023. It lists the names and worker numbers of various employees in different work groups (D, C, E) and their scheduled work days. Group D has 5 employees working each day. Group C has 4 employees working with 2 working every day. Group E has no employees working. The document also provides details on various maintenance, production, quality control, safety, and loading roles and the employees scheduled for them each day.
The document provides a replotting schedule for Popa from June 12-18, 2023. It lists the names and worker numbers of various employees in different work groups (D, C, E) and their scheduled work days. Group D has 5 employees working each day. Group C has 4 employees working with 2 working every day. Group E has no employees working. The document also provides details on various maintenance, production, quality control, safety, and loading roles and the employees scheduled for them each day.