Province: Samar

City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2016)

NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS


Improvement of San Roque- Saugan FMR (Phase X) 2,513,364.19 100% SERVICEABLE
Construction of Composting & Wood Vinegar Facility Building at Poblacion 2, Daram, Samar 335,707.01 100% SERVICEABLE
Construction of Multipurpose Civic Center (Phase 1) at Brgy. Tugas, Daram, Samar 169,354.63 100% SERVICEABLE
Construction of Box Culvert at Mabini-Astorga-San Vicente-Bono-anon FMR 820,459.55 SERVICEABLE (1 BOX CULVER
100% NEED REPAIR)
Improvement of Materials Recovery & Facility 594,367.61 100% SERVICEABLE
Repair/Rehabilitation of Evacuation Route (Pathway/Road) going to Daram High National School 493,200.76 100% SERVICEABLE
Repair & Rehab. of Multipurpose Building (Evacuation Center) at Brgy. Rizal, Daram, Samar 2,295,127.64 100% SERVICEABLE
Construction of Multipurpose Building (Evacuation Center) at Brgy. Calawan-an, Daram, Samar 3,493,802.78 100% SERVICEABLE
Repair & Rehab. of Multipurpose Building (Evacuation Center) at Brgy. Bachao, Daram, Samar 2,144,798.21 100% SERVICEABLE
Repair & Rehab. of Multipurpose Building (Evacuation Center) at Brgy. Birawan, Daram, Samar 2,295,135.26 100% SERVICEABLE
Repair & Rehab. of Multipurpose Building (Evacuation Center) at Poblacion 1, Daram, Samar 692,580.16 100% IMPROVED & SERVICEABLE
Construction of Daycare Center at Brgy. Cabac, Daram, Samar 496,602.29 100% SERVICEABLE

Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________

Province: Samar
City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2017)

NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS


Improvement of Health Service Deilivery (Waiting Area) 995,609.10 100% SERVICEABLE
Rehabilitation of Basketball Court at Municipal Plaza, Daram, Samar 494,854.97 100% IMPROVED & SERVICEABLE
Repair of Wharf and Waiting Shed at Brgy. Mayabay, Daram, Samar 1,545,034.82 100% SERVICEABLE
Construction of Health Center of Sua, Daram, Samar 666,279.08 100% SERVICEABLE
Construction of Evacuation Center at Brgy. Mayabay, Daram, Samar 9,959,883.68 100% SERVICEABLE
Rehabilitation/Repair of Road with Box Culvert at Poblacion 2, Daram, Samar 643,478.85 100% SERVICEABLE
Construction of Astorga-Talisay FMR 1,986,833.28 100% SERVICEABLE
Construction of Pathwalk Cagboboto Sitio Dau at Brgy. Cagboboto, Daram, Samar 594,748.80 100% SERVICEABLE
Construction of Elevated Pathwalk at Sitio Mantarong, Poblacion 2, Daram, Samar 395,655.88 100% SERVICEABLE
Construction of Road/Pathwalk (from Brgy. San Miguel to Sitio Ipil) San Miguel, Daram, Samar 694,612.46 100% SERVICEABLE
Repair/Rehabilitation of Multipurpose Building (at Hillside) at Poblacion 1, Daram, Samar 1,659,753.45 100% IMPROVED & SERVICEABLE
Establishment of GAD/Womens Skills Training Center at Poblacion 2 498,000.00 100% IMPROVED & SERVICEABLE
Construction of Wharf at Sitio Mangere, Brgy. San Vicente, Daram, Samar 394,303.95 100% SERVICEABLE
Concreting of Local Access Road ( Saugan -Real section), Daram, Samar 11,119,285.69 100% SERVICEABLE
1,986,883.43 SERVICEABLE/UNSERVICEABLE
Construction of Candugue-Calawan-an FMR at Daram, Samar 100% FOR VEHICLES
Construction of Various Agricultural Projects (Phase 1) 1,180,026.45 100% SERVICEABLE & OPERATIONAL

Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________

Province: Samar
City/Municipality: Daram
LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2018)

NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS


Construction of Wharf with Wooden Waiting Area at Barangay Mabini, Daram, Samar 994,617.36 100% SERVICEABLE
Installation of Additional Street Light at Poblacion 1, Daram, Samar 300,000.00 100% NO LONGER EXIST
Extension of Wharf with waiting Shed at Poblacion 1, Daram, Samar 3,492,251.70 100% IMPROVED & SERVICEABLE
Construction of San Vicente-Nipa FMR at Daram, Samar 1,990,367.28 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Construction of Poblacion 3- Buenavista FMR at Daram, Samar 2,491,804.04 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Repair of Daycare Center at Poblacion 1, Daram, Samar 2,189,416.97 100% IMPROVED & SERVICEABLE
Construction of Seawall Extension at Poblacion 1, Daram, Samar 2,992,742.66 100% IMPROVED & SERVICEABLE
Construction of Road at Sitio Mandagara, Brgy. Astorga, Daram, Samar 200,000.00 100% IMPROVED & SERVICEABLE
Construction of 4 units Daycare Center at 4 Brgys, of Daram, Samar 2,190,092.36 100% ALL ARE SERVICEABLE
Construction of Erosion Control at Poblacion 1, Daram, Samar 2,989,198.12 100% SERVICEABLE
Construction of Watch Tower at Poblacion 3, Daram, Samar 426,970.11 100% SERVICEABLE
Retrofitting of MDRRM Building at Poblacion 1, Daram, Samar 795,967.25 100% IMPROVED & SERVICEABLE
Construction of Multipurpose Shed cum & Info Center at Poblacion 2, Daram, Samar 1,512,134.36 100% SERVICEABLE
Construction of Multipurpose Hall at Brgy. Poso, Daram, Samar 792,179.82 100% SERVICEABLE

Construction of Water Supply System at Brgy, Tugas, Daram, Samar 997,035.06 UNSERVICEABLE/ NO WATER
SUPPLY/PUMP IS NOT
100% OPERATIONAL
Construction of Multipurpose Hall at Brgy. Cambuhay, Daram, Samar 5,955,392.84 100% SERVICEABLE
Establishment
Construction ofofDrainage
GAD center/Women Skills Training
Canal ( Saugan-Pondang Center), Daram, Samar
Section 498,000.70 100% IMPROVED & SERVICEABLE
1,995,664.14 100% REPAIRED & SERVICEABLE
Concreting of Local
Concreting of Access Road
Local Access Road (San
(San Roque-Saugan
Roque-Saugan section)
section) 1,994,928.48 100% SERVICEABLE
Construction of Soong-Buenavista FMR at Daram, Samar 1,992,061.39 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Construction of Pondang-Sua FMR (Phase II) 1,994,896.35 100% SERVICEABLE
Concreting of Local Access Road (Bagacay-Campelipa road Section), Daram, Samar 6,113,063.28 100% SERVICEABLE
Improvement of Benito Park at Poblacion 1, Daram, Samar 495,505.97 100% IMPROVED & SERVICEABLE
Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________

Province: Samar
City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2019)


NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS
Expansion of Evacuation Center at Brgy. Mayabay, Daram, Samar 992,068.65 100% IMPROVED & SERVICEABLE
Concreting of San Roque-Saugan FMR (phase XI), Daram 2,990,259.90 100% SERVICEABLE
Construction of Campelipa-Pondang Section FMR, Daram, Samar 2,991,807.92 100% SERVICEABLE
Construction of Drug Education Center at Poblacion 1, Daram, Samar 3,992,086.29 100% SERVICEABLE
Construction of Cross Drainage Canal (Pondang- Calawan-an FMR), Daram, Samar 1,995,475.86 100% SERVICEABLE
Construction of Calawan-an- Bachao FMR, Daram, Samar 2,492,597.52 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Construction of Various Agricultural Projects at Daram, Samar 1,303,438.50 100% ALL ARE SERVICEABLE
Retrofitting of MDRRM Building at Poblacion 1, Daram, Samar 795,967.25 100% IMPROVED & SERVICEABLE
Construction of Level II-Pump Driven Water Supply System at Brgy. San Jose, Daram, Samar 1,990,480.90 100% SERVICEABLE
Construction of 3 Units Deep Well at Poblacion 1 & 3, Daram, Samar 747,370.31 100% 2 ONLY SERVICEABLE
Establishment of 27 meters Floating Wharf at Brgy. Mabini, Daram, Samar 595,349.87 100% NO LONGER EXIST

Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________

Province: Samar
City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2020)


NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS
Road Opening Nipa-Jacopon FMR at Daram, Samar 3,488,888.22 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Road Opening Nipa-San Jose FMR at Daram, Samar 3,487,989.33 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Improvement of San Vicente-Nipa FMR at Daram, Samar 4,988,525.04 SERVICEABLE/UNSERVICEABLE
100% FOR VEHICLES
Concreting of One Lane Road at Brgy. San Vicente section of SERVICEABLE/UNSERVICEABLE
3,489,437.43
Mabini-Bono-anon FMR 100% FOR VEHICLES
Improvement of 2nd Lane Portion of the Municipal Road Daram to San Roque Crossing 3,491,674.95 100% SERVICEABLE
Improvement of 2nd Multipurpose Building at Poblacion 1, Daram, Samar 4,993,609.28 100% IMPROVED & SERVICEABLE
Construction of Bridge Connecting to Multipurpose at Poblacion 1, Daram, Samar 894,992.50 100% SERVICEABLE
Concreting of 2nd Lane of Municipal Road at Poblacion 1, Daram, Samar 7,979,457.21 100% SERVICEABLE
Concreting of Road at Mayabay Section OF San-Roque-Mayabay FMR at Daram, Samar 9,884,673.88 100% SERVICEABLE
Construction of Rinsing Area and Comfort Room at Brgy. Mabini, Daram, Samar 200,000.00 100% STILL EXIST/USERVICEABLE
Construction of Terminal Shed for Habal-habal Transportation at Daram, Samar 100,000.00 100% SERVICEABLE

Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________

Province: Samar
City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2021)

NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS


Construction of Multi-purpose Civic Center (Phase I) at Brgy. Cansaganay, Daram, Samar 175,811.02 100% SERVICEABLE
Construction of Multi-purpose Civic Center (Phase I) at Brgy. Campelipa, Daram, Samar 1,790,469.09 100% SERVICEABLE
Improvement of Multipurpose Hall at Brgy. Casab-ahan, Daram, Samar 320,000.00 100% SERVICEABLE
Rehabilitation of Brgy. Wharf with Waiting Shed at Brgy. Tugas, Daram, Samar 300,000.00 100% SERVICEABLE
Construction of Elevated Path walk at Sitio Bato, Brgy. Calawan-an, Daram, Samar 1,334,143.10 100% SERVICEABLE
Improvement of Multipurpose Building at Brgy. San Miguel, Daram, Samar 290,000.00 100% SERVICEABLE
Rehabilitation of Pier I at Pob.1, Daram, Samar 3,489,604.28 100% IMPROVED & SERVICEABLE
Construction of Public Market and Commercial Building at Pob.1, Daram, Samar (Phase I) 2,896,832.23 100% IMPROVED & SERVICEABLE
Road Improvement (Going to Church) at Pob.1, Daram, Samar 150,000.00 100% SERVICEABLE
Rehabilitation of Perimeter Fence at Municipal Vicinity Pob.1, Daram, Samar 400,000.00 100% SERVICEABLE
Establishment of Women’s Organization Food Park at Pob.1, Daram, Samar 1,000,000.00 100% IMPROVED & SERVICEABLE
Rehabilitation of Women’s Livelihood Development Center at Pob.2, Daram, Samar 997,321.93 100% IMPROVED & SERVICEABLE
Rehabilitation of Women’s Dormitory at Pob.2, Daram, Samar 799,478.70 100% IMPROVED & SERVICEABLE
Improvement of Multi-Purpose Building Pob.1, Daram, Samar 500,000.00 100% IMPROVED & SERVICEABLE
Landscaping of Municipal Park at Pob.1, Daram, Samar 500,000.00 100% IMPROVED & SERVICEABLE
Construction of Floating Cottage with Kiddy Pool at Kandiwata Brgy. Mabini, Daram, Samar 350,000.00 100% STILL EXIST/ UNSERVICEABLE
Installation of Park Lightings at Pob.1, Daram, Samar 400,000.00 100% SERVICEABLE
Repair of Covered Court at Public Toilet at Pob.1, Daram, Samar 300,000.00 100% SERVICEABLE
Improvement of RHU Building at RHU Compound, Daram, Samar 2,291,738.35 100% IMPROVED & SERVICEABLE
Construction of Public Market and Commercial Building at Pob.1, Daram, Samar (Phase II) 4,987,905.80 100% IMPROVED & SERVICEABLE
Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________


Province: Samar
City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2022)

NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS


Rehabilitation of Seawall (Phase II) with Bay Walk at Pob.1 Daram, Samar 19,987,818.28 100% SERVICEABLE
Improvement and Extension of Pier 2 (Phase III) at Pob.1, Daram, Samar 9,987,198.49 100% SERVICEABLE
Construction of Radial Road (from Pob. 1 Commercial Center to Pob.2 Crossing) Phase II 2,986,201.80 100% SERVICEABLE
Rehabilitation of Municipal Road (Real-Campelipa Section), Daram, Samar 1,993,176.90 100% SERVICEABLE
Rehabilitation of Flood Control Projects at Brgy. San Antonio, Daram, Samar 498,360.14 100% SERVICEABLE
Rehabilitation of Flood Control Projects at Brgy. Sua, Daram, Samar 994,621.00 100% SERVICEABLE
Rehabilitation of Flood Control Projects at Brgy. Cabil-isan, Daram, Samar 994,645.99 100% SERVICEABLE
Reblocking of Sua- Candugue Road, Daram, Samar 350,000.00 100% SERVICEABLE
Repair of OSCA Building at Poblacion 1, Daram, Samar 396,815.77 100% SERVICEABLE
Repair of Cross Drainage Canal at Brgy. Mayabay, Daram, Samar 197,120.13 100% SERVICEABLE
Construction of Multi-Purpose Civic Center (Phase II) at Brgy. Cansaganay, Daram, Samar 996,018.28 100% SERVICEABLE
Construction of Multi-Purpose Civic Center (Phase II) at Brgy. Campelipa, Daram, Samar 996,018.28 100% SERVICEABLE
Rehabilitation of Seawall at Barangay Arawane, Daram, Samar 1,495,945.20 100% SERVICEABLE
Establishment of Brgy. Daycare Center at Brgy. Cabac, Daram, Samar 599,498.66 100% SERVICEABLE
Improvement of Multi-purpose Building at Brgy. Sua, Daram, Samar 695,441.99 100% SERVICEABLE
Construction of Floating Restroom with Septic Tank (Brgy. Mabini, Daram, Samar 170,000.00 100% STILL EXIST/UNSERVICEABLE
Fabrication of Floating Station for Staff and Lifeguard at Brgy, Mabini, Daram, Samar 365,000.00 100% SERVICEABLE
Construction of Grill House/Stall/Station at Tourist Lodge with the use of Bamboo 15,000.00 100% SERVICEABLE
Installation of Post & Lightings at Ecolodge Stairs and Surrounding Perimeter 36,000.00 100% SERVICEABLE
Construction of Poultry House at Pob.2, Daram, Samar 396,591.20 100% SERVICEABLE
Construction of Nursery Perimeter Fence at Pob.2, Daram, Samar 496,740.84 100% SERVICEABLE
Improvement of Motor pool at Pob.2, Daram, Samar 1,994,040.55 100% SERVICEABLE
Construction of Slope Protection (Above Elementary & Daram National High School) 1,498,174.25 100% SERVICEABLE
Construction of National Child Development Center at Pob. 1, Daram, Samar 3,488,683.08 100% SERVICEABLE
Concreting of Local Core Road (Brgy. Pondang-Sua Road Section, Daram, Samar) 4,990,236.22 100% SERVICEABLE

Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________


Province: Samar
City/Municipality: Daram

LIST OF LOCAL GOVERNMENT CONSTRUCTION PROJECTS (2023)

NAME OF PROJECTS AMOUNT PERCENT ACCOMPLISHMENT REMARKS


Construction of Drainage Canal (Public Market to Pier 1) Daram, Samar 497,251.57 100% SERVICEABLE
Construction of One-Storey Building at Poblacion 1, Daram Samar 550,000.00 100% SERVICEABLE
Improvement of 2nd Floor of Multi-Purpose Building (Phase 4) 2,742,392.55 100% SERVICEABLE
Improvement of Bay walk at Poblacion 1, Daram, Samar 1,993,533.31 100% SERVICEABLE
Concreting Portion of Radial Road Commercial Center to Pob.2 Crossing, Daram, Samar 2,491,465.42 100% SERVICEABLE
Construction of Flood Control Project at Brgy. Birawan, Daram, Samar 2,244,605.41 100% SERVICEABLE
Construction of Flood Control Project at Brgy. San Jose, Daram, Samar 693,610.07 100% SERVICEABLE
Installation of Dream Daram Signage at Municipal Building II 792,959.16 100% SERVICEABLE
Improvement of Road Infront of Multi-Purpose Building, Daram, Samar 350,000.00 100% SERVICEABLE
Reblocking of Road Near Elementary School Road Section, Daram, Samar 300,000.00 100% SERVICEABLE
Improvement of Mayor Benito Park at Pob.1, Daram, Samar 300,000.00 100% SERVICEABLE
Establishment of Cultural Center at Pob.1, Daram, Samar 1,495,254.66 100% SERVICEABLE
Construction of Multi-Purpose Civic Center (Phase 1) at Brgy. Cabugao, Daram, Samar 1,587,562.28 100% SERVICEABLE
Rehabilitation of Health Center (Phase II) at Brgy. Bachao, Daram, Samar 1,791,719.38 100% SERVICEABLE
Construction of Food Processing Center at Brgy. Talisay, Daram, Samar 897,437.05 100% SERVICEABLE

Prepared By: Approved By:

ENGR. MARK JOSEPH B. CABANGANAN ENGR. GERARDO P. MUSTACISA


Name and Signature Name and Signature
Engineer I MPDC/M.E. Designate
Designation Designation

Date: _________________________________ Date: _________________________________