CHECKLIST FOR CONDUITING WORKS (Electrical) - CONCEALED

(in RCC Slab / Beams / Wall before concreting)


Document No: UBL/MMC/PC/R0, Dated 19-06-2023

Project Name : CONSTRUCTION OF SUB-STRUCTURE CIVIL WORKS FOR UTKAL LEVELS PROJECT,PHALA.

Client : URPL Utkal Realtors Pvt. Ltd. Date:

PMC : MASTERS MMC India Pvt. Ltd. Checklist Serial No:

Contractor : KE Karan Enterprise IR No:

GFC Drawing No :

Block Mkd : STRUCTURE / MEMBER DETAILS FLOOR

CHECKLIST FOR CONDUITING WORKS (Electrical) - CONCEALED

Conformity
Actual
(Random
Sl No Description of Items Required (Checked by Remarks
Sampling by
Contractor)
MMC/ Client)
A Material

PVC, Heavy / Medium Duty Or, Verified & Found


1 Type of Material & Class (As approved)
OK / NOT OK YES / NO
MS, Medium Duty

Make / Name of Manufacturer Verified & Found


2 AKG
OK / NOT OK YES / NO
(As approved)

Dia. of Conduit Pipe Verified & Found


3 25 mm / 20 mm
OK / NOT OK YES / NO
(As per approved drawing)

B Installation
Verified & Found
1 Conduit layout as per GFC drawing To be ensured YES / NO
OK / NOT OK
Verified & Found
2 Conduit dia as per approval To be ensured YES / NO
OK / NOT OK
Verified & Found
3 Fan Box Position to match with drawing To be ensured YES / NO
OK / NOT OK
Verified & Found
4 Fan box hook bar tied with reinforcement To be ensured YES / NO
OK / NOT OK
Verified & Found
5 Paint mark on shuttering for down pipe location To be marked with paint YES / NO
OK / NOT OK
Verified & Found
6 Paint mark on shuttering for Fan Box location To be marked with paint YES / NO
OK / NOT OK

Open ends of fan boxes, down pipes, J. Boxes & deeps etc. Verified & Found
7 Sealed / closed with gunny bag / Tape to prevent entering of cement slurry / All open ends to be sealed / packed YES / NO
concrete. OK / NOT OK

Down Pipe location match with masonary wall - check with architectural Verified & Found
8 To be ensured YES / NO
drawing. OK / NOT OK
Verified & Found
9 Joints intact - ensure well tied / fixed. To be ensured YES / NO
OK / NOT OK
Verified & Found
10 Check extending pipes for upper floors, if any To be ensured YES / NO
OK / NOT OK
Verified & Found
11 Check sleeves for services if any. To be ensured YES / NO
OK / NOT OK
Verified & Found
12 Replacing of damaged pipes To be ensured YES / NO
OK / NOT OK

REMARKS: Approved for next stage of work / Not Approved

Note : Please record the quantities overleaf or in Joint Measurement Sheet

Comments if Any :

CONTRACTOR (SGI ES) CLIENT/MMC CLIENT/URPL


CHECKLIST FOR EARTH PIT TEST (Electrical) - CONSTRUCTION POWER
IN GROUND
Document No:

Project Name : UTKAL LEVELS PROJECT,PHALA.

Client : URPL Utkal Realtors Pvt. Ltd. Date:

PMC : MASTERS MMC India Pvt. Ltd. Checklist Serial No:

Contractor : S2S SOIL TO SKY IR No:

GFC Drawing No : NOT APPLICABLE

Location:

CHECKLIST FOR EARTH RESISTANCE (Electrical)

Conformity
Actual
Sl No Description of Items Required (Random Sampling Remarks
(Checked by Contractor)
by MMC/ Client)

B TESTING Required Value ( in Ohm) Obtain Value ( in Ohm)

1 Earth Pit-1 1 Ohm <

2 Earth Pit-2 1 Ohm <

3 Earth Pit-3 1 Ohm <

4 Earth Pit-4 1 Ohm <

5 Earth Pit-5 1 Ohm <

6 Earth Pit-6 1 Ohm <

7 Earth Pit-7 1 Ohm <

8 Earth Pit-8 1 Ohm <

9 Earth Pit-9 1 Ohm <

10 Earth Pit-10 1 Ohm <

REMARKS:

Comments if Any :

Electrical In-Charge (S2S) Safety In-charge (S2S) Project Manager(S2S)


EARTH PIT LOCATION INFORMATION
IN GROUND
Document No:

Project Name : UTKAL LEVELS PROJECT,PHALA.

Client : URPL Utkal Realtors Pvt. Ltd. Date:

PMC : MASTERS MMC India Pvt. Ltd. Checklist Serial No:

Contractor : S2S SOIL TO SKY IR No:

GFC Drawing No : NOT APPLICABLE

Location:

EARTH PIT LOCATION INFORMATION

Sl No Earth Pit Description Location Remarks

1 Earth Pit-1 Reinforcement Yard near assamly point.

2 Earth Pit-2 Near tiolet area

3 Earth Pit-3 Near Tower Crane

4 Earth Pit-4 Near Tower Crane

5 Earth Pit-5 Near Tower Crane

6 Earth Pit-6 Near DG Set

7 Earth Pit-7 Near DG Set

8 Earth Pit-8 Near DG Set

9 Earth Pit-9 Near DG Set

10 Earth Pit-10 Near Main Transformer/ Security room.

Electrical In-Charge (S2S) Safety In-charge (S2S) Project Manager(S2S)