Project Name : CONSTRUCTION OF SUB-STRUCTURE CIVIL WORKS FOR UTKAL LEVELS PROJECT,PHALA.
GFC Drawing No :
Conformity
Actual
(Random
Sl No Description of Items Required (Checked by Remarks
Sampling by
Contractor)
MMC/ Client)
A Material
B Installation
Verified & Found
1 Conduit layout as per GFC drawing To be ensured YES / NO
OK / NOT OK
Verified & Found
2 Conduit dia as per approval To be ensured YES / NO
OK / NOT OK
Verified & Found
3 Fan Box Position to match with drawing To be ensured YES / NO
OK / NOT OK
Verified & Found
4 Fan box hook bar tied with reinforcement To be ensured YES / NO
OK / NOT OK
Verified & Found
5 Paint mark on shuttering for down pipe location To be marked with paint YES / NO
OK / NOT OK
Verified & Found
6 Paint mark on shuttering for Fan Box location To be marked with paint YES / NO
OK / NOT OK
Open ends of fan boxes, down pipes, J. Boxes & deeps etc. Verified & Found
7 Sealed / closed with gunny bag / Tape to prevent entering of cement slurry / All open ends to be sealed / packed YES / NO
concrete. OK / NOT OK
Down Pipe location match with masonary wall - check with architectural Verified & Found
8 To be ensured YES / NO
drawing. OK / NOT OK
Verified & Found
9 Joints intact - ensure well tied / fixed. To be ensured YES / NO
OK / NOT OK
Verified & Found
10 Check extending pipes for upper floors, if any To be ensured YES / NO
OK / NOT OK
Verified & Found
11 Check sleeves for services if any. To be ensured YES / NO
OK / NOT OK
Verified & Found
12 Replacing of damaged pipes To be ensured YES / NO
OK / NOT OK
Comments if Any :
Location:
Conformity
Actual
Sl No Description of Items Required (Random Sampling Remarks
(Checked by Contractor)
by MMC/ Client)
REMARKS:
Comments if Any :
Location: