1 MAT 2 2 MAT 2 3 MAT 0 4 SD 1 Rfi 0 6 MES RFI RFI 9 RFI 0 10 RFI RFI 12 RFI RFI 14 MAS 0 RFI 1 16 SHD 0 18 MAT 3 19 PSL 0 20 RFI 0 Mas 0
1 MAT 2 2 MAT 2 3 MAT 0 4 SD 1 Rfi 0 6 MES RFI RFI 9 RFI 0 10 RFI RFI 12 RFI RFI 14 MAS 0 RFI 1 16 SHD 0 18 MAT 3 19 PSL 0 20 RFI 0 Mas 0
1 MAT 2
2 MAT 2
3 MAT 0
4 SD 1
5 RFI 0
6 MES
7 RFI
8 RFI
9 RFI 0
10 RFI
11 RFI
12 RFI
13 RFI
14 MAS 0
15 RFI 1
16 SHD 0
17 MAT 3
18 MAT 3
19 PSL 0
20 RFI 0
21 MAS 0
22 RFI
23 RFI
Date
Document Description Received
Emergency Lighting Central Battery System
PTZ Camera
Furniture Console - Security Control Room
BASEMENT - ELV CONTAINMENT OVERALL LAYOUT
EMERGENCY CALL POINT/REFUGE CALL ALARM SYSTEM – REQUIRED 30-Sep
SPECIFICATION & VENDOR LIST.
Method Statement for Installation of CCTV System
Material Sample For Parking Management & Parking Guidance System 6-Nov
- Device and Accessories
BLACK BOX HEAD-END – REQUIRED DETAILED SPECIFICATIONS 8-Nov
BLACK BOX AND BOWLING: ICT & SECURITY NETWORK HEADEND - 21-Nov
REQUIRED CONFIRMATION
Material Sample For Emergency Lighting Central Battery System 6-Dec
Material Submittal for Gate Barrier & Road Blocker System
12
Action
Date Status Remarks
Closed
Closed
Closed
Closed
12-Oct Closed
Closed
12-Nov Closed
12-Nov Closed
11-Jan Closed
6-Nov Closed
11-Nov Closed
11-Jan Closed
11-Nov Closed Sent to Ellisdon
18-Nov Closed
20-Nov
Closed
20-Nov Closed
Closed
30-Nov Closed
30-Nov Closed
3-Dec Closed
Closed
Closed
Closed