You are on page 1of 1

KIIMAKIU SECONDARY SCHOOL DORM

15/12/2020

NO. ITEM QUANTITY PRICE AMOUNT


A VARANDA 9ft + 22ft + 9ft
1. Timber (6” by 1”) 300ft
2. Probs 15 pieces
3. Nails 3” 5kg
4. Binding 20 kg
5. D8 6 pieces
B TOWER TANK
1. Timber 380 ft
2. Timber 150 ft
3. Probs 40 pieces
4. Nails 8kg
5. Nails 4kg
6. Hoof iron 2 rolls
7. Machine cut 1490 pieces
8. Cement 50 Kg 200
9. Sand 30 tonnes
10. Aggregate (Ballast) 7 tonnes
C ROOF
1. Square tube 2” by 2” (16 gauge) (long 40 pieces
20 length)
2. Square tube 2” by 2” 16 gauge (20 75 pieces
length)
3. Parlini 2”×2” 16 gauge 85 pieces
D IRON SHEET
1. Long Sides 80 pieces
2. Small sides 30 pieces
3. Ridges 40 pieces
4. Plain Sheet (Valley) 8M
5. Roofing Bolts – Screw bolts - 50kg
6. Roofing Caps (Rubber)
7. Welding rod 100 Kg
8. Cutting Disk (Abra) 3 parcel
9. Grinding disk (Abra) 2 parcel
E Undercoat paint (metal gray 4L by 5Can) 20 L
F Turpentine 10L
G Brass (painting) 6” 5 No
H Brass (Painting) 3” 5 No
I Hacksaw Blind 5No
J Plain sheet 8M
K Facial board (8” by 1”) 300 ft

You might also like