You are on page 1of 8

Project:___________

Date:
Page: ___ of ___
Section:__________ Таkeoff by:
Details
Item Description Areas m2
Length Width Height Thickness Diameter Count
Excavation 4.8 4.1 0.35
25cm thick basaltic hardcore 4.8 4.1 0.25

1000451172062 Zeytuna
Volume
m3
6.89
4.92
Project: Moyale Water Supply Project
Date:
Page: ___ of ___
Section: Generator House Таkeoff by:
Details
Item Description
Length Width Height Thickness Diameter Count
apply cement Screed 7.0 4.0
Volume
Areas m2
m3
28.00
Project: Moyale Water Supply Project
Date:
Page: 1 of 1
Section: Pump House Takeoff Таkeoff by: Abiyot Demissie
Details
Item Description
Length Width Height Thickness Diameter Count
apply cement Screed 6.6 4.6
Volume
Areas m2
m3
30.36
Project: Moyale Water Supply Project
Date:
Page: 1 of 1
Section: 1000m3 Takeoff Таkeoff by: Abiyot Demissie
Details
Item Description Length Width Thickness Diameter
Height (m) Count
(m) (m) (m) (m)
apply three coat of plastering to 6.50 16.6
external wall, internal and roof
cement
cover Screed to base slab, roof 16.0 2.0
pavement around the reservoir 1.0 18.6
Volume
Areas m2
m3

881.43
402.12
58.44

You might also like