You are on page 1of 6

Job No Sheet No Rev

1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date26-Apr-21 Chd

Client File 6L_all_beam_30_APR_64 Date/Time 30-Apr-2021 14:10

H-300x300x10x15, Service load


Beam End Force Summary
The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (MTon-m) (MTon-m) (MTon-m)
Max Fx 399 23 4:DL+OP 6319.07 -2612.60 72.26 0.00 0.10 -0.56
Min Fx 189 209 4:DL+OP -666.16 -2308.57 -103.81 -0.00 0.45 -8.08
Max Fy 101 124 4:DL+OP -207.57 5667.36 589.09 -0.01 -0.49 1.68
Min Fy 406 408 4:DL+OP 164.58 -15.3E+3 -12E+3 0.04 1.30 0.34
Max Fz 400 222 4:DL+OP 166.10 -8129.41 4614.82 0.01 0.34 0.73
Min Fz 406 198 4:DL+OP 164.58 -15.3E+3 -12E+3 0.04 2.50 -1.18
Max Mx 357 368 4:DL+OP 1125.68 -3056.81 518.89 0.91 -0.38 -4.02
Min Mx 193 220 4:DL+OP -3.88 2488.26 -593.97 -0.27 0.26 1.12
Max My 406 198 4:DL+OP 164.58 -15.3E+3 -12E+3 0.04 2.50 -1.18
Min My 405 407 4:DL+OP 144.18 -4786.37 -749.97 -0.00 -1.79 2.10
Max Mz 403 404 4:DL+OP 1409.35 -9670.21 838.79 -0.25 0.30 3.99
Min Mz 221 239 4:DL+OP 433.94 -4013.85 52.23 0.00 -0.09 -13.36

From table
1). the maximum
vertical shear force
(magnitude
force) )at the end of
pipe is Fy
2). the maximum
tension force at the
end of beam is Fx
( negative is tension
force , positive id
compression
force ).
3). the maximum
horizontal shear
force (magnitude
force) )at the end of
pipe is Fz

Print Time/Date: 30/04/2021 14:11 STAAD.Pro CONNECT Edition 22.04.00.40 Print Run 1 of 1
Job No Sheet No Rev
1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date26-Apr-21 Chd

Client File 6L_all_beam_30_APR_64 Date/Time 30-Apr-2021 14:10

Beam End Force SummaryH-300x300x10x15, Factored load


The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (MTon-m) (MTon-m) (MTon-m)
Max Fx 399 23 5:1.2DL+1.6LL 9842.11 -4114.69 115.59 0.01 0.17 -0.88
Min Fx 189 209 5:1.2DL+1.6LL -1065.66 -3506.60 -172.68 -0.00 0.72 -12.10
Max Fy 101 124 5:1.2DL+1.6LL -332.11 8716.00 942.53 -0.02 -0.79 2.57
Min Fy 406 408 5:1.2DL+1.6LL 249.80 -23.3E+3 -18.7E+3 0.06 2.13 0.28
Max Fz 400 222 5:1.2DL+1.6LL 261.45 -12.3E+3 7573.68 0.01 0.54 1.05
Min Fz 406 198 5:1.2DL+1.6LL 249.80 -23.3E+3 -18.7E+3 0.06 4.00 -2.05
Max Mx 357 368 5:1.2DL+1.6LL 1751.93 -4738.50 830.25 1.45 -0.61 -6.20
Min Mx 193 220 5:1.2DL+1.6LL -5.87 3804.27 -950.44 -0.44 0.41 1.63
Max My 406 198 5:1.2DL+1.6LL 249.80 -23.3E+3 -18.7E+3 0.06 4.00 -2.05
Min My 405 407 5:1.2DL+1.6LL 265.48 -7344.49 -1199.54 -0.01 -2.87 3.32
Max Mz 403 404 5:1.2DL+1.6LL 2207.31 -14.7E+3 1343.94 -0.37 0.47 6.13
Min Mz 221 239 5:1.2DL+1.6LL 694.31 -6148.99 86.73 0.00 -0.15 -20.31

From table
1). the maximum
vertical shear force
(magnitude
force) )at the end of
pipe is Fy
2). the maximum
tension force at the
end of beam is Fx
( negative is tension
force , positive id
compression
force ).
3). the maximum
horizontal shear
force (magnitude
force) )at the end of
pipe is Fz

Print Time/Date: 30/04/2021 14:12 STAAD.Pro CONNECT Edition 22.04.00.40 Print Run 1 of 1
Job No Sheet No Rev
1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date26-Apr-21 Chd

Client File 6L_all_beam_30_APR_64 Date/Time 30-Apr-2021 14:10

Beam End Force Summary H-400x400x13x21mm , Service load


The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (MTon-m) (MTon-m) (MTon-m)
Max Fx 301 24 4:DL+OP 27.1E+3 -625.38 2145.95 -0.05 -0.24 0.11
Min Fx 208 215 4:DL+OP -6102.40 -28E+3 4379.85 0.03 4.58 3.26
Max Fy 80 94 4:DL+OP 1894.91 16.1E+3 2444.65 0 -3.40 1.81
Min Fy 402 403 4:DL+OP -231.71 -29.2E+3 -2061.14 -0.68 -3.05 20.27
Max Fz 238 265 4:DL+OP 3616.93 -19.2E+3 4622.83 -0 6.14 2.92
Min Fz 265 288 4:DL+OP -6100.63 -24.6E+3 -3997.34 0.00 -2.78 1.56
Max Mx 401 283 4:DL+OP -1050.08 -15.2E+3 2042.44 0.55 0.84 16.92
Min Mx 254 281 4:DL+OP 4473.36 -12.7E+3 -1507.49 -0.82 -4.11 1.75
Max My 238 265 4:DL+OP 3616.93 -19.2E+3 4622.83 -0 6.14 2.92
Min My 254 281 4:DL+OP 4473.36 -12.7E+3 -1507.49 -0.82 -4.11 1.75
Max Mz 402 403 4:DL+OP -231.71 -29.2E+3 -2061.14 -0.68 -3.05 20.27
Min Mz 22 24 4:DL+OP 832.43 -8914.41 -665.20 -0.01 0.23 -57.49

From table
1). the maximum
vertical shear force
(magnitude
force) )at the end of
pipe is Fy
2). the maximum
tension force at the
end of beam is Fx
( negative is tension
force , positive id
compression
force ).
3). the maximum
horizontal shear
force (magnitude
force) )at the end of
pipe is Fz

Print Time/Date: 30/04/2021 14:12 STAAD.Pro CONNECT Edition 22.04.00.40 Print Run 1 of 1
Job No Sheet No Rev
1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date26-Apr-21 Chd

Client File 6L_all_beam_30_APR_64 Date/Time 30-Apr-2021 14:10

Beam End Force Summary H-400x400x13x21mm , Factored load


The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (MTon-m) (MTon-m) (MTon-m)
Max Fx 301 24 5:1.2DL+1.6LL 42.6E+3 -980.64 3433.43 -0.08 -0.38 0.17
Min Fx 208 215 5:1.2DL+1.6LL -9769.90 -44.5E+3 7007.77 0.05 7.33 5.16
Max Fy 80 94 5:1.2DL+1.6LL 3031.85 25.6E+3 3911.44 0 -5.45 2.86
Min Fy 402 403 5:1.2DL+1.6LL -396.90 -46E+3 -3301.12 -1.05 -4.82 32.02
Max Fz 238 265 5:1.2DL+1.6LL 5787.09 -30.5E+3 7396.52 -0 9.82 4.63
Min Fz 265 288 5:1.2DL+1.6LL -9761.00 -39.1E+3 -6395.75 0.00 -4.45 2.46
Max Mx 401 283 5:1.2DL+1.6LL -1680.42 -23.8E+3 3063.66 0.86 1.35 26.72
Min Mx 254 281 5:1.2DL+1.6LL 6743.57 -19.9E+3 -2413.86 -1.31 -6.58 2.71
Max My 238 265 5:1.2DL+1.6LL 5787.09 -30.5E+3 7396.52 -0 9.82 4.63
Min My 254 281 5:1.2DL+1.6LL 6743.57 -19.9E+3 -2413.86 -1.31 -6.58 2.71
Max Mz 402 403 5:1.2DL+1.6LL -396.90 -46E+3 -3301.12 -1.05 -4.82 32.02
Min Mz 22 24 5:1.2DL+1.6LL 1331.85 -14E+3 -1056.34 -0.01 0.34 -90.14

From table
1). the maximum
vertical shear force
(magnitude
force) )at the end of
pipe is Fy
2). the maximum
tension force at the
end of beam is Fx
( negative is tension
force , positive id
compression
force ).
3). the maximum
horizontal shear
force (magnitude
force) )at the end of
pipe is Fz

Print Time/Date: 30/04/2021 14:13 STAAD.Pro CONNECT Edition 22.04.00.40 Print Run 1 of 1
Job No Sheet No Rev
1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date26-Apr-21 Chd

Client File 6L_all_beam_30_APR_64 Date/Time 30-Apr-2021 14:10

Beam End Force Summary H-400x400x13x21_added plate T&B,


Service
The signs of the forces at end B of each beam have been load
reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (MTon-m) (MTon-m) (MTon-m)
Max Fx 154 174 4:DL+OP 10.2E+3 -25E+3 1413.91 0.04 3.25 4.95
Min Fx 70 70 4:DL+OP -2578.84 -37.8E+3 2611.28 0.041302 0.96 8.02
Max Fy 132 150 4:DL+OP 327.15 33.2E+3 301.31 0 0.21 -17.22
Min Fy 132 149 4:DL+OP -988.96 -39E+3 -671.77 -0 -1.07 4.94
Max Fz 229 254 4:DL+OP 1170.35 -27.1E+3 6181.26 -0 8.71 3.95
Min Fz 169 189 4:DL+OP 2547.78 -26.5E+3 -7967.66 -0 -10.35 3.83
Max Mx 70 59 4:DL+OP -531.36 -4775.04 541.76 0.041302 1.39 -73.66
Min Mx 49 58 4:DL+OP 4320.47 29.2E+3 -2273.86 -0.03 2.67 6.62
Max My 229 254 4:DL+OP 1170.35 -27.1E+3 6181.26 -0 8.71 3.95
Min My 169 189 4:DL+OP 2547.78 -26.5E+3 -7967.66 -0 -10.35 3.83
Max Mz 70 70 4:DL+OP -2578.84 -37.8E+3 2611.28 0.041302 0.96 8.02
Min Mz 49 59 4:DL+OP -382.17 2649.23 2817.92 -0.03 1.83 -73.66

From table
1). the maximum
vertical shear force
(magnitude
force) )at the end of
pipe is Fy
2). the maximum
tension force at the
end of beam is Fx
( negative is tension
force , positive id
compression
force ).
3). the maximum
horizontal shear
force (magnitude
force) )at the end of
pipe is Fz

Print Time/Date: 30/04/2021 14:14 STAAD.Pro CONNECT Edition 22.04.00.40 Print Run 1 of 1
Job No Sheet No Rev
1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date26-Apr-21 Chd

Client File 6L_all_beam_30_APR_64 Date/Time 30-Apr-2021 14:10

H-400x400x13x21mm_added plate T&B


Beam End Force Summary flange , Factored load
The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (MTon-m) (MTon-m) (MTon-m)
Max Fx 154 174 5:1.2DL+1.6LL 16.3E+3 -39.5E+3 2266.45 0.06 5.22 7.84
Min Fx 70 70 5:1.2DL+1.6LL -4126.14 -59.8E+3 4178.05 0.06 1.54 12.69
Max Fy 132 150 5:1.2DL+1.6LL 523.44 52.9E+3 482.10 0 0.34 -27.33
Min Fy 132 149 5:1.2DL+1.6LL -1582.33 -62.2E+3 -1074.83 -0 -1.71 7.88
Max Fz 229 254 5:1.2DL+1.6LL 1872.56 -43E+3 9890.01 -0 13.94 6.27
Min Fz 169 189 5:1.2DL+1.6LL 4076.44 -42.1E+3 -12.7E+3 -0 -16.56 6.07
Max Mx 70 59 5:1.2DL+1.6LL -850.17 -7420.76 866.81 0.06 2.23 -116.44
Min Mx 49 58 5:1.2DL+1.6LL 6912.75 46.2E+3 -3638.18 -0.05 4.27 10.48
Max My 229 254 5:1.2DL+1.6LL 1872.56 -43E+3 9890.01 -0 13.94 6.27
Min My 169 189 5:1.2DL+1.6LL 4076.44 -42.1E+3 -12.7E+3 -0 -16.56 6.07
Max Mz 70 70 5:1.2DL+1.6LL -4126.14 -59.8E+3 4178.05 0.06 1.54 12.69
Min Mz 49 59 5:1.2DL+1.6LL -611.47 4148.37 4508.67 -0.05 2.92 -116.44

From table
1). the maximum
vertical shear force
(magnitude
force) )at the end of
pipe is Fy
2). the maximum
tension force at the
end of beam is Fx
( negative is tension
force , positive id
compression
force ).
3). the maximum
horizontal shear
force (magnitude
force) )at the end of
pipe is Fz

Print Time/Date: 30/04/2021 14:15 STAAD.Pro CONNECT Edition 22.04.00.40 Print Run 1 of 1