DPPR Khaperkheda Thermal Power 29.02.

2024
Gen Target For Month(MUs) : 535.960 Net Export For Day (MUs) : 27.078
Particulars UNIT01 UNIT02 UNIT03 UNIT04 STAGEI UNIT05 STAGEIII STATION
Gross Gen Mus Day 4.125 4.585 4.098 4.454 17.262 11.911 11.911 29.173
Month 113.485 66.755 102.289 110.647 393.176 324.259 324.259 717.435
FY 944.525 777.447 1212.054 1249.899 4183.925 3256.875 3256.875 7440.800
Aux Cons Mus Day 0.350 0.371 0.410 0.468 1.599 0.496 0.496 2.095
Month 10.799 6.564 10.994 10.776 39.133 18.752 18.752 57.885
FY 102.731 97.566 133.617 132.008 465.922 207.201 207.201 673.123
Aux Cons % Day 8.485 8.092 10.005 10.507 9.263 4.164 4.164 7.181
Month 9.516 9.833 10.748 9.739 9.953 5.783 5.783 8.068
FY 10.876 12.550 11.024 10.561 11.136 6.362 6.362 9.046
Target Mus Monthly 61.954 61.954 61.954 61.954 247.816 288.144 288.144 535.960
Bal.Monthly 51.531- 4.801- 40.335- 48.693- 145.360- 36.115- 36.115- 181.475-
CEA -FY 822.942 822.942 822.942 822.942 3291.768 2999.600 2999.600 6291.368
Bal.FY 121.583- 45.495 389.112- 426.957- 892.157- 257.275- 257.275- 1149.432-
Loss of gen Over Haul
for day Mus External Factor 0.408 0.341 0.301 0.264 1.314 1.314
Partial & 1)Low Syst Demand 0.037 0.037 0.037
Tripping 2)Water Shortage
3)Coal Shortage
4)Poor Coal Qualit 0.408 0.341 0.264 0.264 1.277 1.277
5)Wet Coal Prob
6)System Prob
7)Tolling of Coal
O& M factor 0.507 0.114 0.641 0.322 1.584 0.089 0.089 1.673
Total Loss Total Loss 0.915 0.455 0.942 0.586 2.898 0.089 0.089 2.987
Prog LDBD LDBD Monthly 2.896 0.194 2.178 3.353 8.621 4.408 4.408 13.029
Loss LDBD Yearly 33.915 5.103 43.640 65.070 147.728 78.228 78.228 225.956
PLF % Daily 81.845 90.972 81.310 88.373 85.625 99.258 99.258 90.712
Montly 77.644 45.673 69.984 75.703 67.251 93.178 93.178 76.925
FY 55.942 46.046 71.787 74.029 61.951 81.017 81.017 69.065
PLF% (MERC) Daily
Upto RRD Monthly
FY 55.387 44.927 70.437 73.111 60.927 80.582 80.582 68.470
AVF% (MERC) Daily 85.034 90.720 82.315 89.703 86.943 100 100 91.938
Upto RRD Monthly 80.095 45.742 71.492 78.536 68.966 94.657 94.657 78.795
FY 57.792 45.460 74.509 77.890 63.913 82.820 82.820 71.146
AVF% Daily 100 100 100 100 100 100 100 100
Monthly 100 55.498 87.893 89.488 83.220 99.236 99.236 91.228
FY 87.428 87.245 94.437 95.052 91.041 93.539 93.539 92.290
Sp.Oil Cons Daily
(ml/kwh) Monthly 0.749 3.475 1.290 0.651 1.325 0.316 0.316 0.869
FY 3.042 6.090 1.850 1.482 2.797 0.342 0.342 1.722
Ash Eavcuation Bottom Ash-Hrs 2:30 01:30 04:20 5:20
Fly Ash-Hrs 12:05 07:20 24:00
Unburnt in Fly Ash%
Bottom Ash%
Aux N/A Ash Series
Coal Mills A01,B06,C09,D01, D04,
E01,
Other HT Aux
CHP Aux
Coal Bunker level 70 65 75 70
Coal CV 2 Days Back
Coal Cons (MT)
Consumption LDO(KL)
FO(KL)
CO2 Cylndr (Nos)
H2 Cylndr (Nos) 9 6 5 4 24 8 8 32
N2 Cylndr
NH3 Cylndr (Kg) 400 200 600 600
DM Water (Cu.M) 510 516 1026 365 365 1391
SW/FW/PT (Cu.M) 8722 9695 18417 18417
Ash Water (Cu.M)
Receipts CO2 Cylyndr (Nos)
H2 Cylndr (Nos)
N2 Cylndr
NH3 Cylndr
Closing Stock CO2 Cylndr (Nos) 10 9 30 30 79 79
H2 Cylndr (Nos) 148 147 162 171 628 628
N2 Cylndr
NH3 Cylndr
Coal Receipt Opening Daily Monthly Prorata Realn (%) Wagons Nos. Closng Bal
(MT) Balance Receipt Receipt Linkage Op.Bal. Recp Unld Closing Bal Comm+Crush
Rail/RDRL/RDRL(W) 0.000 430787.780 884850 48.685 176 0
Ropeway 0.000 0.000 14500 0.000 0 0
Road 0.000 0.000 174000 0.000 0 0
UTS 0.000 0.000 0 0.000 0 0
Total 702367.801 0.000 430787.780 1073350 40.135 176 0 702367.801
Receipt Closing Stock
OIL/GAS Item STAGE-I STAGE-II STAGE-III STAGE-IV STAGE-I STAGE-II STAGE-III STAGE-IV
F0 0.000 0.000 0.000 0.000 3972.772 0.000 2077.230 0.000
LD0 0.000 0.000 0.000 0.000 1235.080 0.000 1273.360 0.000
Dam Level(Ft/M Current Year Last Year Drop in 24 Hrs
Water Recovery For ETP I 0.000 For ETP II 0.000 For ETP III 0.000
(Cu.M) Ash Bund 0.000 Waste Water Phase I 0.000 Waste water Phase II 0.000
REMARK 1--
REMARK 2-