Bus A Bus B
300.0 MW 300.0 MW
199.6 MW 400.4 MW
AGC ON AGC ON
15.00 15.00
14.00 14.00
13.00 13.00
12.00 12.00
0 175 350 525 700 0 350 700 1050 1400
G
Generator
t Power
P (MW) T t l Area
Total A Generation
G ti (MW)
40.0
20.0
0.0
60 100 140 180
300.0 MW 300.0 MW
197.0 MW 403.0 MW
AGC ON AGC ON
380.0 MW 300.0 MW
260.9 MW 419.1 MW
AGC ON AGC ON
slack
0 MW 10 $/MWh
A
180 MW
120%
A
MVA MVA
0 MW
60 MW A
120 MW
A
Total Cost 120%
1800 $/h
MVA
MVA Line from Bus 1 to Bus
Bus 3 10 $/MWh 3 is over-loaded; all
180 MW
buses have the same
g
marginal cost or LMP
0 MW
($10/MWh)
©2011 PowerWorld Corporation Market Analysis Quick Start-15
Three Bus Example
p
• All buses are connected through 0.1 pu
reactance transmission lines (no MW losses),
each with a 100 MVA limit
• The generator marginal costs are
– Bus 1: 10 $ / MWhr; Range = 0 to 400 MW
– Bus 2: 12 $ / MWhr; Range = 0 to 400 MW
– Bus 3: 20 $ / MWhr; Range = 0 to 400 MW
• A single 180 MW load is at bus 3
• Ignoring transmission limits, all load is served
by the least-cost generator, at bus 1
©2011 PowerWorld Corporation Market Analysis Quick Start-16
Three Bus Example
p
• To enforce transmission line limits:
– From the OPF ribbon group, Select OPF Options and
Results to view the main options dialog
– Select Constraint Options Tab
– Clear the checkbox
Disable
Line/Transformer
i / f
MVA Limit
Enforcement
– Click Solve LP OPF
slack
60 MW 12 $/MWh
A
120 MW
A
80% 100%
MVA MVA
0 MW
80 MW A
100 MW
A
Total Cost 80%
MVA
100% OPF redispatches
MVA
1920 $/h
14 $/MWh
to remove violation.
Bus 3
Bus marginal
180 MW
costs are now
0 MW different.
©2011 PowerWorld Corporation Market Analysis Quick Start-18
Why
y is bus 3 LMP $14 /MWh?
• The least-cost source of marginal
g ppower at buses 1
and 2 is the local generator. Each LMP matches the
marginal cost of the local generator.
• However, the generator at bus 3 has a marginal cost
of $20, and no generator has a marginal cost of $14.
• Power flow in the network distributes inversely to
line impedance,
impedance and all line impedances are equal.
equal
– For bus 1 to supply 1 MW to bus 3, 2/3 MW would
flow on direct path from 1 to 3, while 1/3 MW would
“loop
loop around
around” from 1 to 2 to 3.
3
– Likewise, for bus 2 to supply 1 MW to bus 3, 2/3 MW
would go directly from 2 to 3, while 1/3 MW would go
from 2 to 1 to 3.
3
slack
2 MW 0 $/MWh
-1 MW
A
A
MVA
MVA
0 MW
1 MW
A A
0 MW
One additional MW
Total Cost
14 $/h
MVA MVA
of load at bus 3
Bus 3 0 $/MWh raised total cost by
1 MW
14 $/hr, as G2 went
up by 2 MW and G1
0 MW
went down by 1MW
©2011 PowerWorld Corporation Market Analysis Quick Start-23
Marginal Cost of Enforcing
C t i t
Constraints
• Similarly to the bus marginal cost,
cost you can
also calculate the marginal cost of enforcing
a line constraint
• For a transmission line, this represents the
amount of system savings which could be
achieved if the MVA rating was increased
by 11.0
0 MVA.
MVA
slack
59 MW 12 $/MWh
A
122 MW
A
80% 100%
MVA MVA
0 MW
80 MW A
101 MW
A
Total Cost 80% 100%
1929 $/h
MVA
MVA Limit 1-3=101
Bus 3 14 $/MWh MVA; Total Cost
181 MW decreases $6
0 MW
Increasingg output
p of Gen 2 byy 1 MW decreases flow on
the binding constraint (Line 1-3) by 1/3 MW. The
values assume marginal power is absorbed at the slack.
©2011 PowerWorld Corporation Market Analysis Quick Start-28
Both lines into Bus 3 Congested
g
• For bus 3 load above 200 MWMW, the marginal
load must be supplied locally
• Restore line 1-3
1 3 limit to 100 MVA
• Change bus 3 load to 250 MW
slack
100 MW 12 $/MWh
A
100 MW
A
100% 100%
MVA MVA
0 MW
100 MW A A
100 MW
Total Cost 100% 100%
3202 $/h MVA MVA LMP at bus 3 is
Bus 3 20 $/MWh set by the cost of
250 MW
the generator at
bus 3 ($20)
50 MW
slack
47 MW 12 $/MWh
A
203 MW
A
100% 152%
MVA MVA
0 MW
99 MW A
151 MW
Total Cost
A
i
imports off 2.62
2 62 GW
40.0
20.0
0.0
60 100 140 180
The constrained
lines are shown
with the large
red pie charts
©2011 PowerWorld Corporation Market Analysis Quick Start-51
System-Wide Super Area:
B M
Bus Marginal
i l Price
P i Contour
C t
Note
N t the
th load
l d pocket
k t created
t d andd difference
diff in
i LMPs
LMP based
b d on
operation of a single 85 MW generator
©2011 PowerWorld Corporation Market Analysis Quick Start-53
Individual Power Pools:
B Marginal
Bus M i l Price
Pi C Contour
t
Total
T t l operating
ti costt = $4,494,170
$4 494 170 / hr,
h an increase
i off $48,170
$48 170 / hr
h
Fixed interchange yields “seams” between power pools
©2011 PowerWorld Corporation Market Analysis Quick Start-54