You are on page 1of 1

PROJECT NAME : Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Contruction of Puerto Princesa Northern Tourism Mega-Highway, Barangay

Maruyugon to Barangay Buenavista


PROJECT ID : 23EO0094
LOCATION : Puerto Princesa City, Palawan

STRAIGHT LINE DIAGRAM

STA.
0+060
DOUBLE
BARREL
1.220m. Ø STA. 0+846
STA. 0+611.6 STA. 0+641.6 STA. 0+806
24pcs. END OF
BEG. OF END OF BEG. OF
RCPC STONE
STONE STONE STONE
MASONRY MASONRY MASONRY MASONRY
30.00 40.00 32.50
BEG. OF PROJECT
STA. 0+000

33.00 40.00 70.00 31.00 27.00


STA. 0+121.90 STA. 0+154.90 STA. 0+405 STA. 0+445 STA. 0+501 STA. 0+571 STA. 0+752.9 STA. 0+783.9 STA. 0+954 STA. 0+981
BEG. OF END OF BEG. OF END OF BEG. OF END OF BEG. OF END OF BEG. OF END OF
CATCHWALL CATCHWALL STONE STONE STONE STONE STONE STONE CATCHWALL CATCHWALL
MASONRY MASONRY MASONRY MASONRY MASONRY MASONRY

000 + 000 20 40 60 80 000 + 100 20 40 60 80 000 + 200 20 40 60 80 000 + 300 20 40 60 80 000 + 400 20 40 60 80 000 + 500 20 40 60 80 000 + 600 20 40 60 80 000 + 700 20 40 60 80 000 + 800 20 40 60 80 000 + 900 20 40 60 80 001 + 000

STA. STA. STA.


1+083.20 1+255 0+060
SINGLE SINGLE DOUBLE
BARREL BARREL BARREL
0.910m. Ø 0.910m. Ø 1.220m. Ø
16pcs. 16pcs. 34pcs.
RCPC RCPC RCPC

40.00 10.70
5.00
15.20

6.00

001 + 000 20 40 60 80 001 + 100 20 40 60 80 001 + 200 20 40 60 80 001 + 300 20 40 60 80 001 + 400 20 40 60 80 001 + 500 20 40 60 80 001 + 600 20 40 60 80 001 + 700 20 40 60 80 001 + 800 20 40 60 80 001 + 900 20 40 60 80 002 + 000

LEGEND :

CARRIAGEWAY
END OF PROJECT

STONE MASONRY
STA. 2+140

SINGLE BARREL 0.910m Ø RCPC


DOUBLE BARREL 0.910m Ø RCPC

CATCHWALL

GROUTED RIPRAP

RETAINING WALL
002 + 000 20 40 60 80 002 + 100 20 40