You are on page 1of 13

GAMBAR KERJA Maret 2017

MASJID SEDERHANA UKURAN 10X10

design by

ARGAJOGJA
Architecture, Interior, Engineering

copyright 2020 @ argajogja.com


1 2 3 4 5 PROJECT
30 350 300 350 200

PEMBANGUNAN
MASJID 10X10

A
TERAS

200
-0.05

K1 K2 K2 K1
OWNER

B
KP KP KP KP KP KP

KP
350

350
KP
KP

B
K2

C
KP

ARCHITECT
300

300
MASJID
TERAS
KP -0.05
-0.25

D
K2

KP
350

350
KP
KP ARGAJOGJA
Architecture, Interior, Engineering

KP KP KP KP KP KP

E
NOTE
K1 K2 K2 K1

200
TERAS
-0.05

F
A

30 350 300 350 200


1 2 3 4 5
RENCANA DENAH
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10

OWNER

LUBANG ANGIN-ANGIN
dan teralis besi

ARCHITECT

ARGAJOGJA
Architecture, Interior, Engineering

NOTE

TAMPAK DEPAN
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10

OWNER

LUBANG ANGIN-ANGIN
dan teralis besi

ARCHITECT

ARGAJOGJA
Architecture, Interior, Engineering

NOTE

TAMPAK KANAN
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10

OWNER

LUBANG ANGIN-ANGIN
dan teralis besi

ARCHITECT

ARGAJOGJA
Architecture, Interior, Engineering

NOTE

TAMPAK KIRI
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10

OWNER

LUBANG ANGIN-ANGIN
dan teralis besi

ARCHITECT

ARGAJOGJA
Architecture, Interior, Engineering

NOTE

TAMPAK BELAKANG
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT
1 2 3 4 5
30 350 300 350 200
PEMBANGUNAN
MASJID 10X10

A
200
OWNER

B
ATAP GENTENG
STRUKTUR BETON DAN
KAYU
ATAP ZINCALUM

350
350

RANGKA BAJA RINGAN

C
ARCHITECT

300
300

D
ARGAJOGJA

350
350

Architecture, Interior, Engineering

NOTE

E
200
F

30 350 300 350 200


1 2 3 4 5
RENCANA ATAP
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10

KUDA-KUDA KAYU
+9.285 OWNER

LUBANG VENTILASI
BISA DENGAN
TERALIS B2 GYPSUM B2 +7.615
ATAU JALUSI

PLAFON DIATAS
USUK B1 B1
+5.95
GORDING 8/14
USUK 5/7
RENG 2/3
GENTENG B1 B1 B1 B1

ARCHITECT
LUBANG VENTILASI
+4.00
ATAP ZINCALUM
B1 B1
BAJA RINGAN +3.50

RB RB
+2.725

BAJA RINGAN

0.000
ARGAJOGJA
Architecture, Interior, Engineering

-0.500

NOTE
-1.600

200 1000 200


F E B A

POTONGAN A
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10
KUDA-KUDA KAYU
+9.285

LUBANG VENTILASI OWNER


BISA DENGAN GYPSUM
TERALIS B2 B2 +7.615
ATAU JALUSI

PLAFON DIATAS
USUK B1 B1
+5.95
GORDING 8/14
USUK 5/7
RENG 2/3
GENTENG B1 B1 B1 B1

LUBANG VENTILASI
+4.00
B1 B1
+3.50

RB RB
ARCHITECT
+2.725

0.000

ARGAJOGJA
Architecture, Interior, Engineering

-1.600

1000 200 NOTE


1 4 5

POTONGAN B
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT
1 2 3 4
350 300 350 PEMBANGUNAN
MASJID 10X10

F1 KP KP F1 F1 F1
KP KP

B
OWNER

KP
350

350
KP
KP
F1 F1

C
KP
300

300
ARCHITECT
KP

D
F1 F1
PONDASI BATU KP
350

350
KP KALI
SLOOF KP
ARGAJOGJA
Architecture, Interior, Engineering
KP KP KP KP

E
F1 F1 F1 F1
NOTE

350 300 350


1 2 3 4

RENCANA PONDASI
SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT
1 2 3 4
350 300 350 PEMBANGUNAN
MASJID 10X10

K1 K2 K2 K1

B
B1 B1 B1

OWNER
350

350
B1 B1 B1 B1 B1
B1

K2 K2

C
B1 B1 B1
300

300
B1
B1 B1 B1
ARCHITECT

D
K2 B1 B1 B1
K2

B1
350

350
B1
B1 B1 B1 B1

ARGAJOGJA
Architecture, Interior, Engineering

E
B1 B1 B1

K1 K2 K2 K1 NOTE

350 300 350


1 2 3 4

RENCANA KOLOM BALOK


SKALA 1:125

copyright 2020 @ argajogja.com


PROJECT

PEMBANGUNAN
MASJID 10X10

NOTASI K-1 K-2 K-3 KP

OWNER

D13 - 150
GAMBAR

400

1000
400

200

150
200 150
400
300

DIMENSI 400 X 400 300 X 400 200 X 200 150 X150


D13 - 150
TULANGAN
SENGKANG 1000

400
300

300
ARCHITECT
NOTASI SL B1 B2 BR Soof SL

TUMPUAN LAPANGAN TUMPUAN LAPANGAN Sloof SL

150
Sloof S-1

200
5D13 3D13
( 150 x 200)

200
3D13 2D13
GAMBAR
300

300

Fondasi pas. batu kali


200

200
2P8 2P8
400

400

2D13 3D13
300
150 3D13 5D13 150
200 200
200 200

700
ARGAJOGJA

1600
DIMENSI 150 X 200 200 X 400 200 X 400 200 X 300 200 X 300 150 X 200
TULANGAN ATAS 5D13 3 D 13 3 D 13 2D13
TULANGAN TENGAH 500
Architecture, Interior, Engineering
TULANGAN BAWAH 3 D 13 5D13 2D13 3 D 13
SENGKANG

100
NOTE

200
1000

PONDASI FOOTPLAT
ASUMSI
TANAH KERAS
PADA KEDALAMAN
DETAIL PENULANGAN 1,6 METER
SKALA 1:150

copyright 2020 @ argajogja.com


PROJECT
1 2 3 4
350 300 350
PEMBANGUNAN
MASJID 10X10

B
LETAK
LAMPU
OWNER
INSTALASI
DIDALAM
COR
350

350
BALOK

C
LETAK LETAK
LAMPU LAMPU
INSTALASI INSTALASI
300

300
DIDALAM DIDALAM
COR COR
BALOK BALOK

ARCHITECT

D
350

350
LETAK
LAMPU
INSTALASI
DIDALAM

ARGAJOGJA
COR
BALOK

Architecture, Interior, Engineering

E
B1

SIMBOL KETERANGAN
NOTE
= Titik Lampu

= SAKLAR ganda/ SERI


350 300 350 1.5 mtr dari lantai
= SAKLAR tunggal
1 2 3 4 1.5 mtr dari lantai
= OUTLET STOP KONTAK
0.3 mtr dari lantai

DENAH ELEKTRIKAL
SKALA 1:125

copyright 2020 @ argajogja.com

You might also like