Professional Documents
Culture Documents
4. Distinguish why PM’s & PdM's tasks fail and how to ensure your
maintenance tasks are effective
8. Identify assets and build the business case for performing and
implementing RCM
DOUG PLUCKNETTE
ONLINE LECTURES ELECTRONIC PACKAGE REAL LIFE CASE RELIABILITY SOLUTIONS INC.
OF LECTURES STUDIES
PRESIDENT AND FOUNDER
Over 40 years of experience in all aspects of Maintenance Management, having trained more than 20,000 managers, engineers, tradespeople and supervisors from
over 3,000 organizations in 20+ countries. Doug has vast experience in a wide variety of industry sector including mining, utilities & power generation, oil & gas,
petrochemical, manufacturing, primary metal, auto, food & beverage, military, government etc. He was also a frequent speaker at maintenance and engineering
conferences and author of Reliability Centered Maintenance Using RCM Blitz and Clean, Green and Reliable and other 100+ articles.
RCM Blitz™ differs from other Reliability Centered Maintenance Services or methodologies as it was not only
designed to address equipment reliability, but also: health factors, safety concerns, and environmental incidents
and reduce accidents. The RCM Blitz™ methodology was designed as a response to manufacturing companies that
found traditional RCM too expensive and time consuming. The RCM Blitz™ methodology begins with the critical
manufacturing assets only resulting in immediate return.
Recognized as one of the top RCM Methodologies in the industry, RCM Blitz™ was developed by Doug Plucknette in
1997 when he recognized the need to develop a RCM methodology that was not only quick and efficient, but focused
on improving manufacturing reliability while reducing health, safety and environmental incidents and accidents. While
some think of RCM Blitz™ as a streamlined method, the RCM Blitz process meets and exceeds the SAE JA-1011 and
JA-1012 standards for Traditional RCM.
The RCM Blitz™ utilizes that allows the user to upload their equipment hierarchy to the component level with
functionality designed to build both speed and accuracy into the analysis process.
RCM Blitz™ works because we address and mitigate the Failure Modes that result from the context and environment
in which you operate your equipment.
Traditional RCM methodologies wait and perform their analysis following significant failure events, RCM Blitz™
is proactive. Tasks and analysis can be performed before failures, eliminating these events before they ever occur.
We bring nearly twenty-five years of experience in working with companies to build efficient failure modes based
proactive maintenance strategies that ensure reliability and safety.
TARGET AUDIENCE
This course is very relevant to technical engineers and professionals who handle and are responsible for their organisations’ maintenance; as well as the overall
smooth operations and processes of their organizations’ plants and machineries. These include Superintendents, Managers, Supervisors, Team Leaders, Heads
of Department, Engineers, Foreman, Planners, Directors of the following departments:
From the following industries: Mining, Manufacturing, Power & Utilities, Engineering, Oil & Gas, Petrochemicals, Chemicals, Pharmaceuticals, Food &
Beverage, Automotive, Construction, Aviation, FMCG, Telecommunications
COURSE OUTLINE:
DAY 1 DAY 3
RCM PREPARATION MAKING TASK DECISIONS
DAY 2 DAY 4
FMECA – FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS TASK IMPLEMENTATION
COMPANY DETAILS
COMPANY NAME: _________________________________________________________________
ADRRESS: _________________________________________________________________
TEL: _________________________________________________________________
FAX: _________________________________________________________________
DELEGATE 1 DELEGATE 2
NAME: ______________________ NAME: ________________________
JOB TITLE: ______________________ JOB TITLE: ________________________
DIRECT NUMBER: ______________________ DIRECT NUMBER: ________________________
EMAIL: ______________________ EMAIL: ________________________
DELEGATE 3 DELEGATE 4
NAME: ______________________ NAME: ________________________
JOB TITLE: ______________________ JOB TITLE: ________________________
DIRECT NUMBER: ______________________ DIRECT NUMBER: ________________________
EMAIL: ______________________ EMAIL: ________________________
DELEGATE 5 DELEGATE 6
NAME: ______________________ NAME: ________________________
JOB TITLE: ______________________ JOB TITLE: ________________________
DIRECT NUMBER: ______________________ DIRECT NUMBER: ________________________
EMAIL: ______________________ EMAIL: ________________________
DELEGATE 7 DELEGATE 8
NAME: ______________________ NAME: ________________________
JOB TITLE: ______________________ JOB TITLE: ________________________
DIRECT NUMBER: ______________________ DIRECT NUMBER: ________________________
EMAIL: ______________________ EMAIL: ________________________
AUTHORISATION (REGISTRATION NOT VALID WITHOUT AUTHORISATION) (WE WILL SEND YOU A SECURED PAYMENT LINK UPON REGISTRATION)
_____________________________ ____________________________
NAME: DIRECT NUMBER:
BANK TRANSFER
_____________________________ ____________________________
JOB TITLE: EMAIL: SALVO GLOBAL PTE. LTD.
HSBC SINGAPORE / SINGAPORE
ACCOUNT NUMBER: 260-575832-178 USD
____________________________________________________________________ SWIFT CODE: HSBCSGSG
SIGNATURE: