Scope of work: Mechanical inspection to evaluate integrity of static asset of tropical palm mill based

upon the requirements listed in the recognized codes and standards for that geographic location, as well
as additional requirements contained within company procedures and industry recommended practices.
Static assets consist of but not limited to equipment below. All dimension and specification as
preliminary information only and may differ between each sites (total 9).
No Equipment Diameter Length Width Height Orientation Material
meter meter meter meter
SS400 plate 18
1. Sterilizer 3.2 26 Horizontal
mm thk
SS400 plate 6-8
2. Blowdown chamber 10 2 Vertical
mm thk
MS plate 12 mm
3. Exhaust silencer 7.7 1.9 Vertical
thk
4. Digester TBA later Vertical TBA later
5. Sand Trap Tank 1.9 5.4 Vertical
SS plate 4.5 mm
6. Crude Oil Tank Horizontal
1.5 1.5 12.2 thk
SS plate 6 mm
7. Dilution Tank Vertical
2.2 2.2 thk
Continuous Settling
8. TBA later Vertical TBA later
Tank
9. Clarifier Tank 6.3 10 Vertical TBA later
10. Oil Tank 3.8 6 Vertical TBA later
11. Sludge Tank 3.8 6 Vertical TBA later
MS plate 6-12
12. CPO Tank 15 6 Vertical
mm thk
13. PKO Tank Vertical
Back pressure receiver MS A283 Gr C
14. 2.7 10.5 Horizontal
vessel plate 12 mm thk
Biomass-fired water
15. tube boiler rated
capacity 30-60 TPH
16. Kernel Silo TBA later Vertical TBA later

17. Kernel Bulk Silo TBA later Vertical TBA later