Roller mill QUADROPOL

Mech. design

Training TUBAFA at Polysius in Germany


November 20th to 30th 2012

Thys s enKrupp Polys ius


QUADROPOL²- Mill

Full damping of roller unit by foundation


Mill housing free of grinding forces
Equal hot gas and material distribution
Low vibration
Good accessibility to main components
Easy maintenance
Four or two roller operation
Designed for 500 to 12.000kW
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
2 Thys s enKrupp Polys ius
QUADROPOL²- Mill – QMR² - Main components
Separator
Feed Chute

Grit Cone
Mill Housing

Roller Unit

Hot Gas Inlet Grinding Table

Gear Box
Main Motor

Foundation

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
3 Thys s enKrupp Polys ius
QUADROPOL²- Mill – QMR²

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
4 Thys s enKrupp Polys ius
QUADROPOL²- Mill -Transmission of Grinding Forces – Normal operation

•• Full Roller Unit


Fulldamping
damping of
ofroller
roller
units
unitsby
byfoundation
foundation
•• Mill
Millhousing
housingcompletely
completely Grinding Table
free
freeof
offorces
forces

Foundation
•• smooth
smoothand
andlow-
low-
vibration Gear Box
vibrationoperation
operation
•• low
lowintake
intakeofoffalse
falseair
airin
in
entire
entireroller
rollermill
mill
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
5 Thys s enKrupp Polys ius
QUADROPOL²- Mill -Transmission of Grinding Forces – Rough Running

•• Full Roller Unit


Fulldamping
damping of
ofroller
roller Zero Gap
units
unitsby
byfoundation
foundation ~10mm
•• Mill
Millhousing
housingcompletely
completely Grinding Table
free
freeof
offorces
forces

Foundation
•• No
Nocontact
contactto
tothe
the
grinding Gear Box
grindingtable
table
•• Gear
Gearbox
boxprotection
protection

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
6 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit

Less moving masses


Only two roller bearings
Only one roller sealing, positioned outside the mill
Easy changing of bearing seal
Only one hydraulic Cylinder for mill operation
Only one piston accumulator for mill operation
Low vibration during operation
Easy maintenance
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
7 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - QM² 45/23

1,7m

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
8 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit – Main components
Pressure Bearing Hydraulic Cylinder
Roller Bearing
Tension Frame (tapered)
Piston Accumulator
Roller Tyre

Fixed Bearing
(maintenance-free)

Roller Axle
Lifting Cylinder Zero Gap Adjusting
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
9 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit – Bearings

Two!! Roller Bearings


Paired Tapered
Roller Bearing

Fixed Bearing
(maintenance-free)

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
10 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit – Dismounting

Standard “LUKAS” Cylinder


Dismounting Cylinder
Shifting Skates
Travel-out Cylinder

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
11 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - Dismantling

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
12 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - Dismantling

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
13 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - Dismantling

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
14 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - Dismantling

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
15 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - Roller Sealing Outside Mill

Mill outside Mill inside

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
16 Thys s enKrupp Polys ius
QUADROPOL²- Roller Unit - Roller Sealing Outside Mill

Mill outside Mill inside

One!! Rotating Sealing Outside Mill

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
17 Thys s enKrupp Polys ius
QUADROPOL²- Lubrication

All sensors outside the mill


No piping inside the roller
One lubrication unit for each roller unit
Good accessibility to lubrication components
Easy maintenance

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
18 Thys s enKrupp Polys ius
QUADROPOL²- Lubrication units
Oil supply line Double change over filter

Temperature gauge Pressure gauge

Flow meter
Pump
Return flow

Thermostat valve

Water – Oil cooler

Heaters
Oil tank

Temperature measurement

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
19 Thys s enKrupp Polys ius
QUADROPOL²- Lubrication - Roller Bearings

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
20 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic

Only one hydraulic cylinder for mill operation


Only one piston accumulator for mill operation
Flow optimised hydraulic pipe
Good accessibility to hydraulic components
Easy changing of cylinder
Low vibration during operation
Easy maintenance

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
21 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic
One !! Piston Accumulator

Flow Optimised Pipe


One!! Hydraulic Cylinder

Oil

Nitrogen

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
22 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic – Connection Pipe between Cylinder and Accumulator

Flow Optimised Hydraulic Pipe

Not Flow Optimised Hydraulic Pipe

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
23 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic – Cylinder and Pressure Bearing

Hydraulic Cylinder

Piston

Pressure Bearing
(hydrostatic)

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
24 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic – Cylinder and Pressure Bearing

Hydraulic Cylinder

Piston
Hydraulic Oil

Pressure Bearing
(hydrostatic)

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
25 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic – Cylinder and Pressure Bearing
Hydraulic Cylinder

Hydraulic Oil
Piston

Pressure Bearing
(hydrostatic)

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
26 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic – Cylinder and Pressure Bearing
Hydraulic Cylinder

Hydraulic Oil
Piston

Pressure Bearing
(hydrostatic)

Oil Pressure Metal Contact


Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
27 Thys s enKrupp Polys ius
QUADROPOL²- Hydraulic – Start-up Cylinder and Bladder Accumulator

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
28 Thys s enKrupp Polys ius
QUADROPOL²- Grinding Table

Table segments optimised for casting


Table isolation reduces thermal deformation
and stresses
Easy changing of the table segments
Dam ring bolted for quick adjustment

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
29 Thys s enKrupp Polys ius
QUADROPOL²- Grinding Table

Table Liner
Dam Ring

Grinding Table
Insulation
Table Liner Fastening
Grinding Table

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
30 Thys s enKrupp Polys ius
QUADROPOL²- Grinding Table

Dam Ring Clamping Plate


Retaining Plate

Table Liner

Grinding Table

Grinding Table Expansion Bolt


Insulation
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
31 Thys s enKrupp Polys ius
QUADROPOL²- Grinding Table

Table Liner

Dam Ring

Grinding Table
Insulation

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
32 Thys s enKrupp Polys ius
QUADROPOL²- Grinding Table

Table Liner

Wedge Element

Grinding Table

Lug

Table Liner Fastening

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
33 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing

Mill housing free of grinding forces


Optimised gas flow profile from inlet to separator
Optimised material carrying capacity from
nozzle ring to separator
Feed chute integrated into grit cone
Perfect material mix to centre of grinding table
Stable mill performance
Less wear
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
34 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing

Feed chute integrated into grit cone

Perfect material mix to centre of


grinding table

Optimised gas flow profile


and material carrying capacity from
nozzle ring to separator

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
35 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing - Circumferential Nozzle Ring

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
36 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing - Circumferential Nozzle Ring

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
37 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing - Circumferential Nozzle Ring

Deflector Plates

Guide Plates

Gas Duct

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
38 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing

- optimised flow profile by CFD-calculation


- optimised strength of the housing by FE-calculation

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
39 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing – CFD Calculation

QM²

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
40 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing – CFD Calculation

QM²

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
41 Thys s enKrupp Polys ius
QUADROPOL²- Mill Housing – CFD Calculation

High gas speed


Low gas speed to catch the material
wear protection

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
42 Thys s enKrupp Polys ius
QUADROPOL²- Foundation

Low vibration during operation


Low movement of Roller unit during
rough running
Damping of roller unit by concrete
Less total cost

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
43 Thys s enKrupp Polys ius
QUADROPOL²- Mill Foundation – QMR²

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
44 Thys s enKrupp Polys ius
QUADROPOL²- Mill Foundation – Pretension of Concrete

Base Plate

Grouting

Fixation of Roller Unit

Pretension of Concrete

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
45 Thys s enKrupp Polys ius
QUADROPOL²- Mill Foundation – QMR²

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
46 Thys s enKrupp Polys ius
QUADROPOL²- Mill Foundation – QMR²

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
47 Thys s enKrupp Polys ius
QUADROPOL²- Wear Protection

Quality for roller tyre and table liner


Ceramic

Portable wear plates for the mill housing

Quality of the wear plates according to


the wear rate

Bolted wear plates


Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
48 Thys s enKrupp Polys ius
QUADROPOL²- Wear Protection - Roller Axle, Roller Body and Mill Housing

Wear protection Mill Housing


Wear Plate

Roller Tyre
Ceramic inserts

Wear protection Roller body


Compound Plate

Spherical disc with hard facing

Wear protection Roller axle


Compound Plate
Wear Plate
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
49 Thys s enKrupp Polys ius
QUADROPOL²- Wear Protection - Mill
Rotor Blades
Compound Plate
Feed Chute
Compound Plate Guide Vanes
Compound Plate

Grit Cone
Mill Housing Compound Plate
Wear Plate

Roller Tyre
Ceramic inserts

Table Insulation Table Liners


Compound Plate Ceramic inserts

Discharge Ring
Driver Plate: Compound Plate
Scraper: Cast Iron 60 HRC

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
50 Thys s enKrupp Polys ius
QUADROPOL²- Wear Protection - Mill Housing

Mill Housing
Wear Plate

Deflector Plates
Compound Plate

Guide Plates
Wear Plate

Gas Duct
Wear plate

Discharge Ring
Driver Plate: Compound Plate
Scraper: Cast Iron 60 HRC

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
51 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
52 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator
Upper bearing
arrangement

Discharge bend Rotor

Guide vane ring


Housing

Grit cone

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
53 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator - Rotor
Upper bearing
arrangement

Rotor blades

Lower bearing
arrangement

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
54 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator – Upper bearing arrangement

Axial spherical roller bearing

Lube nipple

Radial shaft seal

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
55 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator – Lower bearing arrangement
Labyrinth ring
Axial spherical roller bearing

Lube pipe

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
56 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
57 Thys s enKrupp Polys ius
QUADROPOL²- Sepol Separator

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
58 Thys s enKrupp Polys ius
QUADROPOL²- Plant Layout
If Quadropol is located outside of a building no stationary crane
is needed for maintenance. All 4 roller units can be pulled into
a position that provides accessibility by a mobile crane.

• Position of cyclones at 45 °
to main mill axis

• Services rails prolonged


where necessary

• Prolonged service rails


mounted on steel or concrete
structure designed to carry
only weight of roller unit

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
59 Thys s enKrupp Polys ius
QUADROPOL²- Plant Layout

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
60 Thys s enKrupp Polys ius
QUADROPOL²- Plant Layout

Roller Mill QUADROPOL


Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
61 Thys s enKrupp Polys ius
Roller Mill QUADROPOL
Design
Training TUBAFA at Polysius in Germany
November 20th to 30th 2012
62 Thys s enKrupp Polys ius

You might also like