2010: issue 6

A publication of Caterpillar Global Mining

Caterpillar produces
50,000th truck

Making mine sites safer by


reducing blind spots

Going underground
to create the second largest gold mine

in china
modern systems demand
clean fuel

Availability is key
CC&V demands
consistent production
from haulage fleet

Flee t m a n a g e m e n t:
Getting ready for the upturn

Film showcases
companies that are
mining right
I’m pleased to present this edition of Viewpoint magazine—
the first issue in this new decade.
We’ve heard from a number of readers in the past This issue’s safety feature focuses on operator
few months who find it a valuable resource for visibility and how a new object detection system will
information about the mining industry and who help enhance vision and protect against collisions
eagerly await each new issue. Every day we get new involving large mining trucks.
subscription requests from all over the world.
Our best practices story highlights the importance
Like everyone in the mining industry, we have of clean fuel and showcases a mine in Armenia that
been dealing with challenging times in the past year. realized outstanding results from the installation of
We hope you’ll find information in this issue to help a fuel filtration system.
you be successful today and in the years ahead.
We also feature “Ground Rules: Mining Right for
We address the industry’s response to the reduced a Sustainable Future,” a film that is the cornerstone
demand for commodities in an article about of a new educational program designed to help
fleet management, where we not only discuss improve public opinion about mining. It includes
activities in the downturn, but also focus on the a set of 75 lesson plans to help educators further
ways manufacturers and mining companies are examine the themes and concepts presented in
preparing for the upturn. the film.

In this issue, we feature Cripple Creek & Victor Gold We’re always looking for new ways—like
mine in Colorado, which recently completed a six- Viewpoint—to add value beyond the products and
month evaluation of new trucks for its haulage fleet. services we provide to our customers.
We’re grateful for this mine’s participation in a field
follow on our new 793F trucks and we appreciate
their valuable feedback.

We take readers to China’s Jinfeng mine, a gold-rich Chris Curfman


site that has moved underground and is now the President, Caterpillar Global Mining
second largest gold mine in China.

Editorial Board: Tony Johnson, Editor. Glenn Morrison, Australia; Matt Turner, Canada; June Viewpoint is a publication of Cat Global Mining,
Tian, China; Martin Gill, CIS; David Mohr, Europe, Africa and the Middle producer of one of the mining industry’s broadest
East; John Bergin, Southeast Asia; Keith Malison, Latin America; Brad lines of equipment and technology. Caterpillar
Beyer, United States; David Rea, Large Mining Trucks; Mel Busch, Large serves the worldwide mining community through
Track-Type Tractors; Randy Aneloski, Large Wheel Loaders; Yon Chong, its vast dealer network and a single division called
Underground Machines; Kent Clifton, Support; Ken Edwards, Safety & Caterpillar Global Mining, headquartered in
Sustainability; Tim Siekmann, Product Support; Greg Gardner/Dan Hellige/ Peoria, USA, with additional offices worldwide.
Andy Trent, Global Accounts; Renee Balaco/Charlie Zimmerman, Mining
Marketing; Roschelle McCoy, Technology; Converse Marketing, Publisher.

c Cat Global Mining / Viewpoint / 2010: issue 6


AUTOMATIC WATER DRAIN COALESCING FILTER ELEMENTS
Allows excess water to drain. Fibers attract water into large
droplets that fall to the bottom.
(view is simplified for illustration.)
OUTLET SAMPLING VALVE
Provides access for
filtered fuel samples.

SLUG CONTROL VALVE 4-MICRON PARTI


Slows down or shuts off fuel flow if Removes abrasive
the amount of water in the fuel
exceeds the flow capacity of the Gauges
water drain valve or if particulate or indicate filter INLET SAMPLING
coalescer filters start to plug. restriction. Provides access fo
unfiltered fuel sam
table of contents
WATER METER
GA

28
Continuously measures and Port for
caterpillar produces Sh
records volume of water removed. optional
50,000th Off-Highway Truck
heating du
element. rem

CLEAN, DRY FUEL


Object Detection:
Making mine sites safer by reducing blind spots 26
modern systems demand clean fuel

the dangers of contamination 2


Going underground
to create the second largest
gold mine in China: JinFeng Mine
Getting ready for the upturn
16 6
Film showcases companies that are
mining right 22
CC&V demands consistent
production from haulage fleet

Availability is key 8
News from caterpillar 29
Cat Global Mining / Viewpoint 1
Mine sites purchase, store and consume millions of liters of fuel each year—a major expense
and a leading contributor to machine performance. Today’s increasingly complex fuel injection
systems require fuel to be of a higher quality—especially when it comes to cleanliness—
than ever before.

THE DANGERS OF CONTAMINATION:


MODERN SYSTEMS DEMAND CLEAN FUEL

While mines can’t always control the condition of performance and fuel economy of the engine and
the fuel they receive, they can have an impact on are expensive to replace when worn.
how clean it is when it enters the machine. Mines
Component life cycle cost is roughly defined as
around the world are taking steps to reduce fuel
cost to rebuild the component divided by actual
contamination—extending the life of components,
component life in hours. Extending the life of
improving machine performance, maintaining fuel
a component is the most important factor in
economy and increasing machine availability.
reducing its life cycle cost. This does not mean
“There’s no question that the use of contaminated simply extending overhaul intervals and allowing
fuel in modern fuel systems can cause a host of components to wear more severely. It means
problems with machinery,” says David Barker, a implementing a strategy to reduce the rate of
product support consultant in Caterpillar’s Global wear and achieve longer component life without
Aside from the cost Mining Division. “But there are things sites can do incurring excessive wear.
of tires and fuel, to control the cleanliness of the fuel they use.”
“Contaminated fuel can cause an unacceptable rate
and the wages of THE COST OF CONTAMINATION of injector wear and resultant failure—and, as a
machine operators, Cleanliness is critical to minimizing cost-per-tonne
result, unnecessary repair costs,” says Barker.
about 70 percent through better care of machines. “Aside from the FUEL CONTAMINANTS
of total machine cost of tires and fuel, and the wages of machine
The two most common contaminants in fuel are
operating cost operators, about 70 percent of total machine
excessive dirt and water. These contaminants
is the life cycle operating cost is the life cycle costs of powertrain
are typically introduced into fuel during the
costs of powertrain components,” explains Barker.
transportation, mixing or storage process.
components.  n a typical large mining truck, the cost
O
Water, the most common contaminant, may be
distribution is:
introduced when warm, moist air condenses on the
 Engine 40%
fuel tank walls and condensation builds up.
 Transmission/Torque Converter 10%
Final Drive & Differential 40% Excessive water can reduce the lubricating qualities
Miscellaneous 10% of the fuel and cause injector seizure and contingent
engine damage. In addition, fungus and bacteria
Modern fuel systems use electronic unit injectors,
live in water. When they get into a fuel system, they
a component that delivers precise amounts of fuel
can plug fuel filters, reducing their life and causing
and controls injection timing to within thousandths
premature injector wear-out, all of which affect the
of a second. Electronic unit injectors control the
life of the machine.

2 Cat Global Mining / Viewpoint / issue 6


Particles of dirt, sediment and other solids have capacity on the site should be adequate to let new
a similar effect on fuel injectors, causing them to fuel deliveries settle for two to three days before
wear out prematurely and leading to unnecessary drawing the supply fuel from the tank.
failures.
“The most common problem on mine sites is lack
Clean fuel does more than just reduce problems, of tank capacity,” says Barker. “Mine capacity and
however. Added benefits include improved fuel haulage fleets often grow faster than their fuel
economy and longer component life. In addition to storage facility. This usually results in fuel being
reducing the replacement frequency of fuel filters added to tanks while it is being consumed. This
and injectors, clean fuel prolongs injector life. practice stirs up contaminants and keeps them in
suspension in the delivery fuel.”
“What it really boils down to is availability of the
machine,” says Barker. “When machines are not Storage tank design
in for repairs, they are at work on the site. Less
Regardless of size or shape, best practices
downtime means greater productivity.”
recommend that fuel storage tanks have the
IMPROVING CLEANLINESS following:

The two critical factors leading to fuel quality are the Sloped tank floor. Water which settles out of the
cleanliness of the fuel delivered to the site, and the fuel will flow to the lowest spot in the sloped tank.
storage and handling practices used after it arrives. Tanks should have a drain at the lowest point and
be drained frequently to minimize the presence
“Fuel suppliers, of course, indicate to mine sites
of water.
that the fuel they deliver is clean,” says Barker. “And
many times it starts out that way. But that fuel isn’t Well-located suction pipe. A suction pipe located well
going directly into machines; it’s going into bulk above floor level will ensure that only clean fuel is
storage tanks that may be contaminated or have drawn in, and water and dirt that have settled to the
high levels of condensation built up.” bottom of the tank remain undisturbed.

In order to maximize engine life, diesel fuel Desiccant vent filters. These filters remove any
supplied to the fuel tank should have a maximum moisture from air entering the tank.
particulate level of ISO 18/16/13 with a maximum
Non-corrosive tank lining. At a minimum, the tank
water content level of 0.1 percent (1,000 ppm).
floor and the bottom 1 meter (3 feet) of the tank
In some geographic areas, fuel suppliers to mines should be epoxy coated to resist corrosion from Fuel leaving the refinery is
have the infrastructure and discipline to deliver trapped water. transported to remote locations
through ships, pipelines, barges
relatively clean fuel. However, in the majority of and trucks, and is often stored
Fuel handling in intermediate storage tanks
mining applications, that is not the case. Fuel like the ones above. Each time
leaving the refinery is transported to remote the fuel is stored or moved, it
Once the proper steps have been taken regarding has the opportunity to attract
locations through ships, pipelines, barges and storage, it’s important to also have a fuel contaminants. In some cases
gross amounts of water and/or
trucks, and is often stored in intermediate storage maintenance policy, with adequate personnel in dirt can contaminate the fuel.
tanks. Each time the fuel is stored or moved, it place responsible for proper fuel handling. This
has the opportunity to attract contaminants. In includes using particle counters and water detection
some cases gross amounts of water and/or dirt can tests to measure cleanliness and sampling incoming
contaminate the fuel. Much of this can be removed shipments and outgoing fuel.
through proper storage and handling.
SUPPLEMENTING WITH FILTRATION
Fuel Storage Capacity
The fuel filters on machines are designed to provide
Given adequate storage time, much of the dirt and final filtration for moderately clean supply fuel.
water in fuel will settle to the bottom of the storage Machine filtration is not intended to clean fuel
tank if the fuel is left undisturbed. Fuel storage contaminated with large amounts of dirt and water.
Cat Global Mining / Viewpoint 3
If contaminated fuel is used, the capability of the be quickly and easily replaced without the need for
onboard filtration is overwhelmed and injectors hand tools.
either wear out prematurely or seize.
The coalescer unit contains multiple elements
One way to reduce the burden on machine fuel capable of removing up to 3 percent water by
filters is to install a bulk fuel filtration system. Bulk volume to 1,000 ppm (0.1 percent) or less at the
fuel filtration consists of high capacity filters that rated flow. Water removed by these elements falls to
remove both excess dirt and water from the supply the bottom of the coalescer unit and is automatically
fuel before it is put into the machine. drained to an external water storage vessel. A float
mechanism in the bottom of the unit monitors the
Caterpillar has engineered a packaged system
water level. The coalescing elements do not plug
to remove both dirt and water. The Cat Bulk ®

and usually require changing only once a year.


Fuel Filtration System is intended for use in any
application where users store fuel for machines An automatic flow control valve slows down or stops
or engines. It requires very little maintenance and fuel outlet flow if particulate filters plug or there are
contains safeguards to prevent contaminated fuel massive amounts of water in the fuel. This ensures
from passing through the unit. only clean fuel leaves the unit.

How it works The maximum fuel flow rate of the user’s fuel
supply system determines the size of the coalescer
“Bulk fuel filtration The self-contained unit is mounted on a skid,
filtration system. Four different units are available.
has been used in the and is placed between the fuel storage tank and
The smaller units are sized at 190-liters-per-minute
aviation industry for fueling station.
(lpm) (50 gallons-per-minute) (gpm) and 379 lpm
more than 50 years The 4-micron, beta 200, full synthetic particulate (100 gpm) units. They are intended for day tank

to address these filter elements remove dirt in a single pass and applications or for portable use on a fuel truck
where fueling is done manually. The 757 lpm (200
same problems. effectively hold large volumes of debris. Filter
gpm) unit is intended for fuel stations using fast-
change intervals are about once a month, depending
Now, Caterpillar on the level of contamination. Filter elements may fill, where maximum flow does not exceed 757 lpm
has adopted this (200 gpm). This unit will handle truck sizes up to
proven technology SEPARATOR CANISTER
Repels smaller water droplets
to help our mining suspended in moving fuel flow and
COALESCER UNIT
customers.” prevents them from escaping.

–David Barker, Product AUTOMATIC WATER DRAIN COALESCING FILTER ELEMENTS


Support Consultant Allows excess water to drain. Fibers attract water into large
droplets that fall to the bottom.
(view is simplified for illustration.)
OUTLET SAMPLING VALVE
Provides access for
filtered fuel samples.

SLUG CONTROL VALVE 4-MICRON PARTICULATE FILTER


Slows down or shuts off fuel flow if Removes abrasive particles.
the amount of water in the fuel
exceeds the flow capacity of the Gauges
water drain valve or if particulate or indicate filter INLET SAMPLING VALVE
coalescer filters start to plug. restriction. Provides access for
unfiltered fuel samples.

WATER METER
Port for GATE VALVE
Continuously measures and
optional Shuts off flow
records volume of water removed.
heating during service or
element. removal of unit.

CLEAN, DRY FUEL

4 Cat Global Mining / Viewpoint / issue 6


the 218-tonne (240-short-ton) Cat 793. The largest “Replacing parts is a challenge in Armenia,” says “The impact it had
unit, 1136 lpm (300 gpm), is intended for fast-fill of Ivan Glushankov, a Caterpillar mining product
on our site was
327-tonne (360-short-ton) Cat 797 size trucks. support specialist based in Moscow. “Not only is
it costly to replace parts, it’s also a challenge to
immediate and
Permanent installation is simple, says Barker. “All
get them. It can sometimes take 30 days to repair significant. We have
you need is a small concrete pad downstream of the
a machine—and when that machine is down, seen improvements
fuel storage tank and supply pump. And a water
container is required nearby to store the wastewater
productivity is down.” in every machine
removed from the fuel.” The system doesn’t require Caterpillar and Zeppelin Armenia representatives we operate.”
–r ubik abramyan,
electric power unless it’s used in extremely cold visited the site, evaluated the problem and
zangezur mine, armenia
climates. An optional electric fuel heater is available recommended the site install the bulk fuel filtration
for cold climates where water removed from the fuel system. The results were impressive.
may freeze.
“All the problems disappeared,” says Rubik
SEEING RESULTS Abramyan, head of the mine’s transportation
department. “I have recommended to every mine
“You might wonder why, if mine sites could see site that they install this system. The impact it had
the value of fuel cleanliness, they aren’t all using
on our site was immediate and significant. We have
filtration systems,” says Barker. “Truth is, they are
seen improvements in every machine we operate.”
now beginning to understand how important it is—
and what a difference it makes in the life of their Glushankov estimates that the improved
components and their equipment.” performance and longer component life resulting
from using clean fuel has allowed Zangezur to pay
For example, Zangezur mine in Armenia had faced
for the fuel filtration system in just a few months.
ongoing problems with injectors and engines in
all types of equipment on site. The installation of a “They’re relatively inexpensive, especially when
Cat Bulk Fuel Filtration system has had a dramatic compared to the cost of a mining machine,” says
impact at the mine, which is operated by Zangezur Barker. “If you eliminate the need to replace a
Copper and Molybdenum Mining Company and couple sets of injectors, you’ve paid for it.”
owned by German company Cronimet. Sites in the United States have seen similar results,
Zangezur mine, established in 1952, is the largest says Barker. “These customers are no longer dealing
mining enterprise in Armenia and is the site of one with plugged fuel filters. We had one mine manager
of the biggest deposits of molybdenum in the world. tell us that he had been replacing a fuel filter every Injector problems have a
negative impact on any mine
In 2009, the site produced an estimated 41000 day prior to installing the bulk fuel filtration system. site, but that impact is even
more significant in a remote
tonnes (45,000 short tons) of copper and about In the 10-day period after that, he didn’t make one
location like Zangezur. The
8200 tonnes (9,000 short tons) of molybdenum replacement. Customers are also reporting that mine operates at an altitude of
2200 meters (7,217 feet) and
concentrate. The site operates about 30 machines, they’re not forced to replace injectors at the half- is surrounded by mountains.

including Cat 785 trucks, 992 and 993 wheel loaders, life of the engine. And as always, less downtime
several track-type tractors and an excavator. translates to higher productivity.”

Injector problems have a negative impact on any Barker predicts bulk fuel filtration will become a
mine site, but that impact is even more significant more common process on sites throughout the
in a remote location like Zangezur. The mine world. “We have one customer that is so impressed
operates at an altitude of 2200 meters (7,217 feet) with the benefits of clean fuel that they’re filtering
and is surrounded by mountains. the fuel when it goes into the storage tank, and
again when it comes out,” he says.

FUEL WITH DIRT AND WATER

Cat Global Mining / Viewpoint 5


DEALING WITH THE DOWNTURN
As mines around the world adjusted their production When the downturn hit, mining companies around
levels to meet the reduced demand for commodities, the world responded in different ways in regard to
mining companies continued to make a number of their haulage fleets. Some took trucks completely
important decisions that impact their equipment fleets. out of production; others reduced their number of
Whether machines were idled completely, operated less shifts, yet continued to use their entire fleets for
frequently, used for parts or moved to other locations, fewer hours. In some cases, parked trucks were
it’s important that equipment managers think about used to supply parts for the active fleet.
the future while dealing with the downturn. Empire Machinery is one of the many Cat dealers

fleet
whose customers were impacted by the tough
economy. The dealership has been supplying
equipment to mines in Arizona, USA, for more
than 50 years. “Some of our customers used parked
equipment to meet their need for parts,” says Larry

management:
Kitto, Empire’s director of mining. “Another method
to reduce costs was to leave trucks idle while they
are waiting for a component.” In times of high
production, dealers use “exchange” components
getting ready for the upturn so the truck is down only long enough for the
component to be installed. Cost reductions are the
driver when commodity prices are low, he explains,
so customers have chosen to stand the trucks down
and repair components instead of immediately
replacing them with another pre-built component.

The downturn had an effect on dealerships as well.


“When customers stop purchases and cancel orders,
it’s very painful for us,” says Kitto. “But in the long
run, if they ignore the situation, we will all be in
worse shape. Our approach is long-term. We are
partners with our customers in this business. Our
job is to help them be successful. And when they
succeed, they buy our products and services. It’s a
“The mining industry was significantly impacted by win-win.”
the economic downturn that hit in 2009,” says Chris
MEETING EQUIPMENT NEEDS
Curfman, president of Caterpillar Global Mining.
“Since then, we’ve continued to work alongside our From offering do-it-yourself maintenances tips to
dealers and our customers, making adjustments promoting cost-effective rebuilds, Caterpillar also
to weather tough economic times. However, a lot looked for ways to help customers deal with their
of our focus has been not on the current situation, equipment fleets during the downturn. “Given
but on the future. We believe the upturn is going that more machine owners were taking on routine
to be just as severe as the downturn. And when maintenance of their machines, Caterpillar put
it happens, we want to make sure our customers together some on-demand videos that provide
and dealers have the right equipment, in the best practical, detailed advice on various procedures,”
condition, ready to go to work. And we want to says Tim Siekmann, a Caterpillar product support
make sure we’re ready to support them.” manager. “The videos cover topics like proper
replacement of air filters, identifying hose-

6 Cat Global Mining / Viewpoint / issue 6


abrasion points, battery maintenance or preventing Today, the method for teaching operating skills can
contamination.” Videos are available at www.cat. be tailored to the individual operator’s situation—
com/maintenance-and-support. whether class-room instruction, on-site training,
“e-learning” or simulators.
“A downturn isn’t the time to stop taking care of
machines,” Siekmann continues. “In fact, it’s a good PREPARING FOR THE UPTURN
time, while production levels are reduced, to do
There’s no question that the mining industry has
some of those routine maintenance items or safety
faced some difficult times. But when asked to pick
enhancements that you haven’t wanted to take the
one word to describe his company’s outlook on the
truck out of production for.”
situation, Curfman chose “ready.”
The need for work-ready machines is a pressing
“We and our dealers are moving forward with
concern no matter the economic climate. “To
confidence and optimism,” he says. “We’re
address that concern, Cat dealers provide an
planning, organizing, preparing and executing.
excellent starting point—Technical Analysis
We’re working together with a sense of urgency to
inspections that assess the health of a machine and
help make sure our mining customers are ready.
identify potential problems,” says Siekmann. These
Ready to overcome today’s challenges—ready to
inspections give machine owners an objective look
capitalize on tomorrow’s opportunities. “ As mine managers
at machine condition and allow them to balance
prepare for increased
machine capability against impending work. Mining companies adjusted their workforces, demand, here are some
inventory and support levels for the current questions they have
Economically restoring existing machines to reliable
economic conditions. As they prepare for an considered:
condition is one “other-than-new” option, but that
upswing, Siekmann suggests it’s time to begin
option can be complemented with used equipment
evaluating the status of their fleets, forecasting the >W
 hat is the status of my fleet?
and rental equipment. Cat dealers offer a wide range Have idled trucks been used
need for service and components and evaluating the for parts? How do I make sure
of used machines for purchase or rent.
skill sets of their employees. they are ready to be put into
production again?
IMPROVING PERFORMANCE
Caterpillar, too, has developed a plan for the upturn. > Should I be planning rebuilds?
Another way to reduce costs is to become more “We’re working with mine sites to confirm we’re > Do I have my Planned
efficient—getting more performance out of the going to be ready with what they need from us,” Component Replacement
Forecast updated?
equipment and people on site. “Continuous says Siekmann.
> How can I use the Caterpillar
Improvement activities are a service Caterpillar Future Dated Order (FDO) and
“We don’t want long delays from the factory to
and Cat dealers have provided for a long time, but Committed Planned Repair
stand in the way of anyone’s success,” Curfman Order (CPRO) to make sure
their importance was even more apparent when my parts and components
says. “So we have fine-tuned our forecasting
the downturn occurred,” says Curfman. “Over the are available when I have
systems, evaluated inventories, took waste out of scheduled needed repairs?
past several years, we’ve invested millions of dollars
the supply chain and identified leading indicators > Am I forecasting and placing
in these activities at mines around the world, and orders so I can match them
that will serve as trigger points for our production
we’re continuing to fund this vital work through the with my capabilities and
processes and systems.” capacities?
downturn.”
Curfman says Caterpillar is confident in the mining > Have I reviewed my personnel
Activities cover every aspect of a mine’s operation, and their skill sets? Have I cut
industry’s ability to overcome these difficult times employees in the downturn and
from maintenance and repair to applications and lost some of the skill sets I’ll
and not only survive, but flourish in the years to
component life management. These projects can need in the upturn?
come. “Commodity prices are relatively strong and
have a significant impact on a site’s productivity.
still at investment thresholds, and we’re starting
Helping employees work more efficiently is another to see signs of life again in the mining business,”
cost-cutting objective. Caterpillar Equipment he says. “The message here is clear: We’ll not only
Training Solutions offers a practical means to help survive this particular downturn, but we will be
achieve these goals by equipping machine operators better than before.”
to perform their jobs competently and confidently.

Cat Global Mining / Viewpoint 7


Availability
is key
CC&V demands
consistent production
from haulage fleet
Cripple Creek & Victor Gold Mining Company operations
run around the clock on every day of the year. About 300
full-time employees and 50 contractors work 12-hour
shifts to produce 163000 tonnes (180,000 short tons)
of ore per day. Four crews in each department are
required to provide coverage throughout the year.

The ability of these employees to meet their


production targets is largely dependent on the
availability of the mining machines they operate.
The site relies heavily on consistent production
from its haulage fleet and work can come to a
standstill if a machine breaks down. The mine
operates a fleet of Cat 793D trucks, and as it
began looking to expand its fleet,
agreed to be a field follow
site for the new
Cat 793F.

A HISTORIC GOLD MINE

Cripple Creek & Victor Gold Mining


Company mine (CC&V) is a joint venture
majority owned and operated by AngloGold Ashanti
(Colorado) Corp. The current mining operation,
started in 1994, is called the Cresson Project. The
site south of Denver, Colorado, USA, had been
mined using underground methods since the late
1890s and into the 1950s. The area is famous for the
great gold find of the district, the “Cresson Vug,” a
cavity in the rock, lined with crystals somewhat like
a geode, where gold was essentially picked from the
walls of a room-sized void encountered about 366
meters (1,200 feet) below the surface in 1914.

Engineering for the modern Cresson mine began


in 1993. Obtaining the various permits necessary to
mine was completed in 1994. The first Cresson gold
was poured in 1995, and an expansion construction
began in 2000. In late 2003, CC&V reached its
planned expansion capacity of 18.1 million tonnes
(20 million short tons). The mine poured its two
millionth ounce in 2004.

Cat Global Mining / Viewpoint 9


As of December 2009, the mine reported a proven
ore reserve of about 112.5 million tonnes (124
million short tons), containing approximately 1.6
million ounces (45.5 million grams) of recoverable
gold. The annual gold production rate from the
Cresson Project varies somewhat with about 250,000
troy ounces produced in 2008. Currently, the mine
life is estimated to last until 2016.

This low-grade, open-pit operation produces doré


that is 70 percent gold and 20 percent silver. CC&V
processes about 22 million tonnes (24 million short
tons) of ore per year. The ore is treated using a
valley-type, heap-leach process with activated carbon
used to recover the gold. The resulting doré buttons
are shipped to a refinery for final processing.

EVALUATING HAUL TRUCKS

Buying a mining truck is serious business. Not only


is there the substantial outlay of money to consider,
but there are also the myriad ways that truck will
impact operations on the site. From matching with
shovels, to fitting on the haul road, to handling high
altitudes—many variables combine to determine the
right truck for the site. And it’s imperative to strive
for the lowest cost-per-tonne possible to succeed in
the competitive gold mining business.

When it was time to add some new trucks to the


CC&V fleet, the site began an evaluation process
that lasted nearly six months. “We did extensive
studies on a number of manufacturers’ trucks,” says
Vivien Hui, a senior engineer in mine operations
for AngloGold Ashanti (Colorado) Corp.
“We looked at everything you can
think of—from evaluating the engine
block material to gauge its ability to
handle our site’s rough terrain, to
evaluating the ease of maintenance
on the drive system.”
The site evaluated dozens of variables, including
how the truck options matched the site’s current
shovels and how the truck fit with the site’s
infrastructure, which requires travel from the shop,
to load-out, to bin, to crusher. The site considered
the overall capital cost for each truck, the costs for

10 Cat Global Mining / Viewpoint / 2010: issue 6


planned maintenance and major components, and The site was happy with its existing fleet of
the cost for labor required to maintain them. 227-tonne (250-ton) 793D trucks and agreed to
test two of the 793F trucks. The fifth generation
The mine looked at all variables first by cost-per-
of the 793 has a powerful new engine, choice
hour, then used a modeling program called Q’PIT
of power train options, choice of body systems
to measure each option on a cost-per-tonne basis.
and a completely redesigned operator station.
“We fed the details into the model and it told us
Serviceability has been updated with more ground
the cost-per-tonne over the life of our specific
level service points and 1,000-hour hydraulic filter
mine,” says Hui.
service intervals. Other changes promote safe
CONSIDERING SIZE OPTIONS operator and technician access—wider walkways,
flat upper deck, rear access ladder and three-way
One might think that in order to get the most below/ Vivien Hui, a senior
lock-out tag-out box mounted on the bumper. engineer in mine operations for
production from a site, the haulage fleet should be
AngloGold Ashanti (Colorado) Corp.,
the largest size trucks possible. That wasn’t true in “We short-listed down to three trucks that we championed a six-month project to
evaluate new mining trucks.
the case of CC&V. were considering, and then we narrowed it even
further to the Cat 793 trucks,” says Hui. “We had a
“We evaluated the ultra class trucks over 360 tons,”
combined 15,000 hours to study the new F-Series,
says Hui. “And we found that for our mine, the
and after the field follow we purchased both trucks.”
larger trucks would actually result in a higher cost-
per-tonne than a smaller truck.” Hui reports that the F-Series met the site’s cost-per-
tonne criteria and the capital cost comparison was
There are a number of reasons why:
favorable. While all of the F-Series enhancements
Haul profile. The site has both uphill and downhill are important, there are several that are of particular
loaded haul roads and judged the trucks by the cost- importance to CC&V.
per-tonne based on both of these profiles.
Performance
Infrastructure. Going with a large truck would have
made it necessary to expand the road width in order The 793F’s new engine is a great match for the
to meet the CC&V standard requiring roads that are environment in the Cripple Creek mining district,
just over three times the width of the truck. reports Bruce Neldner, parts and service manager at
Cat dealer Wagner Equipment, which is responsible
Dilution. Considering the dilution in its average ore
for the Cat equipment at the Cresson Project.
grade, it was determined that the additional waste
material would reduce the advantages gained from “This mine is on the side of a mountain,
using a larger truck. and there is a huge elevation change
Tires. As trucks get larger, exponentially the tires get from top to bottom,” he explains.
more expensive. CC&V considered its relationship “They’re working at 3048 to 3350 meters
with tire manufacturers and the allocation of
(10,000 to 11,000 feet) altitude. The
available tires.
less air there is, the less fuel you can
Shovels. Shovels currently on site were not the right
use, which means less power. But with
size to be the most productive with larger trucks.
this engine, you don’t have to cut the
TESTING A NEW MODEL fuel in the higher elevations.”
When Caterpillar approached CC&V to consider Hui agrees that it’s very important that the engine
being a field follow site for its new F-Series trucks, doesn’t derate at the mine’s altitude. “We get the
the timing couldn’t have been better. The site was same horsepower at 2 miles high as we do at 1 mile
able to evaluate this new and improved truck in high,” she says.
the midst of its search for new trucks to add to its
haulage fleet.
Cat Global Mining / Viewpoint 11
The 16-cylinder, 1976-kilowatt (2,650-horsepower) retarder set are really nice—I use them every round.
Cat C175-16 diesel engine displaces 5.3 liters (323 It works like a cruise control going downhill.”
in3) per cylinder, for a total displacement of 85 liters
Cat uses oil-cooled multiple disc brakes on all four
(5,187 in3). The 793F delivers 174 kilowatts (234
wheels. They provide immediate, fade resistant
horsepower) more than its predecessor, the 793D.
braking and retarding and with proper attention
The engine redesign was done in part to meet Tier 2 to oil temperatures, the brake discs and plates
emissions requirements; however, CC&V has found experience virtually no wear. Four-wheel balanced
a number of additional benefits. “We found that, braking improves handling and machine control.
yes, they redesigned the engine to be better for the
Another advantage is that unlike some trucks,
environment,” says Hui. “But we’ve also learned that
the Cat engine and truck are made by the same
the new block material is stronger, which is great for
manufacturer. “They’re designed to work well
our hard rock environment. And performance went
together and we only have one manufacturer to
up in the process.”
deal with if there is an issue,” Hui says.
The 793F delivers more power to the ground,
Safety and comfort
explains David Rea, a product marketing specialist
in Caterpillar’s Global Mining division. The new cab in the Cat F-Series trucks features
“It’s faster on grade, and because a number of improvements to make it a more
comfortable working environment, including
mining trucks spend the majority of
controls and gauges that are positioned to maximize
their time on grade, it can travel faster,
productivity and minimize fatigue.
move more tonnes, and deliver a lower
Hines says he appreciates the smooth, comfortable
cost-per-tonne,” he says.
ride and the improved visibility due to more window

1 / The operator environment in the Cat


F-Series trucks has been improved to be
more comfortable, with ergonomically
designed controls.

2 / The Cat high-strength frame is designed


to last in rugged mining applications like
the hard-rock environment at CC&V.

3 / Making service points easy to access,


like these gauges, means less downtime
for maintenance.
1 1 2

Hui reports the truck is a good match for the site’s area. “The cab is roomy and all the controls are
haul profile. “It goes fast uphill and fast downhill. reachable,” he says. “The comfort is great.”
It has great retarding going down and good torque
The safety enhancements of the new truck, such as
and speed going up. This reduces our cycle time.”
improved access and eggress, are also appreciated
Operator Vic Hines, who has been an operator at by the operators. “Caterpillar definitely thought
CC&V for eight years, is impressed with the truck’s about safety when they designed the F-Series,” says
performance. “The new engine and torque converter Hui. “It’s a number one goal for us and they are
are super,” he says. “It takes the hills great and helping us achieve it.”
takes off good on the grades. The throttle locks and

12 Cat Global Mining / Viewpoint / 2010: issue 6


Serviceability Field follow program tests
A number of the changes in the 793F were done to new trucks in real applications
make it easier to service—a welcome improvement Companies that purchase a new Cat F-Series truck may be buying a new model—but they’re
for the dealer and site technicians who work on the getting a truck that has been tested for thousands of hours. And it hasn’t just been tested
trucks. The operators also appreciate that walk- in a controlled environment. It has been put to work in a real-life environment on an actual
around inspections are easier. customer mine site.

“The oil checks and hubs are nice and the air bleed The Caterpillar Tucson Proving Ground is a one-of-a-kind testing facility for Cat trucks.
system is easy to access,” says Hines. “The sights on But there’s nothing quite like the real-world environment, where different altitudes and
the tanks are also improved.” climates, haul profiles and operator skill levels all have a different impact on a truck.

Wagner performs most of the maintenance “We want to put trucks in all applications and run them in a variety of environments—
on the Cat equipment at the Cresson Project, the cold of Canada, the coal fields of Wyoming, the high altitudes of South America,”
says Jeff Lester, Caterpillar service engineer. “From deep pits to shallow grades, high
although CC&V does much of their own planned
speeds to high temperatures. We want the complete story of the performance before
maintenance on site. “Overall we’ve found the new
we go to production.”
truck easier to service,” says Neldner. “A lot of the
improvements are concentrated on the service The answer is Caterpillar’s field follow program, during which Cat dealers and customers
points. Having as many at ground level as possible test developing trucks in real applications.
makes them easier to access. It’s also safer because
“Caterpillar benefits by getting a truck that is validated in a real-
the less you crawl around on the machine, obviously
the safer you are.”
world application with a real customer,” says Lester. “We are
able to tell the marketplace, ‘Yes, this is a new product. But it
Durability
has been validated on a customer site.’”
CC&V also was impressed by the new frame on The program is a benefit to customers as well, as they get an early look at new technology
and an opportunity to train operators and
maintenance people on the new trucks. And those
that participate in a field follow program are able
to use the truck for actual production for a low fee,
then get a good deal on the truck if they choose to
purchase it.

“Customers also get the advantage of giving their


input about new models directly back to Caterpillar,”
Lester says. “The operator is in the cab 12 hours a
day and he knows if he is fatigued or if he has good
visibility. We give his input back to the factory and
that can influence change. Field follow customers are
3
impacting the future of our trucks. When customers
make comments, we look at every single one.”

the 793F. Cat frames use a high strength, low alloy Cripple Creek & Victor Gold Mining Company (CC&V) in Colorado, USA, has partnered
(mild) steel with castings in highly stressed areas. on several field follow programs with Caterpillar and recently tested the new 793F. While
A key advantage of mild steel frames is that they can it can be a challenge to operate a truck that is still being proven, the benefits outweigh the
be easily welded in the field. They’re designed to last negatives, says Vivien Hui, a senior engineer in mine operations at AngloGold Ashanti
in rugged mining environments. (Colorado) Corp., majority owner and manager of CC&V.

“The percentage of castings went up, so the “We do field follow as part of our good neighbor policy,” she says. “We agree to show

frame has more durability,” says Hui. Frame life other mines what has been learned, and to show Caterpillar how the trucks are performing.
It’s good for us and it’s good for the industry.” (continued on next page)
is important because it dictates the long-term
economic life of the machine. “We know we can

Cat Global Mining / Viewpoint 13


keep rebuilding this truck and its components as long as the frame lasts,”
she says. “This new frame gives us confidence that we can run the truck to
or even past the life of our mine.”

Technology

Technology also weighed heavily on CC&V’s decision to purchase the


F-Series field follow trucks—in particular, the upgraded VIMS technology.
VIMS collects and transmits machine data and turns it into valuable
information used to track productivity, machine performance, service
scheduling, trends, diagnostics and equipment condition monitoring.

“There were third party technologies that do the same


thing, but we like that it’s integrated into the truck,”
says Hui.
The third generation of the system—VIMS3G—offers enhanced
convenience and functionality, along with updated communications
capabilities. A real-time browser allows users to view machine data on up
to 10 machine parameters in an easy-to-access Web browser. “Plenty of
technologies can capture the data, but this is realtime, which makes it much
more useful,” says Hui. CC&V partners with Wagner to analyze the data,
review trends and develop predictive maintenance plans.

guaranteeing Availability
1

Many variables are weighed when considering the purchase of a new truck,
and one of the most important is availability. “We need our trucks to be 2
running in order to meet our production goals,” says Hui. CC&V counts
on Wagner’s existing support structure to make sure the fleet delivers
high availability.

“Our mine superintendent would agree that the support of the dealer is one
of the most important things in our decision to purchase Cat trucks,” says
Hui. “This consistent support—from both Caterpillar and the dealer—helps
us stay on budget. We could maybe buy products with a slightly lower cost-
per-tonne on paper, but if we can’t count on them, then they’re not giving us
that consistency we need to meet our targets.”

Wagner’s Neldner says the dealership has worked hard to earn the mine’s
trust. “They have to know that their trucks are going to be supported,” he
says. “We have a lot of Cat equipment there and our support is proven to
them. We have a good, healthy relationship.”

Hui says the support the mine receives from Wagner is second to none.
“We’ve built a relationship where we are working together to make things
happen and to fix problems,” she says. “There’s no finger-pointing when 3

something goes wrong. It’s Caterpillar, Wagner and us, working together.”

14 Cat Global Mining / Viewpoint / 2010: issue 6


(continued) Cat dealers see benefits in participating as well. During the field follow process,
they are responsible for the trucks just as they would be if they sold them to the site. They
do inspections and updates, gather the truck feedback on performance, keep parts working
and develop preventive maintenance processes.

“We like it because it involves us with the process,” says


Bruce Neldner, parts and service manager at Wagner
Equipment, a Cat dealer in Colorado, New Mexico and Texas,
USA. “We can be a part of the changes to make it not just a
good truck, but a great truck.”
How field development works

Caterpillar has field follow engineers on every new product team. They are responsible
for a certain location and have daily contact with the dealer about the performance of the
machine. They travel a minimum of one week a month to visit the site, ride along with the
operator and gather feedback from everyone who interacts with the truck.

Internal reports are issued every day and are included in an online diary called the Pre-
Production Reliability Database (PPRD). ”Any time the dealer technicians touch the truck,
perform an inspection, do maintenance, deal with an operator performance issue, gather
operator comments—everything goes into this database. Engineering groups responsible
for every component or part have access to PPRD and can see exactly what is being done.”

What is learned in the field directly affects the development of the truck and its
components. “For example, operator input has influenced design enhancements for
production,” says Lester. “The seat goes back further than it used to and there is greater
head room. If operators tell us they need a little more power when pulling out from under
the shovel, or when they are traveling fully loaded up a grade, we take that information back
to the factory and work with our software or engine group to resolve the problem.”

Dealer feedback is also important. “Their service work ultimately affects the customer
because it has an impact on reliability and availability,” says Lester. “Say there are hoses
rubbing, or the routing of a tube could be better. All these little things add up to affect the
1 / CC&V has both uphill- and downhill-loaded time necessary for service and maintenance. More reliability means greater production for
haul roads, which require trucks with good
retarding as well as good torque and speed.
the customer.”

2 / The site counts on service and support from A validated truck


Wagner Equipment to keep its fleet running
around the clock. Caterpillar will not put a truck into production without adequate testing, but the real-life
3 / CC&V’s leach pad is used to treat about operation of the field follow program goes a long way to convince customers that these
22 million tonnes (24 million short tons) of
ore per year. trucks are ready to go to work.

“The Proving Grounds are great, but real life helps sell the truck,” says Hui. “We wouldn’t
want to be first to buy a truck. But if these trucks have 48,000 hours at three or four real
mines, that would put me more at ease. The reputation of these trucks will be proven
over time. I hope we have helped with a big chunk of that—working together to get this to
be a reliable truck.”

After thousands of hours of field development, two to-head comparisons with older Cat models as well
models of the new Cat F-Series large mining trucks as against competitive trucks. In fact, the 793F
are now in production. Nearly 20 retrofit 797F and has been found to be up to 20 percent faster
793F retrofit trucks were tested in four U.S. states, and 15 percent more productive in performance
Canada and Chile, in a variety of applications, haul studies. A third F-Series truck, the new size class
profiles, altitudes and climates. Production studies 795F AC, will begin limited production starting
have proven their improved performance in head- in 2011.

Cat Global Mining / Viewpoint 15


Until recently, the Jinfeng mine in Guizhou
province was an open pit gold mine. Today, mining
has also moved underground, making the gold-rich
site—which resembles the Carlin mine in Nevada,
USA—the second largest gold mine in China.
A mining model developed in Australia and
Mining in China
Canada is being reproduced with successful
The Jinfeng gold deposit is located within the
results at a mine in China whose geology
Qianxinan Prefecture, Guizhou Province, about
resembles a site in the United States—a true 240 kilometers (150 miles) southwest of the capital
example of the global nature of the mining city of Guiyang, at an elevation of 750 meters (2,460
feet). The project area is lightly populated (mainly
industry. An industry where mines learn from
the Bouyei minority group) and has a subsistence
past experiences and the best practices of farming economy.
one another in a never-ending search Mining activity in the region has been ongoing from
to become more productive. at least the latter part of the Qing Dynasty—more

Jinfeng Going

mine:
underground
to create the
second largest
gold mine in China
than 100 years—when mercury and arsenic mining Several gold
of the central section of the main Jinfeng deposit deposits in
was recorded. China’s Golden
Triangle region are
During the mid-1980s, renewed interest in gold
located in a similar
resulted in the completion of large government
stratigraphic position
sponsored stream-sediment geochemical programs
near the Triassic-Permian
across China. This work resulted in the detection
contact.
of 14 significant gold anomalies in the Jinfeng JINFENG

region, and follow-up in 1984 and 1985 defined The Golden Triangle region of China represents one
22 discrete prospects, one of which was the of the world’s great remaining under-explored gold
previously inspected arsenic occurrence on the regions. Recognized for its gold potential relatively
main deposit at Jinfeng. late in the latest gold cycle and suffering from a lack
The Golden Triangle region
of exploration funding or application of modern
Intense exploration activity by a local exploration of China represents one of
exploration techniques over the last decade, the the world’s great remaining
group commenced, and from 1986 to 1993 some under-explored gold regions.
region presents one of the few remaining genuine
15 kilometers (9 miles) of diamond drilling and Recognized for its gold potential
opportunities to discover significant gold deposits relatively late in the latest
8 kilometers (5 miles) of underground aditing gold cycle and suffering from
within a relatively low-risk environment. The region
were completed. This work successfully defined a lack of exploration funding
has the potential to become one of China’s most or application of modern
more than 50 tonnes (55 short tons) of gold and in exploration techniques over
important gold producing areas.
1992 the deposit was listed by the Central Chinese the last decade, the region
presents one of the few
Government under the 892 National Plan because of Much has been written about the deposits of remaining genuine opportunities
its likely impact to the economy. the Golden Triangle and their affinities (and to discover significant gold
deposits within a relatively low-
differences) to the Carlin deposits of Nevada, USA. risk environment. The region
Despite the deposit’s significance, exploration and
Chinese academics and their American colleagues has the potential to become
development work was curtailed in 1993 due to one of China’s most important
have long recognized that the deposits in general gold producing areas.
a lack of funding and metallurgical challenges,
share many distinct characteristics to Carlin and,
and Jinfeng was offered to a number of large
in a direct sense, represent the Chinese analogy of
foreign gold companies. However, aside from a
this important class of mineralization. Recent work
limited drilling program in 1997, activity remained
has not only strongly reinforced this concept and
subdued, and it wasn’t until Sino Gold Mining Ltd.
confirmed the key characteristics for Jinfeng, but
commenced negotiations in late 1999 that interest
also significantly added to the exploration appeal
in development was reinvigorated.
of the area.
Discovering a significant deposit
Jinfeng is a significant deposit, with ore reserves
The largest known Carlin-type deposit in China, containing 91000 kilograms (3.2 million ounces)
Jinfeng lies within Triassic clastic sedimentary at an average grade of 5.2 grams per tonne (0.16
rocks overlying the Permian and Carboniferous ounces per short ton) of gold. This world-class ore
limestones of the Laizhishan Dome. The Jinfeng body has an underground grade of 5.7 grams per
orebody is a structurally controlled gold deposit with tonne (0.18 ounces per short ton), and the mine has
some replacement style mineralization. a potential life of 15 to 20 years.

The deepest drilling at Jinfeng has intercepted Drilling of this deep zone from surface was
strong gold mineralization and intense alternation completed in early 2008. A 600-meter (1,970-foot)
at more than 1000 meters (3,280 feet) depth. This hole targeting the down dip extension of the main
deep, down-lunge zone has now been followed mineralization is currently under way. Testing for
to near the contact of the Triassic sediments further down plunge extensions to the orebody
and underlying Permian limestones, which is is planned to resume in 2010, possibly from an
considered very prospective for gold deposition. underground drive.

Cat Global Mining / Viewpoint 17


Accelerating development Jinfeng produced 166,828 gold
ounces at a cash operating cost
In April 2001, Sino Gold Mining, Ltd. earned an
of US$405 per ounce. Ore is
82 percent interest in the project for the staged
currently being mined from the
payment of US$800,000 and a commitment to bring
Jinfeng open pit with the use of
the deposit into production. In late 2009, Vancouver,
a mining contractor and the new
Canada-based Eldorado Gold Corp acquired
development of the underground
Long Haulage Sino Gold to form the leading international gold
vs. Hoisting mine. Jinfeng’s production is
exploration and mining company in China. With
planned to increase as higher-grade ore from the
The Jinfeng mine uses the the acquisition, Eldorado now has three operating
decline haulage method, underground mine increasingly supplements ore
shown in the left illustration.
mines in China: the Tanjianshan, Jinfeng and White
from the open pit.
A downward spiral tunnel Mountain mines.
circles either the flank of the
deposit or circles around the When working at full capacity, the underground
Eldorado is active in exploration and development
deposit. This newer method of mine is expected to operate on three main levels,
access may eliminate the need in Brazil, China, Greece, Turkey and surrounding
for hoisting shafts because with each level providing approximately 400000
regions. The company has set a goal to produce over
workers, equipment and ore can tonnes (441,000 short tons) of ore.
be transported via trucks and/ 28300 kilograms (1 million ounces) of gold annually
or conveyor belts. The more by 2013. As one of the lowest cost gold producers—
traditional hoisting method, Accessing the underground mine
shown at right, uses a shaft—a one with a strong balance sheet—analysts say the
vertical excavation sunk company is well positioned to grow in value with the Eldorado Gold has used an Australian/Canada
adjacent to the ore body. mining model at other sites, and has reproduced it
The hoist and cage provide creation and pursuit of new opportunities like those
access to the shaft station, in China. at the Jinfeng underground development. This is
where workers, equipment the first example of this type of mining in China,
and ore are transported. VENT VENT
with the company’s White Mountain underground
HOIST development being the second. The model’s main
feature is the use of a large haulage decline.
OPEN PIT OPEN PIT

RAMP
The mine is accessed via a 5.5-by-5.5 meter (18-by-
ORE BODY ORE BODY 18 foot) haulage decline and its gradient is averaged
at 1 in 8. To date, 1.7 km (1 mile) of the decline has
been developed and it will be extended to over 5 km
(3.1 miles). Traditionally mines in China prefer the
shaft hoisting ore handling method. While decline
haulage is common in many underground mines, it
is not common in China.
DRAW
POINT
Chief mining methods at Jinfeng underground
SHAFT
are overhand and underhand cut-and-fill methods.
Initial mining of ore was from the Jinfeng open pit, When fully developed, the underground production
with 0.7 million and 1.4 million tonnes (0.8 and 1.5 capacity will reach 1 million tonnes (1.1 million
million short tons) of ore mined in 2007 and 2008 short tons) per year.
respectively. Ore is now being sourced concurrently
“We’ve been able to consistently achieve a decline
from the open pit and the underground mine, with
advance rate of over 150 meters per month,” says
1.2 million tonnes (1.3 million short tons) of ore
Dr. John Chen, manager of mining technical
mined in the first nine months of 2009.
services for Eldorado Gold. “We give credit to our
In 2007, Jinfeng produced 56,981 gold ounces efficient mobile fleet for helping us meet this high
and in 2008 it produced 150,928 gold ounces at a production target.”
cash operating cost of US$400 per ounce. In 2009,

18 Cat Global Mining / Viewpoint / issue 6


Both the Jinfeng and White Mountain mines use A Caterpillar team provided on-site operator A team from Caterpillar and
Cat dealer ECI-Metro spent
Cat underground equipment. Jinfeng operates Cat and service training for both the dealer and several days evaluating operator
R2900G and R1700G Load Haul Dump loaders and customer as the machines were the first Caterpillar performance in an effort to
reach the optimum cycle time at
AD45B trucks, purchased from China Cat dealer Underground units in China. This training was also Jinfeng’s new underground site.
ECI-Metro Engineering Machinery Co. Ltd. followed up in June with a site study, production
study and Fleet Production & Cost (FPC) Analysis
The AD45B and R2900G were delivered to the
and an operator review.
Jinfeng site at the beginning of March 2008 and
started work March 5. At the end of January 2010, Improving cycle times
both units had clocked over 10,000 hours, averaging
Continuous Improvement is an aspect of every
nearly 458 hours per month. The site also took
relationship between Caterpillar, Cat dealers and
delivery of an R1700G and AD45B in early 2009 and
their customers. A variety of processes are use to
another R1700G in late 2009. Another AD45B will
identify, implement, track, measure and replicate
be delivered to the site this year.
value-added activities.
“This fleet is on target to reach 5,500 hours for
“We don’t just build machines,” says de Haan.
a 12-month period,” says Ron de Haan, a senior
“Along with the dealer, we do all we can to make
product specialist for Caterpillar Global Mining,
sure our customers get the most from their Cat
based in China. “For a mine that is currently
equipment and get their cost-per-tonne to the
undergoing development, this is a great example
lowest level possible.”
of best practices.”
For example, during an operator review, a team
The AD45B trucks were selected to help meet
from Caterpillar, ECI-Metro and the mine conducted
production targets, while the R1700G is used to
a study of operator performance and provided
muck horizontal development and ore headings.
additional training where required. Their goal was
“We have really benefited from to lower cycle times.

buying Cat equipment—in “We spent several days traveling underground and
particular due to the support of viewing the operators working,” says de Haan.
“Trainers from the mine owner also accompanied
our dealer,” says Chen. “From us and gained a firm understanding of how the
training to parts availability, machines should be operated.”
the partnership with Caterpillar The study showed that operator skill was good,
and our dealer has truly helped with only a few small improvements needed to
get the optimum cycle time. The team suggested
make this venture a success.” a small improvement in the decline and also first
With warehouses in Singapore, Shanghai and a bucket readiness to reduce loading times and truck
number of cities in China, spare part availability cycle times.
and services have met or exceeded the mine’s
expectations, Chen says.
Cat Global Mining / Viewpoint 19
“All the areas we visited were in a conventional CIL circuit. In order to extract
gold at economic recovery rates, the Jinfeng gold
new developments, which makes processing plant was designed and constructed
it difficult to have consistent cycle using BIOX® technology, a process that has been
times,” says de Haan. “Now that available commercially for more than 15 years.
Rights to the technology are currently held by
the mine is in full production, Biomin Technologies SA, a subsidiary of Gold
the operation can be fine-tuned Fields Ltd.
to get the optimum cycle times. The BIOX process, which pre-treats refractory

INCORRECT LOADING The first key items to review sulphide gold ores such as pyrite, arsenopyrite and
pyrrhotite, was developed to increase gold recovery
CORRECT LOADING
would be truck placement and rates during the metallurgical extraction process.
loader efficiency.” The gold in these sulphide ores is encapsulated
Sites can achieve faster cycle times in a number in sulphide minerals which prevent the gold from
of ways, including improving floor conditions and being leached by cyanide. The process destroys
material condition, correcting the orientation to the the sulphide minerals and exposes the gold for
face and truck placement, and ensuring the proper subsequent cyanidation, increasing recovery rates.
tram distance to and from the truck.
Caring for people and communities
“We found load placement was good and material
INCORRECT LOADING As foreign companies like Eldorado move into
sizing was excellent,” says de Haan. “The load cycle
CORRECT LOADING China, they take great care in recognizing the
time was increased by about 20 seconds by the
impact they will have on the communities there.
operator patting the load down on the final load—
a practice that we pointed out was not required as Eldorado Gold recognizes that its existence
the haul road has plenty of clearance.” as a company depends on the goodwill of the
community within which it operates. The company
The team found the haul roads were in good
is committed to seeking any opportunity to bring
condition but suggested cycle times could be
benefit to communities—from exploration to
improved by removing any uneven areas in the
CORRECT LOADING
main decline, changing the camber on some of the
corners so that they are slightly banked, and putting
Over-loading, or off-centered
loading, can cause spillage down a firm aggregate base where there is tire
from the sides as the truck
penetration of more than 25 mm (1 inch).
goes around corners and from
the back as it climbs grades.
“Now that the mine is in full production, we’d like
to conduct another site study to see how we can give
them even more value from their Cat equipment,”
INCORRECT LOADING
CORRECT LOADING says de Haan.

Processing the gold

Both the open pit and underground ores are


stockpiled at the ROM pad near a surface crusher
station. A loader is used to muck ore from the
stockpiles to the crusher.

Jinfeng ore is refractory in nature, with the majority


of gold encapsulated in sulfide minerals. As such,
INCORRECT LOADING the gold is not readily amenable to dissolution
CORRECT LOADING

20 Cat Global Mining / Viewpoint / issue 6


development, to construction and training, to Eldorado is also committed to protecting the
mining and processing and finally reclamation environment. Activities like continually monitoring
and closure. the quality of air, water and soil at Jinfeng are a high
priority. The company also implements programs to
Site development includes infrastructure initiatives,
preserve biodiversity, monitor noise and dust levels
such as improving roads, building sewage systems
and adopt waste reduction and recycling programs.
and building water wells, according to the needs
of the communities. Eldorado makes it a priority The commitment continues once a mine is no
to hire local residents, training all employees and longer profitable to operate. The mine is closed
instructing construction contractors in the best and reclamation activities are conducted so that the
environmental, health and safety practices. physical environment can successfully transition to
a productive ecosystem.
Eldorado Gold provides on-the-job training and
works with local technical schools and universities Looking toward the future
to enhance their mining-specific programs to help
Jinfeng’s gold production is planned to increase
increase employability. Safety is also a priority, with
as higher-grade ore from the underground mine
a focus on making sites safe, buying equipment
increasingly supplements ore from the open pit.
with a strong safety record, and making sure
When working at full capacity the underground
employees are trained in safe practices on an
mine is expected to operate on three main levels,
ongoing basis.
with each level providing approximately 400000
Competitive salaries and benefits paid to tonnes (441,000 short tons) of ore. Developing
employees and contractors improves their families' the underground mine will provide the capacity
standard of living. In addition to job creation, to deliver in excess of the nominal 1-million-tonne
Eldorado promotes many sustainable economic (1.1-million-short-ton) annual design capacity of
development initiatives. Since the life of any mine the plant. Jinfeng operates Cat R2900G
is limited, the company encourages and works and R1700G Load Haul Dump
loaders and AD45B trucks,
with local communities to create new opportunities purchased from China Cat
for economic development, even after the mine dealer ECI-Metro Engineering
Machinery Co. Ltd.
is closed.

Cat Global Mining / Viewpoint 21


As the demand for mined minerals increases, everyone—from students to miners,
governments to global corporations—must understand how to work together to meet those
needs while protecting the world in which we live. Caterpillar and Science North recently
produced a new film to raise awareness of all that the mining industry is doing to operate
sustainably and to highlight the importance of mined materials in everyday life.

FILM SHOWCASES COMPANIES THAT ARE

MINING RIGHT
EXPLORATION
in papua, indonesia: chapter 1

Years of systematic groundwork led geologists


for PT Freeport Indonesia to the remote
“Ground Rules: Mining Right for a Sustainable highlands of Papua, where they are engaged in
Future” features mines in countries on almost a classic treasure hunt in search of a deposit
of precious minerals. Advanced imagery 1
every continent—Australia, Canada, Chile, Ghana,
Indonesia and the United States. It follows the tools allow them to “see” inside the rock by 1/ A geologist in Indonesia
development of new and operating mines as examining its magnetism, chemistry and uses core samples to
explore new areas.
geologists, engineers and mine managers tackle structure. Piece-by-piece, a picture of the
2/ Minera Spence in Chile’s
complex problems and draw on the experiences geology beneath the jungle is revealed. Atacama Desert is a model
of modern mining.
and achievements of other mine sites to illustrate
3/ T
 he typical home is filled
creative and core concepts of sustainable
MODERN with mined materials.
development and social responsibility.
MINING
“We’re proud to be part of an industry that is in Chile’s Atacama Desert: chapter 2

making such great strides environmentally and


Chile’s Atacama Desert is one of the driest
socially,” says Philip Kelliher, the Caterpillar
places on earth, and home to some of the
regional mining manager in Latin America. “This
planet’s greatest copper deposits. BHP Billiton
new generation of mining professionals is doing
extracts this copper at Minera Spence, a
impressive work, and it has been our privilege
mine that is a model of how a modern mine 2
to capture their stories and share them with the
should be run. The mine produces about 2
world. We’re also excited by the opportunity to
200000 tonnes (220,462 short tons) of copper
educate school children about the importance
every year, destined for markets around
of mining to our world and the steps mining
the world, where it will be used in wiring,
companies take to preserve the environment and
pipes, electronics, and thousands of other
help the communities where they operate.”
applications.

An important contributor to the worldwide


demand for copper, Minera Spence is
equally important to the people of the nearby
community of Sierra Gorda. The mine focuses
on sustainable operations that protect the
environment and has developed a culture of
safety and teamwork for the workers, many of
whom were born and raised in Sierra Gorda.
3

MINING AND THE


MODERN WORLD
in a typical home: chapter 3

A quick glance around a typical home in any


developed city reveals just how many minerals
are used in our everyday lives—all of them
extracted from mines around the world. From
wallboards and paint, to plastics, electronics
and even toothpaste—nearly everything is
connected to mining.
Cat Global Mining / Viewpoint 23
ENGINEERING
CHALLENGES
in Papua, Indonesia: chapter 4

As Grasberg mine in Papua, Indonesia, continues


to tackle the engineering challenges of this remote
part of the world, owner Freeport McMoRan is
also committed to developing the local human
resource—the Papuans themselves. At the
Nemangkawi Mining Institute, Papuans receive
1 the skilled training required to operate the mine,
1 particularly at extreme elevations. New operators
1/ Operators receive comprehensive training train on custom simulators that teach them the
to prepare them to work in the challenging
elevation of Grasberg mine in Indonesia. techniques needed to be more productive and keep
2/ T
 he discovery of additional ore has led to themselves and other workers safe.
an expansion of the Creighton underground
mine in Canada.

3/ Newmont Mining is committed to creating


immediate opportunities and lasting benefits GOING UNDERGROUND
to the people in the Ahafo region of Ghana. in Sudbury, Canada: chapter 5

Workers at the Creighton mine in Sudbury, Canada,


know all about the challenges of underground
mining. Since the first deposit of nickel was
discovered there over a century ago, hundreds of
underground mines have been dug into the hard
rock of the Sudbury Basin, creating a community
that is founded on the nickel beneath its feet.
Creighton is now one of the deepest mines in the
world and one of the most modern.

Yet, even after a century of mining, geologists


believe there is still more ore to be found. At
an advanced underground exploration station,
geologists and geophysicists are using sophisticated
tools to look deeper into the rock. If all goes
according to plan, the new underground expansion
will double the amount of ore in the mine, adding
many more years of productivity.

MINING AND THE


2 COMMUNITY
in the Brong Ahafo region of Ghana: chapter 6
2

When Newmont Mining introduced mining to the


Ahafo region of Ghana, the company knew its most
important job was to show the local people how they
would benefit from the mine. Newmont learned that
the key to a successful project was to communicate
regularly with the community, to be transparent,
3 3 and to listen to the peoples’ concerns.

To make sure locals could qualify for work at the


mine, Newmont established training and education

24
programs. At the same time, Newmont and the the mine on the water, the surrounding land, and on
community started working on a way to foster long- the spirit of the river itself.
term benefits that would outlast the mine itself. In
Xstrata studied the biodiversity of the river so that
partnership with Ghanaian and non-governmental
the new channel would be as close as possible to
organizations, the Livelihood Enhancement and
the river’s natural state. Working with local experts,
Empowerment Program called LEEP was created.
native plants and seeds were collected and cultivated
At LEEP, people learn skills not directly related to
for planting in and around the new channel. The
mining, with the goal of diversifying the economy.
new river bed was carefully sculpted to create the
The health of the community was also an important
unique ecosystems that are found in a natural river,
consideration. HIV/AIDS and malaria are very real
including snags made of boulders and tree trunks. 4
concerns in this area, so projects that help bring 4
The water is monitored constantly by Xstrata and by
resources to local health clinics, malarial nets
governmental and non-governmental agencies, and
into households and educational resources into
the results communicated to the public.
communities create lasting benefits.

RECLAMATION
MINING AND THE in Wyoming’s Powder River Basin: chapter 8
ENVIRONMENT
in North Australia’s rugged outback:
In Wyoming, USA, Arch Coal’s Black Thunder
chapter 7
4/ A new river bed at McArthur
operation is mining some of the largest coal seams River mine in Australia was
Around the world, mining companies like Xstrata in the world. The scale of the operation is huge; carefully sculpted to create the
unique ecosystems found in a
are going to extraordinary efforts to evaluate, in fact, this one mine produces almost 9 percent natural river.
monitor and minimize the impact of mining on of America’s coal. The seam that Black Thunder is 5/ S
 ite reclamation was planned
even before the opening
the environment. The zinc deposit at its McArthur mining is buried under nearly 60 meters (197 feet) of Black Thunder mine in
River mine in Northern Australia’s rugged outback of earth and rock that must be removed to access Wyoming, USA.

lies directly below the riverbed. When the river the coal. That overburden is eventually used in the
re-channeling was first proposed, the biggest restoration process, carefully planned out before the
issue was whether it could be done in an mine was even opened, and future
environmentally responsible way. Many generations will barely know a
aboriginal groups live along the river, and mine was ever here.
there were concerns about the effects of

5
5

Teaching new
generations modern mines can operate safely
and sustainably, and why minerals are
In addition to co-producing
important to our everyday lives. This
Ground Rules, Caterpillar
material also introduces students to a wide variety of
commissioned a set of 75 lesson
mining careers.
plans to help educators further examine the themes
and concepts presented in the film. All of the lesson plans have strong links to the
earth science curriculum, but many of the activities
“We’re encouraging everyone in the mining industry
incorporate additional connections to math, chemistry,
to view the film, then share it with their communities
data management, mapping, environmental studies,
and encourage teachers and schools to take advantage
electricity, magnetism and problem-solving. Materials
of the free curriculum,” says Charlie Zimmerman, a
were developed for three age ranges, 11 to 13, 13 to 15,
Caterpillar marketing representative.
and 15 to 18.
A series of hands-on classroom activities introduce
Visit www.cat.com/groundrules to view the film
students to a number of mining topics, including the
online, request a free DVD, or download the free
phases of mining, different types of mines, how ore is
educational materials.
processed, how mineral deposits are formed, how
Cat Global Mining / Viewpoint 25
Visibility is always an important topic on a mine site. And when
you’re a machine operator—sitting three stories high in a large
mining truck—the importance becomes a matter of life and death.
Using a combination of site design and To date, one of the only ways to protect
available technologies, mining companies against collisions in the blind areas of a
take advantage of every option for increased truck has been procedural barriers—like
visibility for operators and others on site. no-go zones for light vehicles, standard
One of the primary scenarios where lack parking and start-up procedures, and
of visibility can be a dangerous problem is audible reversing alarms that warn those
stopped trucks, such as when they are at nearby. But even with these procedures in
the dump site or just beginning start-up. place, the problem of slow speed collisions
has not been eliminated.
That’s why operator visibility is high on
the list of safety initiatives for mining An improved approach is to provide
companies. In fact, visibility is one of the enhanced driver vision supplemented by
top 15 priority areas identified by the Earth an automatic detection system that looks in
Moving Equipment Safety Round Table— all high-risk directions at once, identifies
a group of leading mining companies that potential problems and attracts the driver’s
joined forces to encourage equipment attention to those areas where potential
manufacturers to improve the design of collisions could occur.
equipment in order to minimize health
LOOKING FOR A TECHNOLOGY SOLUTION
and safety risks.
“Every year we interview our mining
Limited visibility is a potential cause for
customers and every year that tell us that
many types of collisions—a truck hitting
safety is their number one priority,” says
another from behind, a vehicle moving into
Edwards. Several years ago, Caterpillar

object
an oncoming lane, sideswiping or turning
brought in four of its mining customers
into the path of a machine while passing,
and gathered data on over 300 accidents
and one of the most common: slow speed.

detection:
from their mine sites. The data showed that
Slow speed collisions occur when a over half of those accidents could have been
machine is in a loading area, maintenance avoided by the use of technology to help
area or fueling station, and it reverses, operators see what’s in their blind spots.
Making mine sites safer turns or pulls forward into a light vehicle,
“Our customers want to make sure
by reducing blind spots heavy equipment or structure.
operators and all personnel on their sites
“When you’re starting up a machine, it’s go home safely at the end of every shift,”
what you don’t see that should concern says Edwards. “As a leading manufacturer
you the most,” says Ken Edwards, Health, providing equipment to them, it’s our
Safety, Environment and Community challenge to work with them and help
Manager in Caterpillar’s Global Mining them to deliver on that goal.”
Division.
So Cat engineers set out to determine what
Large machines, like mining haul trucks, technologies could be developed to help
have equally large operator visibility blind avoid slow speed collisions. After reviewing
spots. Once an operator climbs into the cab, a number of possibilities, including
he or she may be unable to see if another RFID tagging and sonar technologies,
machine, vehicle, or a person on foot enters the company determined that the use of
one of these blind spots, creating potential cameras and radars would provide the
safety hazards.
26 Cat Global Mining / Viewpoint / issue 6
FEATURES OF THE CAT Integrated
best solution. The result is the new Cat® are similar systems for drills, shovels and Object Detection SYSTEM
Integrated Object Detection System™. competitive trucks. Durability. The Cat system was built for mining
The system enhances haul truck operators’ customers and the rugged environments in
HOW IT WORKS
which they operate.
awareness during the critical period when
they are starting their truck and during the The Cat Integrated Object Detection System Integration. The self-contained Cat system

first several seconds of movement. The consists of an interactive, color, touch is integrated into the machine onboard
screen display in the cab; four short-range system and tied into Cat data link. This allows
system consists of a touch screen display,
radars in the front and rear of the machine; the machine system and electronics to pick
short range radar (up to 7 meters / 23 feet), up and feed information into the Object
medium range radar (up to 20 meters / 66 medium range radars on all four sides; and
Detection System.
feet) and cameras on the front, rear and cameras on all four sides.
Ease of use. The system starts up when the
sides of the machine. At startup and whenever a truck stops for a machine starts up, so no operator interaction
“Our goal was to take advantage of multiple set period of time, the touch screen display is required. The intuitive touch-screen display

technologies integrated with each other alerts the operator when objects have can be customized in multiple languages.
entered critical areas around the machine. Operator quick-reference cards and online
and the mining machine to provide as few
The radar view provides a visual indication tutorial make learning the system easy.
inputs to the operator as possible,” says
of where the objects are relative to the Convenience. There are multiple operator
Steve Rieker, marketing supervisor in the
machine. Objects in the front, rear or side display mounting locations—in the head liner
Electronic and Machine Systems Division
or instrument panel. The display is dimmable
of Caterpillar. “Radar and cameras were the critical zones, or the truck’s turn radius, will
and adjusts brightness automatically.
best choice in our opinion.” cause that zone on the display to blink red.
Multiple alert levels. The Cat system provides
Radar is considered the most robust An audible alarm sounds when an object multiple alert levels to give operators flexibility
technology to address the greatest number has been detected and if the operator has and to ensure that detected objects are indeed

of scenarios because it works at night not acknowledged it when the machine is recognized.

and can see through rain, dust and snow, placed in gear. The “Caution Zone” warning is active when an
says Rieker. “By partnering the radar with object has been detected in the caution zone.
The system remains active through 20
The audible warning alarm is not active and the
cameras, we have vision and detection meters (66 feet) of start-up travel; the
operator is not required to acknowledge this
functionality in one. And unlike RFID system is always on when the truck is
warning in order to avoid an audible alarm.
systems, our technology does not require traveling in reverse. Once the truck is safely
The “Critical Zone” warning is active when
the object being detected to be tagged—an moving, the radar system enters standby
an object has been detected in the critical
issue our customers told us they didn't mode while the cameras remain active. zone. The audible warning alarm is not
want to manage.” active; however, the operator is required to
“Of course, using the system does not
The system was introduced at Caterpillar’s acknowledge this warning in order to avoid
replace the basic safety precautions that
an audible alarm.
Tinaja Hills Demonstration and Learning operators should follow every day,” says
Center in Tucson, Arizona, USA, in fall An audible alarm will become active in the
Rieker. “But we believe this can have a
event the operator has not acknowledged a
2009 and is available now as a retrofit significant impact on making mine sites
Critical Zone warning, places the machine in
system for existing Cat 785-797 mining safer for everyone.”
gear, and attempts to move in the direction of
trucks. In mid-year 2010, the system will
Caterpillar considers object detection one the detected object.
also be available as a retrofit for the new
of the building blocks for what it sees as the Scalability. The system allows the user to start
F-Series large mining trucks, and will come
future of mining—autonomy. That vision with a vision system and later upgrade to the
factory-fit for D- and F-series large mining full detection system.
goes beyond haulage to bring together
trucks in early 2011. The future could see
various mining systems to create a fully- Cat support. The system will be sold, serviced
the system offered for other large trucks, and supported by the Cat dealer network,
integrated, autonomous mine site, where
wheel loaders, motor graders, articulated with parts available through the global parts
every piece of equipment “knows” the
trucks, large track-type tractors and distribution network.
location and status of every other—and
hydraulic excavators. Under consideration For more information visit cat.com/objectdetect
where mine managers can see and control
the entire site.
Cat Global Mining / Viewpoint 27
777F at work in Colombia

Caterpillar produces
50,000th off-highway truck
In 2009, Caterpillar produced its 50,000th rigid- Colombia. This was the 112th 777 truck delivered
frame off-highway truck out of its facility in Decatur, to Prodeco, which recently expanded its haulage
Illinois. Representatives from Prodeco group, which fleet with 61 new 777F trucks and 22 new Cat 789C
purchased the truck, and Cat dealer Gecolsa were trucks. Colombia’s fastest growing coal exporter, the
on hand to celebrate as the truck was completed. Prodeco group produces high quality steam coal.
Today, the 91-tonne (100-short-ton) capacity 777F The group’s all Cat fleet receives full support from
is hard at work at Prodeco coal operations in Cat dealer Gecolsa.

28 Cat Global Mining / Viewpoint / 2010: issue 6


New engine technologies Specialized chassis designed Simformotion™ to deliver
will meet Tier 4 standards for water trucks simulator solutions
Caterpillar recently unveiled its Tier 4 Interim/ Caterpillar recently began offering specialized Caterpillar has reached an agreement with
Stage IIIB engine technology, which includes chassis to improve performance and customer Simformotion LLC to deliver operator training
an integrated system design built upon the satisfaction for customers in the water truck simulator solutions to heavy equipment owners
success of the company’s ACERT technology. market. The first Water Truck (WTR) models to and training organizations. The company will
Additional technologies, including powertrain be offered are the Cat 773F WTR and 777F WTR develop, manufacture and distribute Caterpillar
innovation and after-treatment devices, will be Off-Highway Trucks and the 785D WTR Mining branded operator training simulator products
specifically tailored and applied to products Truck. Caterpillar supplies a table of suggested through its Morton, Ill., USA, headquarters.
to meet the stringent emission requirements sizes for water tanks, which are available from Simformotion is an affiliate of CSE Software,
required by law. The project is one of the most various tank manufacturers around the world. which offers integrated Information Technology
aggressive product development initiatives in services for clients worldwide. Caterpillar
Caterpillar history and is necessary to meet MineStar™ FleetCommander Equipment Training Solutions has been
new U.S. Environmental Protection Agency features upgrades developing and building personal simulators
and European Union standards that require Caterpillar recently released FleetCommander for heavy equipment training since 2004.
emissions of particulate matter and oxides 3.0, which includes software and hardware This agreement will result in an expansion of
of nitrogen to be reduced by more than 90 updates that expand capabilities for the Cat simulator product line.
percent. Caterpillar estimates the new engine improving day-to-day mine site operations.

news
technology will accumulate nearly one million This comprehensive surface mine
hours of testing by the end of 2010.

From
monitoring and control system
uses technology to improve
New company in China to productivity and lower costs. Real-
provide remanufacturing time interaction with mobile field
Caterpillar (China) Investment Co., Ltd. And equipment allows mine managers

caterpillar
China Yuchai International Limited, through to improve machine utilization,
its main operating subsidiary, Guangxi Yuchai manage operators, track material
Machinery Co., Ltd., have signed a joint-venture movement and monitor production
agreement to establish a company that will in near real-time. Operations that
provide remanufacturing services for Yuchai have switched from manual control
diesel engines and components and certain to FleetCommander typically have experienced Caterpillar joins clean-coal
Cat diesel engines and components. The new a 10- to 15-percent productivity improvement. partnership
company will provide remanufactured engines FleetCommander 3.0 builds on these proven Caterpillar recently announced its intent to
and components to its customers worldwide results with an additional 5 percent productivity join the FutureGen Alliance, a public-private
by leveraging remanufacturing technology improvement compared to previous versions. partnership established to build a first-of-its-
through the Caterpillar Remanufacturing and kind coal-fired, near-zero emissions power
Sustainable Solutions Division, Cat Reman. The Gateless coal body boosts plant in Mattoon, Ill., USA. The facility is
joint venture will be the first remanufacturing productivity designed to be the cleanest coal burning
joint venture for Caterpillar in China. A new gateless coal body designed for the plant in the world and will integrate advanced
Cat 777F mining truck significantly enhances technologies for coal gasification, electricity
R&D facility will support performance in coal applications, while production, emissions control, carbon dioxide
operations in Asia Pacific eliminating the many disadvantages of bodies capture and permanent storage and hydrogen
Caterpillar recently opened a new multi- that are field-modified to increase capacity. production on a commercial scale.
functional research and development center This body joins a family of coal-specific bodies
in Wuxi, Jiangsu province to support growing available for the Cat 785, 789 and 793 mining Mining trucks travel across
operations in China and the Asia Pacific region. trucks. The gateless body combines a robust Gobi desert
The Wuxi R&D center will focus on engine and understructure with a floor that angles upward After a journey of thousands of kilometers
component product and process development, toward the rear for nearly two-thirds of the across the United States, the Pacific Ocean and
validation, localization and technological body length. The precise geometry of the China, two Cat 785C mining trucks reached
training. Among its many functions, the new floor positively retains the load and results the border of Mongolia, where they then began
center will have an engine test facility with in hauling target payloads consistently with the most difficult portion of their trip: across
performance and emissions development minimal spillage. In addition, the relatively low the wilds of Gobi desert. Wagner Asia, the Cat
capability, an advanced materials laboratory, an height greatly increases loading efficiency for dealer in Mongolia, assembled the trucks upon
electronics laboratory, a system and machine faster cycles. their border crossing into Mongolia. It then
integration facility and validation capability. took 48 hours of driving across the desert to
deliver them to Ukhaakhudag, a coal mining
project near Tavan Tolgoi in Mongolia. A month
later, three other trucks followed the same
» For more Caterpillar news, route, and more are slated to follow.
visit www.cat.com
Cat Global Mining / Viewpoint 29
Viewpoint is published in English, Spanish,
Portuguese and Chinese. Text-only versions of
many articles in Chinese, French, Portuguese,
Spanish and Russian are available at www.cat.
com/viewpoint.

Viewpoint es publicado es Inglés, Español,


Portugués y Chino. Versiones de varios artículos
en Chino, Francés, Portugués, Español y Ruso
están disponibles en texto únicamente en www.
cat.com/viewpoint.

杂志采用英语、西班牙语、葡萄牙语和汉语发表。

汉语、法语、葡萄牙语、西班牙语和俄语的纯文
字版本可从www.cat.com/viewpoint网站获取。

Viewpoint est publié en anglais, espagnol,


portugais et en chinois. Les versions texte-
seul de plusieurs articles sont disponibles en
chinois, français, portugais, espagnol et en
russe sur www.cat.com/viewpoint.

Viewpoint é publicado em Inglês, Espanhol,


Português e Chinês. Versões somente em texto
de vários artigos em Chinês, Francês, Português,
Espanhol e Russo encontram-se disponíveis no
site www.cat.com/viewpoint.

Журнал Viewpoint издается на английском,


испанском и китайском языках. Переводы
текста журнала Viewpoint на китайском,
французском, португальском, испанском и
русском языках можно найти на сайте www.
cat.com/viewpoint.

For a free subscription, please e-mail your


contact information to viewpoint@cat.com

www.cat.com

© 2010 Caterpillar | All Rights Reserved | Printed in USA

CAT, CATERPILLAR, their respective logos, “Caterpillar Yellow”


and the “Power Edge” trade dress, as well as corporate and
product identity used herein, are trademarks of Caterpillar and
may not be used without permission.

AEDQ0049