You are on page 1of 7

SDMM/MWD/JAR DAILY R

(REPORT CYCLE FROM 01-03-2024 06:00 HRS TO 02


Contract No.: VDA/BRD-ONSG/919980/BN6PC22004/
Date 01 March 2024 Client ONGC
Job No UE12 Well Name MKAF
Kit # SET #2 Area MEKEYPORE
Report No 32 Rig name E-1400-VI
UEEPL REPRESENTATIVES
ONGC REPRESENTATIVES MR. S.K DUTTA MWD Rep. MANORANJAN GOGOI
ONGC DIC M.R BASUMATARY / K.KAMAN MWD Rep. VIKASH KUMAR

HOLE DATA PUMP/MUD DATA


Hole Size 12.25" Bit Jets MP#1 MP#2
Max. Angle 27° P MWD Pump Make BPCL BPCL
PDD 138° P Motor Duplex/Triplex TRIPLEX TRIPLEX
13 3/8" C/SHOE 2000 M P Bit Stroke/Liner 12/6.5 12/6.5
Planned TD 3000 M P Total SPM
Hole Temp SPP Flow Rate(GPM)

BHA COMPONENT SERIAL # LENGTH TOTAL From To Rig


06:00 C/O PJSM.
M/A FOR R/IN.
R/IN BIT+ BIT SUB+ (01) SGL 8'' D/C+ 11 3/4
(02) STDS 6 1/2'' D/C + (01) SGL HWDP + D/
OBSD. H/UP @ 2754 M. M/UP KELLY, CLEAR
18:00 AGAIN R/IN (01) STDS D/P FOUND HELD UP
18:00 C/O PJSM.
CONTINUED W/DN FROM P/SHIFT, OBSD H
2800 M TO 2860 M. MEANWHILE P/UP 5 NO
00:30 OBSD MUD CUT IN 1 D/P SGL & REPLACE T
00:30 03:30 C&C MUD PRIOR TO W/TRIP.
03:30 M/A FOR P/O. P/O 30 STDS + 2 SGL 5" D/P.
18:00 CLEARED THE SAME. HOLE FILL CONTINO
Depths: HRS MWD Tool SDMM JAR MWD BRT
Start: BRT 0.00 BRT 0.00 BRT 20.00 SDMM BRT
End: Circ. 0.00 Circ. 0.00 Circ. 8.00 D-Jar BRT
Meters: Cum Circ. 0.00 Cum Circ. 0.00 Cum Circ. 8.00 MWD ART
Drill Hrs SDMM ART
Cum Drill D-Jar ART
COMMENTS

UEEPL Representatives ONG

RAHUL BAISHYA / NURALAM AHMED MANORANJAN GOGOI / VIKASH KUMAR M.R BAS

OPERATING STANDBY ZERO


MWD 0.00 24.00
SDMM 0.00 24.00
JAR 20.00 4.00
DMM/MWD/JAR DAILY REPORT
YCLE FROM 01-03-2024 06:00 HRS TO 02-03-2024 06:00 HRS)
: VDA/BRD-ONSG/919980/BN6PC22004/9030011134/2022-23

UEEPL REPRESENTATIVES
DIR Rep. RAHUL BAISHYA
DIR Rep. NURALAM AHMED

Density
PV/YP
Sand
Solids
Viscosity
pH
Fluid Type

Rig Activity
PJSM.
FOR R/IN.
N BIT+ BIT SUB+ (01) SGL 8'' D/C+ 11 3/4'' STAB+ (02)SGL 8'' D/C + X/O +
STDS 6 1/2'' D/C + (01) SGL HWDP + D/JAR+ (10) SGLS HWDP +(90) STDS 5'' D/P.
SD. H/UP @ 2754 M. M/UP KELLY, CLEARED THE SAME.
AIN R/IN (01) STDS D/P FOUND HELD UP @ 2774 M. M/UP KELLY.
PJSM.
NTINUED W/DN FROM P/SHIFT, OBSD H/UP WHILE W/DN. REAM DN FROM
0 M TO 2860 M. MEANWHILE P/UP 5 NOS 5" D/P FROM PIPE RACK & OBSD MUD CUT IN 1 D/P SGL & REPLACE TRHE SAME
SD MUD CUT IN 1 D/P SGL & REPLACE TRHE SAME
C MUD PRIOR TO W/TRIP.
FOR P/O. P/O 30 STDS + 2 SGL 5" D/P. OBSD H/UP AT 2855 M & 2780 M.
EARED THE SAME. HOLE FILL CONTINOUSLY.
RUN#6 BRT@10:00 HRS ON 01-03-2024
RUN#5 ART@01:00 HRS ON 27-02-2024

RUN#5 ART@21:30 HRS ON 27-02-2024

ONGC Representatives

M.R BASUMATARY / K.KAMAN


S