Operation and Maintenance of Street light system 6.33 500/- 500/ 2% 02
under Bikaner Municipal Corporation area for 02
months including CCMS/Timer panel.
9lo4o2s t o9:30
1. UBN Code :
S5H0G/faya/ 2022-23/|2)2.s-28
Fee Pay 4R
MY.bIlkanerne.org 4 Pay Online Tender 3dQH HINI Online Tender, RISL, EMD
MD RISL, Jaipur
50 I g 5 500/
50 g fec 1000/
10 I g G 500/
10 g 3fe5 1000/
RTPP and GF&AR S.R. 16 afrT HHRT ZI0 tHA ydeT ÀA afL
TA HT, l o (GW) 226906. i- 0151-2226902, 0151--2226905
R
www.bikanerme.org
E-mail :- nagarnigambikaner@gmail.com. Wcb Site :-
1.
T YITIT 3dTIST H4 R AH t o HI www.bikanermc.org y Pay Online
Tender H0QTT GRI Online Tender, RISL. EMD Fee Pay Yr zBT| t T T 30ÍTIS HIH Hr
3.
4.
8
9
10.
11. gdGc FRI AAT yyat Annexure A, B, C, D, and SR-11 Form 9R s yHIfUG yHI haI
yHI (a)
2.
2
3
4
5
4.
5.
1
2
3
9
1
24. h ht H44 Heca ot ER (Indian Electricity Rule) 9II HrT ort gft|
32.
33.
34
35
36.
37.
38.
39
40.
1MUNICIPAL CORPORATION BIKNAER
CONTRACI
SPECIAL TERMS AND CONDITIONS OF
SUMMARY OF WNORK:
has been maintened by Energy
The street light infrastructure of LED Street lights of Bikaner city
period of 7 years is ending on
Efficiency Services Ltd. (EESL) since March, 2015. However the maintenance worklight and phase wire netwoek of
31/03/2023.This tender is being floated to continue the maintenance of street
Bikaner city to avoid any inconvenience to citizens and tourists.
Specifications of work, supplementary information of
0PE OT Work- This Section contains the Scone of work
follows:
proposed works that describe the Works to be procured. The scope of work is as
SCope of
nunicinal area shall include following activities under its
Tne street light maintenance work in Bikaner
Work:
related to submiting joint complaint iS in the scope
" If theft of any street light happens than all the formalities
of Contractor.
" The Contractor shall replace any damaged/burnt jumper on itsown cost.
failure.
" The contractor shallrepair the LEDstreet light irrespctive of cause of
wire system using phase wire. Required phase wire cable
" KemoVing any directly ON LED Street light to phase
for this purpose only shall be provided by Bikaner Municipal Corporation.
as directed by Engineer in charge.
" Replacing burnt jumper with material of standard specification
related staff to trace out fault in existing overhead line
" As per requirement of BMC coordinating with Discoms
and restoring it in working condition by joint patrolling, jumper restoring, etc.
Corporation for complaint registration if
" Setting up aWhatsApp number in the name of Bikaner Municipal
of project.
asked by BMC and provide this number with SIM to BMC on completion
48 hours of intimation.
" Resolving the complaints of non functioning street lights within
system, handling Complaints on
" The contractor shall appoint a supervisor for managing complete street light
daily basis, coordination with BMC and Discom.
experienced wireman and helper) for
" The contractor shall deploy minimum 08 teams (1 team shall consist of
verification of the
street light and phase network maintenance. Monthly payment shall be made only after
teams.
of leave by any team, holiday
" A releiver team consisting of 1wiremam and 1 helper shall be provided in case
or Sunday.
" The contractor shall deploy minimum 01 Manpower for CCMS network maintenance.
Corporation ON daily basis.
" The attendance of deployed manpower is to be submitted to Bikaner Municipal
manpower
" All the tool (Handgloves, ladder, vest, helmet and other tools) and transportation required by the
shall be supplied by the bidder.
" Any death, accident, injury caused to the manpower deployed by the
contractor in this contract shall be sole
liability of the contractor. Bikaner Municipal Corporation shall not be responsible for any death or damage to
manpower deployed under this contract.
point
" Any new lights installed shall be maintained by the contractor for which additional payment on per
basis as per rate obtained in tender will be made.
Terms & Conditions:
1. The bidder shall visit all panels, phase wire system, street light system; instuments related to street light
components of street light system.
2. system.The
The bidder
successful shallshall
bidder submit
taketheover
bid the
only street physicaly
after light verifying all
system (LED Street lights, Phase wire, CCMS/Timer
panels etc.) as it is on day one.
3
Tne contractor must arrange required gualified and insured wireman, neip
4 ESI of the manpower deployed.No seperate
Peo Snall bear the the expense of ineurance PF.
payment shall be made in this regard by BMC. Contractor will not be eligible for
5 at the site.
Contractor will be liable for any type of causality or accident
any type of claim against the BMC.
eligible for any permanent employment on behalf
hy manpower deployed under this contract shall not be
of this contract.
completion of project.
7. Tne Contractor shall hand over all the street lights Panels at the time of
BIKANER MUNICIPAL CORPORATION
Name of Work :- Operation and Maintenance of Street light system under Bikaner Municipal
Corporation area for 02 months including CCMS/Timer panel.
'H-Schedule'
Sr. Item Item Description Qty Units Rate Amount
No. Code
1 Market Providing street light maintenance team consisting of two 7 per team
members including one qualified and experience electricians
Rate per month
and one helper. This maintenance has to take complanits on a
daily basis from nigam office and rectify it with stipulated time
frame. Contractor has to provide tools, ladder, jointing tape.
(07 Teams for 02 Months)
2 Market Providing CCMS maintenance person for complaints received 1 per person
Rate regarding ccms functionality. This person has to receive per month
complaints on a daily basis from nigam office and rectify said
complaints within stipulated time frame.
Total Amount :
I/we agree to do the work as per specification and BMC terms & conditions.
1 F/T accessories ( Non Modular 01 out of 300 Nos. (Total all switch/
all switch/ socket/ regulator etc.) socket/ regulator etc.)
2 Modular accessories (all switch/ 01 out of 300 Nos. (Total all switch/
socket/ regulator etc.) socket/ regulator etc.)
3 FR PVC Flexible Copper 01 out of 5000 Mtr ( Any size as per EE
Conductor ( Total of any Size) required)
4 PVC Conduit ( Total of all sizes) 01out of 500 Mtr. ( Total of all sizes)
5 Steel Conduit ( Total of all sizes) 01 out of 500 Mtr. ( Total of all sizes)
6 Sheet Steel Box/ M.S. Box/ GI 01 out of 200 Nos. ( Total of all sizes)
Box/ PVC Box ( Total of all sizes)
7 MCB ( 1 Pole to 4 Pole) ( Total of 01 out of 100 Nos. ( Total of all amp
all amp rating) rating)
8 DB (SPN to all TPN) 01 out of 20 Nos. (SPN to all TPN)
9 Panel accessories meters/ OEM test certificate required.
switches/relays)
13 All ISI/ BIS/ ISO/ NABL/ ERDA/ CPRI/ ESTA or other certified products in this BSR are
subject to condition of valid certification from these agencies, otherwise use of the
specific product in this BSR will automatically be cancelled for corresponding project.