You are on page 1of 7
Doc. Number : W-PRO-KSL-2-001 CLIENT CONTRACTOR PROJECT NAME PLTU KALIMANTAN SELATAN (2X65 MW) UNDERGROUND GRP PIPE INSTALLATION METHOD. PT. PLN (PERSERO) PT. WUAYA KARYA ~CHENGDA. PLTU KALIMANTAN SELATAN (2 X 65 MW) LOCATION : ASAM-ASAM, SOUTH BORNEO, INDONESIA 2 | 19-3-10 : REV |_DATE DESCRIPTION PREP’D | CHK'D | APP’D £& PLTU KALIMANTAN SELATAN (2X65 MW) GaP Doe. Number : UNDERGROUND FRP PIPE bahetiatchecgad INSTALLATION METHOD: ‘TABLE OF CONTENTS GENERAL REFERENCES MANPOWER, EQUIPMENT AND TOOLS FRP PIPE INSTALLATION Bepe Page Number 20f7 PAGE BeEE Trargraand FAP Pips PLTU KALIMANTAN SELATAN (2x65 mw) oS Doc. Number UNDERGROUND FRP PIPE Page Number Tere ete INSTALLATION METHODS 30f7 1, GENERAL This instruction is to describe installation method of Underground GRP Pipe of Kalimantan Selatan 2x65 MW Coal Fired Steam Power Plant. 2. REFERENCES - Lianyuang Zhongfu Lianzong _: Installation and Burial Of GRP Pipes Manual Composites Group CO., LTD = YG-2906C-8-36 Power Plant Pipe Name List 3. MANPOWER, EQUIPMENT & TOOLS ‘No. | MANPOWER DESCRIPTION Qry ‘UNIT 1 | Rigger 4 Persons Pipe fitter 2 Persons: 3.__[ Supervisor 1 Persons [No EQUIPMENTS TOOLS [TY UNIT 1. | Crawler Crane 50t T set 2.__| Chain block 2 pes 3.__| Lever Block 2 Pos 4,__| Sling belt 2 roll 5,_ | Joint Tester 1 set 6.__| Hand tools T set Cndrgrand PRP Pips PLTU KALIMANTAN SELATAN (265 MW) Doc. Number : WK-PRO-KSL-2.001 aD Page Number 4of7 UNDERGROUND FRP PIPE INSTALLATION METHODS 4, ERP PIPE INSTALLATION 4.1. Preparation Conduct initial inspection of facilities projects to install, the product pipe materials, joint materials and tools when the site, Check Marking FRP Pipe Product and Material if in Inspection there is a problem in pipe product (Ex. broken ), then must be report, in order to improve the suppliers, including raw materials and consumabtres must be reported the stock. Figure 1. FRP Pipe Double O-Ring Joint 4.2. Joint Pipe 1. Prepared and raise pipe will be joint in to ditch with Crane. Clean the pipe gully from dirty. Clean the pipe. Lubricate ‘O' ring with Greale Bring the end of pipe to be in the joint by using crane. ‘The second tie pipe by Shing B 7. Combine the two shing belt with Chain lever or Chain block. 8. Combine both ends of the pipe by pulhng chain block and helped lift with crane. 9. Make sure itis correct pipe joint. 10. Pipe joint connection do by following the steps - steps as above. Traergronnd PRP Pipes PLTU KALIMANTAN SELATAN & (2X65 MW) a oS UNDERGROUND FRP PIPE Page Number INSTALLATION METHODS Sof7 Push O-Ring airproof spring gradually Moving direction 4 Hanging from the — ground to op, | Patio Picton () \ Le Figure 2. FRP Pipe Double O-Ring Joint Method dra FAP Pipes & PLTU KALIMANTAN SELATAN (2X65 MW) (ia) oS Doc. Number : UNDERGROUND FRP PIPE Page Number ferret INSTALLATION METHODS 6of7 43. Hydrotest for O-Ring Joint Testing is conducted with the aim to find the leak and the strength of operational pressure both at the joint and the overall installation. After visually checking the results, then followed by using a pressure tester testing. Procedure Process Including a Pressure Test ~ Holes in the screw joint first - Fill with water until it fully through the holes that have been available - Nipple input on that hole in the screw and plug, - Tighten the nut with pass key so as not to leak. ~ Pressure tester pumped from 0 up to 3 bar, hold 10 minute - Check visual, whether there is leakage. ~ Add pressure until 6.5 bar and hold during 30 minute - Check visual and make sure there is no leakage and decrease pressure on the gauge pressure, - Lower the pressure until 0 again with open drain on the pressure tester. - Noted the results of testing. ‘After all piping is complete plug and pressure test will be returned as the end of the entire series checking and testing. Testing is done by filling the water up to full installation with the ‘water pump pipe. Further providing pressure to move or less the same as the pressure test joint. 4.4, Lowering Pipe If lowering has been done mechanically (using equipment/ tool) so the Nylon sling has to use, and not permit using Wire Sling because FRP were fragile and cracked materials. Before lowering, you must making sure that pipe body totally be supported on sand bag and sand layer and clean from all foreign (sharp/ hard) possible material such as : stone, concreted, block, etc, which find it into excavating work. Lift down the pipe slowly and carefully, into clean hole (free from hard stone materials). Starting from end point step by step, laying on sand bag until finish, Tree FAP Pipes £ PLTU KALIMANTAN SELATAN (2X65 MW) Doe. Number : UNDERGROUND FRP PIPE Page Number eo INSTALLATION METHODS of 7 Until all pipes laying down into hole, inform to Civil Department (Surveyor) to re-check its eveling/ elevation position, in order that conformed to determined elevation design. 45. Backfilling If the result of piping test has been approved by Client, so drain water inside pipe (Release Procedure), then back filling See drawing. secondary Bac ema boc \/ (requene) sau tm sopportin is zone Figure 3. General procedure for backfilling underground FRP Pipe Thidrgraimd FAP Pipos

You might also like