1. A quantitative method involves using a c. logic 6. Regardless of whether a more a. damage
_________________________depicting model qualitative or a quantitative analysis is mechanisms combinations of events to represent the used, the POF is determined by two and inspection effects of failure on people, property, the main considerations: effectiveness business and the environment : a. damage mechanisms and inspection a. POF and COF effectiveness b. risk analysis b. probability x consequence c. logic model c. damage mechanisms and damage d. Moore's Law modes d. internal and external damage 2. Combinations of process conditions and c. materials _____________________ for each of 7. Results of a quantitative analysis are b. numeric equipment item should be evaluated to construction usually __________________: identify active and credible damage mechanisms: a. consequence b. numeric a. pressures and temperatures c. logic models b. probability x consequence d. Buccheim's Law c. materials of construction 8. The basis for a qualitative probability of d. engineering d. COF failure analysis is: judgment 3. In general, an RBI program will be d. COF managed by plant inspectors or inspection a. consequence engineers, who will normally manage risk b. probability by managing the POF with inspection and c. POF maintenance planning. They will not d. engineering judgment normally have much ability to modify the 9. The consequence of loss of containment c. external ____________________: is generally evaluated as loss of fluid to environment the____________________: a. process flow b. failure mode a. process flow c. POF b. ground d. COF c. external environment 4. It is important to link the damage b. failure d. unit mechanism to the most likely mode 10. The data quality has a direct relation to d. accuracy resulting_________________: the relative _________________ of the RBI analysis: a. failure analysis b. failure mode a. precision c. consequence b. detail d. probability c. correctness 5. It is important to stress that the a. precision d. accuracy ________________________ of the data should match the complexity of the RBI method used :
a. precision b. accuracy c. analysis d. validation