Proposed Lay out for Culverts intend to use for interconnection of all Oxidation ponds

Across the Road


Marrum backfill

After Soil backfill

Ø1m DiamisionCalverts
typical 3 Calverts
separated by 60mm
(For water overflow)

Hard core stones


5Meters

Section A-A

PROPOSED PLAN FOR EXTENSION OF RAW WATER LINE TO NEW HWH ABLUTION AT INBATT-1 COMP

From Indbatt-1

BOREHOLE

Concrete Slab 500

LEGEND

DWP Dewatering
Offloading bye
pumpArea(concrete 500mm)

Oxidation-P-1

OXIDATION-1 FOR DEPOSITING


&DECONTAMINATION OF SEWAGE

Soil embarkment

OXIDATION-1 FOR DEPOSITING SEWAGE(WW)