Professional Documents
Culture Documents
NO Incident
1 INC0020000
2 INC0020001
3 INC0018484
4 INC00124848
5 INC001485
6 INC00124857
7 INC00234567
8 INC001567
9 INC00139876
10 INC00138765
11 INC001567
12 INC00987654
13 INC00186534
14 INC0019609
16 INC0013910
17 INC00140378
18 INC00140941
19 INC00145140
20 INC0015061
21 INC00150612
22 INC00106121
23 INC0005713
24 INC00002433
25 INC00196433
Description
Hi Team,
While Posting invoice#INV2021-35214 in MIRO under PO# 4500000234 by miss i clicked on Hold.
now the invoice is Hold under the DOC# 5100300087, i am not able to reverse this DOC.
Kindly reverse from backend and confirm ASAP, it should be resolved on urgent basis.
Unable to upload files: it uploads folders in the PR's attachments field and unable to delete attachment, in
order to correct
Message type: E
Code: ME217
Message text: External number assignment not defined for document type FO
PO 454000005 signature do not match with the for FG in TDI process for XXXX
PR 17110192 - First Approver John Rider does not see the PR to approve in his list. In admin query PR shows
as "Waiting for Approval"
For PO 4510000003 - Goods receipt issue, I am not able to perform GR. I think the PR and PO type is
incorrect, please see how we can modify this PO type so I can perform GR by MIGO. Attached email shows
the GR error in MIGO.
Not able to add a shipping address also received an error code for the vendor information
PO 4540000004 it's fully approved but VOID in PDF document, also the approver's signature must me John
Unable to receive PO 4560000009, see error message attached. Ref PO 4560000009 line 4 tied to material
A1456g3
PO 454000009 with account assignment V does not show the name of the approver under the signature. The
signature is maintained ZMM_BPMM
TwoZNB PRs (PR 17000007 and PR 17000008) attached are waiting for approval from John and need to be
approved right away, but John is away.
Error Message on PO placement when I tried to covert PR#00171106300/00001 into a standard inventory
PO. Details see attached email I sent to our buyer team.
URGENT: Storage Location 2000 not found for Material MH-10002-A1351 in plant 1051
Resolution
Please use transaction MIRO in change mode and select from menu bar as shown in attachment , select delete and click on it,
Hold documents can not be canceled using MR8M, Please follow the steps, it will solve the issue.
The PO #4540088359 does not have Address number that is why you are unable to print PO.
Pls shorten the lenght of the file description and while you attach the file make sure you place them on the desktop.
Pls note that you can use ME52N transaction for downloading / Deleting the file. Pls see attached screenshot from transacion ME52N
Analysis & Root cause: The error message was due to the length of the attachment
Solution: Shortened the length of the attachment which enabled the creation of PR and the attachment was saved to PR succe
Maintained the DOA table with correct user name and signature.
Background Job "ZMAT_REVISION_SAP" is scheduled to run for every one hour and picks up available material data to trigger MATMAS Ido
resulting in to create 556 entries on 21.05.2020.
Job was scheduled to start from 21.05.2020 06:00 am allowing 556 available records to pick up in 1st instance. Please revert back if anything
required.
PO's are retriggered again from SAP creating outbound Idocs, awaiting confirmation if same has been received by Boomi team and 3PL.
PO 4510000003 is created in the combination of account assignment category K and Item category B which is used only for framework order
PO) .
As per the Std. SAP process system will not allow to do GRN as per configuration settings.
Framework order will be used only to process invoice receipt and without Goods receipt.
Provided details about process flow , and in order to have new ship to address, need to created new storage locations with required address u
plant 1000 , then new storage location can be selected in ship to address tab.
We had a screen sharing session with user ,there is authorization issue to certain transactions
Attached the screenshot below for your reference
1) FBL1N
2) SU3
Issue: PR Work item not showing up in John's inbox or it is disappeared after certain period of time.
Issue Analysis:
This is a complex workflow: let me walk you through the process what happened:
This process was continued on 23rd ,24th, 25th, 26th, 27th , 28th and 29th.
Continued…
On 29th, I believe or I am suspecting that it tried reprocessing the same procedure, but looks like you are on vocation, in that case workflow tr
find the substitute for the approver. It did not find the substitute who can approve on behalf of you. So process was hug up in finding the appro
Call back if there is no action:
Please check the start date and end date of the task:
On 29th of August, work item did not find the agent to send the email or your substitute to send an email, work item did not sent and failed:
Resolution:
I hope this clearly explains why you don't see the work item in your inbox. If there is a possibility you can ask the requestor to retrigger the app
from purchase requisition by changing any parameters with which it will retrigger the workflow . If there it not possible to retrigger the approval
process then we need to explore the options of populating the information of email address in this failed work item and reprocess the work item
that you can see the emails again.
Note: During our call you have mentioned that you are keeping the work items for months together in your inbox, everyday workflow is monito
work item and once it is reaching the deadline time, it is reprocessing the work items again and again day after day.
was able to re-trigger the workflow from SWUS since he has FFID(Firefighter).
2) The Void watermark is shown because Version management is not checked in PO.
Kindly make a tick in Version tab of PO.
We have analyzed issue further and found that issue is with subcontracting stock against sales order. No need to do 412 E movement posting
In order to resolve issue please foollow below steps.
1. Create outbound delivery for the PO , using T code ADSUBCON
2, Post goods Issue
3. Post MIGO
Please refffer previous PO # 4500600007 for detailed flow .
After these steps issue will get resolved,
Analysis:
When I do the print preview of the PO(4540000009) provided in the ticket does not show any signature:
Here is the logic in the program:
Step1: fetch the cost center from EKKN-KOSTL. If cost center does not exists, take the WBS from PO line and get cost center associated with
from PRPS-AKSTL.
Step2: Based on the cost center go to ZMM_BPMM table table and get the signature.
Step3: Based on cost center ( KOSTL) get the user Id associated with signature from ZMM_BPMM table.
Step4: Based on the user ID found in the above step get the name from USER_ADDR table.
In the case of PO in the subject line, there is no cost center but WBS is present:
Based on WBS, PRPS-AKSTL has value 12000. And table ZMM_BPMM has below entry:
So signature name is MM_PURCH_JOHN.
Next step is to find the user id: here is the bug in the program logic which was introduced as part of below TR in the month of April: if you notic
debug screen XX_USER is blank, that is the reason no name is displayed in the PO.
If you notice the select query in line 1945 is fetching the user ID from ZMM_BITMAP_SIGN table based on KOSTL only, where in our PO ther
KOSTL but we have WBS , no logic to fetch cost element associated with WBS and get the entry from the Z table based on AKSTL. Which is
no user name to fetch and no name to fetch from USER_ADDR table.
Resolution:
Correction 1: if you are looking for the name of the approver in the PO signature, we should maintain an entry in ZMM_BPMM table with cost
Correction 2: Program logic should be corrected to add logic to get the AKSTL based on WBS and get the person associated with the cost ele
for WBS
For PR 17110574 PO #4540087735 is already created on 07/09/2021 that is why getting the above error.
It is already sent for approval.
When checked for PR #17000007 , it looks that workflow is triggered correctly and approver is selected correctly from custom table.
We can not approve the PR in PR! system , we don't have any access and authorization to do that ,
This has to be authorized by John. Two action points can be done.
1. Release PR using ME54N if have urgency ,
2. Else change the approver ID in custom table using T code #ZPTP_PR_APPROVER , means instead of John's ID put the OD who can appr
retrigger workflow using T code SWUS.
We have analyzed the issue ,request you to please use ZNC PO NON- STOCK document type for creating the PO with reference to PR 0017
as you are creating NON-Inventory PR.
Batchjobs will be checked in SM37 tcode and failed batchjobs will be intimated to buyer
Access issue
y users and then move the TR to Production (Once TR is released in Dev by us - TR Movement to QA and prod will be done by SAP BASIS te
gainst hte investment PO in MIGO again
or TR movement to Prod to SAP BASIS team
Health checks means - did system perform good or any issues cameup will be checked
what to check daily would be very specific project and it varies from project to project
Initially batch jobs are scheduled using tcode SM36 whereas daily checks if batch job did run or not will be checked in SM37
IDOC is to transfer data btwn two systems so idoc failure results in data transmission issues
IDOC transfer status are chekced in We02/We05
will be checked in SM37