Professional Documents
Culture Documents
02 - 01 - 2022 - Enterprise Structure & Assignment and TR Release
02 - 01 - 2022 - Enterprise Structure & Assignment and TR Release
Will set up once for every client during implementation – How a company is defined (Very rarely in
support / roll out projects)
Organisation Hierarchy
Client
Tata Group (TG)
Company Code
Company Code
Tata Steel
Tata Motors (TM)
(TS)
Purchase
Organisation
Plant Plant Plant
TM - Chennai TM - Bangalore TS - Chennai
S Org Configured
Definition Nomenclature SPRO path
No Structure by
Any organisation FICO 4 digit Alpha Numeric
1 Client
group Consultant Ex: AAAA, 1234, AA11
Individual organisation
where P&L, Balance
Company FICO 4 digit Alpha Numeric Created under
2 sheets are maintained
Code Consultant Ex: BBBB, 5678, BB56 Finance Accounting
separately. Has its own
P&L accounts
Any unit where
materials are
manufactured,
consumed, procured,
stored. Created Under
Manufacturing Unit Logistics General
MM 4 digit Alpha Numeric
3 Plant Distribution Centre (Enter Prise
Consultant Ex: CCCC, 9101, CC91.
Maintenance Facility Structure -
Dealer ships Definition)
1 Plant – 1 CC – Yes
1 Plant – Multiple CC -
No
A location in a plant Created under
where materials are Material
Storage MM 4 digit Alpha Numeric
4 stored Management (Enter
Location Consultant Ex: DDDD, 9876, DD76
SL are always Prise Structure -
created in a PLANT Definition)
Created under
A department which is
Material
Purchase responsible for MM 4 digit Alpha Numeric
5 Management (Enter
Org Purchasing the Consultant Ex: EEEE, 5432, DD54
Prise Structure -
materials
Definition)
A Sub Department like mechanical, service, electrical, raw material, spares procurement department
SPRO: Only T code where each and Every all the Configuration happens
2. Valuation Level:
1st step in SAP MM to configure before creating plant
Its nothing where the valuation happens either plant or company code
Generally valuation level is mainly configured only for plant where all the valuation incurs / happens
because all plants will not have same price, same operating expenses
Valuation Area is configures for banking sectors etx where they don’t have plants and don’t
manufacture anything
Whenever any new configurations is done in SAP, it will automatically generate a Transport Request
no and click on create request to create new TR
Enter Description and Save to generate the new TR request number by the SAP automatically
Click on continue to copy from plant to new plant (GEET) created
Then you can check which plant you have selected to copy / create new plant in selected objects and
can verify the same in completed activities
SPRO path to change Plant name and address since it is copied from another plant
SPRO
SAP reference IMG
Enterprise Structure
Definition
Logistics – General
Define, copy, delete, check plant
Click on Define, copy, delete, check plant
Double click on GEET plant to change the name and its address
Click on address to change all the address of old plant and create new address for the new plant
GEET and enter all the address details of the new plant GEET and the SAVE
SAP allows 1 address for a Plant but allows multiples address for Storage Locations
Once saved, TR will be raised and save to save the data
4. Storage Location: SL are created only under a PLANT
SPRO path to create Storage Location
SPRO
SAP reference IMG
Enterprise Structure
Definition
Material Management
Click on Maintain Storage Location
Select a Storage Location and click on Addresses of Storage Location to enter address of the selected
SL and select no of addresses required for the Storage Location (CS01) after selecting on NEW Entries
and then enter the address (click on address button)
Enter Storage Location address and then SAVE to create Transport Request
SAP allows 1 address for a Plant but allows multiples address for Storage Locations
Note: 1 Plant have multiple storage locations and 1 Storage location can have multiple plants
7. Assignments –
SPRO path to reach assignment
SPRO
SAP reference IMG
Enterprise Structure
Assignment
*Delete the existing assignment of plant (GEET) (as it is copied from other plant) to assign the new
plant (GEET) to the NEW Company Code
Assign the Plant (GEET) to Required Company Code click on New Entries and then save
Note: If you want to change the Assigned Plant (GEET) to other (as per business requirement)
company code (1000) also, you can do it.
What Plane Code should come under the what company code should be decided based on the
business requirement